Item No Quantity Description of Item Unit Rate Rate in words Amount in (Rs.)
A06 Providing and Constructing Solid Cement concrete block
masonry in Cement mortar 1:6 (1 cement : 6
Manufactured Sand) using factory made, load bearing,
approved quality, Grade A as per IS:2185 (Part II)-2005,
Density of blocks not less than 1500kg/cum Minimum
average Compressive strength of units 4.0N/sqmm and
Minimum strength of individual units 3.2N/sqmm, set to
level plumb including setting in position, providing
scaffolding, curing, raking out joints wherever required
etc., complete with all leads and all as per specification
and directions of the Engineer-in-charge. IN
SUPERSTRUCTURE UPTO 3.50M FROM FFL OF GF.
A07 210.00 Providing & laying in position machine batched, machine CUM
mixed and machine vibrated design mix cement concrete
of specified grade for reinforced cement concrete
structural elements, using graded hard granite stone
aggregates of maximum 20mm nominal (down graded)
size obtained from approved quarry including fine
aggregates conforming to latest IS 383 and cement all as
per approved design mix proportions conforming to latest
IS 10262 with minimum cement content for durability
including supplying and providing concrete cover blocks
etc., which shall be followed as per latest IS:456-2000
including mixing, transporting, placing, vibrating,
compaction, finishing to required levels, curing etc.,
complete all as per specifications but excluding cost of
form work and steel reinforcement. Rate to include labour
for keeping embedments if any wherever required while
casting. Rate also to include lift charges and scaffolding
for all depths/ levels from FFL / GL.
Page 2
Item No Quantity Description of Item Unit Rate Rate in words Amount in (Rs.)
The design mix proportion shall clearly indicate cement
:Graded Manufactured Sand : coarse aggregate : water
cement ratio and approval shall be obtained from
Engineer-in-charge for initial and subsequent mixes as
and when there will be change in quarry / materials for M-
30 grade reinforced cement concrete,etc., all work above
plinth level upto the levels indicated below from FFL of
GF.
8.00 ii) Above 3.50m level to 6.00m level from FFL CUM
60.00 ii) Above 3.50m level to 6.00m level from FFL SQM
Page 3
Item No Quantity Description of Item Unit Rate Rate in words Amount in (Rs.)
A11 Supplying and laying steel reinforcement for all R.C.C
items including decoiling, cutting, hooking, bending,
cranking, fabricating to required shape, placing in position
and tying the system with soft drawn annealed binding
wire of diameter not less than 1.00mm with 2 strands etc;
complete all as per specifications at all heights. (Binding
wire will not be measured for payment).
0.70 ii) Structural steel works and welded built up sections in M.T
items above but with MS Plates of any thickness.
0.05 iv) Structural steel works as in item above but with MS M.T
angles, tees and other sections.
Page 4
Item No Quantity Description of Item Unit Rate Rate in words Amount in (Rs.)
A13 800.00 Supplying, fabrication and fixing of hand rails for staircase KG
using 30mmx30mm stainless steel hollow square section
(Stainless steel having Grade AISI 304) for vertical
ballustrades, fixing at 300mm c/c with hieght 900mm
above finished level of the platform 50mm outer dia of
stainless steel hollow tube for top handrails fixed over
20mm dia stainless steel hollow tube including providing
3 nos 20mm dia SS hollow tube parellel to hand rail
including fixing 40mmx 6mm stainless steel plate 100mm
long at the side of step by using necessary fixtures for
fixing the ballustrades, including cutting the section to the
required length line, welding, grinding etc.. as per
specifications, drawing and directions of Engineer in
charge at all heights.
A15 550.00 Providing and laying cement concrete interlocking paver SQM
blocks flooring using approved shape, size and colours
with required combination of colours of blocks having
55mm thick load bearing strength not less than M-20
grade manufactured by M/s. Heeralal / M/s. Vissco or
equivalent, close jointed over bed of 75mm thick
Manufactured sand to a tight pattern, laid to proper line
and level including bedding down the completed surface
with a plate vibrator or by firmly topping level with mallet
and a large flat piece of timber, finishing by brushing
clean dry sand over the surface to fill all the joints
thoroughly including fixing the edge restraint laying blocks
etc., complete all as per manufacturers specifications and
directions of Engineer in charge. (Rate to include cost of
paver blocks, sand and labour etc.). The arrangement of
pattern of blocks shall be as per architectural drawings.
Page 5
Item No Quantity Description of Item Unit Rate Rate in words Amount in (Rs.)
A17 Supplying and fixing aluminum industrial troughed .
coloured roofing sheet as per the following specifications:
AA3105 alloy, H18 temper colour coated of Hindalco
Industries Ltd. or equivalent using tight frames securing
to purlins by welding or with self tapping fasteners and a
metal washer and PP cap assembly to ensure water tight
fastening points at crest. The entire operation shall be
done as per the manufacture's specifications and as
directed by Engineer-in-charge. The quoted rate shall
include the cost of materials and roofing sheet
overlapping (such as aluminium sheets, self-tapping
fasteners, washers, etc.) and necessary staging/platform
required for fixing the above and specialized labour for all
the activities etc., complete all as per specifications and
as directed by Engineer-in-charge.
A20 565.00 Painting external plastered surfaces with two or more SQM
coats of 100% acrylic exterior emulsion paint of approved
make and colour (ULTIMA PROTEK (Top coat) of Asian
paints or equivalent) over a coat of suitable water
proofing primer and base coat specified by manufacturer
having protection against fungal growth, flaking, fading,
alkali and UV degradation and to give an even shade with
required finish including cleaning the surfaces, filling the
crevices with approved filler, scaffolding, curing, etc.,
complete all as per specifications.
PART A TOTAL
Page 6
Item No Quantity Description of Item Unit Rate Rate in words Amount in (Rs.)
PART B : FENCING WORKS
B01 35.00 Earthwork in excavation for FOUNDATION TRENCHES in CUM
ALL KINDS OF SOILS including dressing of sides,
ramming of bottom, disposing the surplus excavated
materials within a distance of 50m and lift 1.50m complete
as per specifications. (Disposed soil to be levelled by
breaking clods if any and neatly dressed).
Page 7
Item No Quantity Description of Item Unit Rate Rate in words Amount in (Rs.)
B06 Providing rigid and water tight centering and shuttering
using best quality wood/ plywood/ steel forms and
centering with steel props, acro tubes etc. The centering
(vertical props, bracings etc.) shall be of steel tubes with
or without extension pieces or built-up section of rolled
steel, including strutting, propping, bracing, staging etc.,
complete for all RCC items fixed in position as required
including labour for careful removal of form work etc.,
complete all as per specifications up to plinth level in
Horizontal / Vertical/ Slanting surfaces.
B08 100.00 Supplying and fixing Stainless steel chain link fencing to SQM
FRP poles using SS 304 chain link fencing tied to the
post with 25x2.5mm SS flats using necessary SS screws
etc. including providing 10g SS wire horizontally at top
and bottom, cost of all materials required for the work,
etc; all as directed by the Engineer-in-charge using SS
chain link fencing of size 3" x3"x 12g. Note: The rate is
excluding the cost of SS flats which will be measured
elsewhere as a separate item.
B09 50.00 Supplying, fabricating and erecting in position FRP poles MTR
of potruded profile square pipe 50x50x5mm of M/s.
Everlast or equivalent including cutting, hoisting, fixing in
position all as per approved drawings and specifications
at all heights.
PART B TOTAL
Page 8
Name of work: Construction of Rocket Launch Viewing Shelter near Space Museum at TERLS, VSSC, Thumba (Civil works)
SUMMARY OF COST
TOTAL Rs.
Rebate Percentage
Rebate Amount Rs.
NET TOTAL Rs.
GRAND TOTAL Rs.