The document provides specifications for a three coat painting system including a primer coat, intermediate coat, and top coat. It lists the job number, project name, surface preparation, paint specifications including manufacturer (SA), viscosity (VS), dry film thickness (DFT), thickness range, pot life, and minimum and maximum painting intervals for each coat.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100%(2)100% found this document useful (2 votes)
1K views
Paint System A1
The document provides specifications for a three coat painting system including a primer coat, intermediate coat, and top coat. It lists the job number, project name, surface preparation, paint specifications including manufacturer (SA), viscosity (VS), dry film thickness (DFT), thickness range, pot life, and minimum and maximum painting intervals for each coat.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1
PAINTING SPECIFICATION
PRIMER COAT INTERMEDIATE COAT TOP COAT
JOB NO PROJECT SA VS DFT RANGE POT LIFE PAINTING INTERVAL VS DFT RANGE POT LIFE PAINTING INTERVAL VS DFT RANGE POT LIFE PAINTING INTERVAL PAINT SPEC PAINT SPEC PAINT SPEC (%) (µ) (µ) (30 °C) Min Max (%) (µ) (µ) (30 °C) Min Max (%) (µ) (µ) (30 °C) Min Max EPOALL HS LIGHT GREY V-FLON #100H T/C KASHIMA 83 125 Up to 200 3.0 hrs 5 hrs 1 mths ZETTAR OL-HB-N GREY (EPONICS THIN) H72-80D 11619 STEEL STRUCTURE 2½ 68 75 60 - 100 3.0 hrs 12 hrs 6 mths 46.8 25 ± 25 3.0 hrs 12 hrs 5 days (A1) (ZETTAR OL THIN) V-FLON Im/C (V-FLON T/C THIN) 47 30 ± 30 5.0 hrs 16 hrs 7 days (V-FLON Im/C THIN)