Insulation (All Types) Check List

This 3 sentence summary provides the key details from the shutdown check list document: The document is a checklist for insulation work during a shutdown of olefins and utilities at a client's site in 2002, listing 17 items to be confirmed including removing and reinstalling insulation, cleaning equipment, installing vapor seals and insulation correctly, and verifying identification and nameplates are visible.

Uploaded by

Okas Paskal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
573 views1 page

Insulation (All Types) Check List

This 3 sentence summary provides the key details from the shutdown check list document: The document is a checklist for insulation work during a shutdown of olefins and utilities at a client's site in 2002, listing 17 items to be confirmed including removing and reinstalling insulation, cleaning equipment, installing vapor seals and insulation correctly, and verifying identification and nameplates are visible.

Uploaded by

Okas Paskal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

SCL No: M471

Shutdown Check List Rev: 0


Date: 01.04.02
Insulation Page 1 of 1

Shutdown: Olefines & Utilities - 2002 Client: Qenos


Work Pack No: Area Ref:
Description: Equipt / Item No:
Insulation type: Thermal / Cryogenic / Acoustic / Personal*
Area Confirmed Other
Item Item Description Supervisor QAR (Specify)
1 Cladding and insulation removed and lowered to grade
2 Pipework / equipment cleaned of residual material
3 Confirm required condition of pipework / equipment
4 Confirm required insulation and cladding materials
5 Confirm required thickness and projection dimensions
6 Vapour seal installed correctly
7 Insulating materials for main component installed correctly
8 Foam fill mixing, temperature and procedure correct
9 Valve insulation installed correctly
10 Flange insulation installed correctly
11 Supports and attachments insulated and sealed correctly
12 Leak indicators installed correctly, sealed and visible
13 Cladding correctly (re)installed, fixings to specification
14 Cladding seams orientated correctly and weatherproofed
15 Penetrations boxed / clad* and sealed correctly
16 Personal barrier materials correct and (re)fitted correctly
17 Pipework / equipment identification (re)applied and visible
18 Nameplates visible and (re)sealed correctly
19 Cladding offcuts and surplus materials removed

Comments: (Applicable to this Check List) Attachments: (Completion and/or Special Test Reports)
* Delete as appropriate

Verified by: (Quality Management, Name and Date) Reviewed by: (Specify, Name and Date)

/ / / /