13.2kV Incomin G Meralco Service 13.2kV Incomin G Meralco Service

This document provides a 3-sentence electrical diagram for a 13.2kV solar power generation project located at [LOCATION] and owned by [OWNER'S NAME]. The diagram shows the 13.2kV incoming service from Meralco connecting to a fuse cutout and CT meter before traveling to the main circuit breaker and distributing 400V/230V 3-phase power throughout the site. Incoming solar power from the solar array is routed through an inverter and disconnect before integrating at 400V/230V to serve loads on the property. The design was completed by [DESIGNER] as a professional electrical engineer.

Uploaded by

lan
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views

13.2kV Incomin G Meralco Service 13.2kV Incomin G Meralco Service

This document provides a 3-sentence electrical diagram for a 13.2kV solar power generation project located at [LOCATION] and owned by [OWNER'S NAME]. The diagram shows the 13.2kV incoming service from Meralco connecting to a fuse cutout and CT meter before traveling to the main circuit breaker and distributing 400V/230V 3-phase power throughout the site. Incoming solar power from the solar array is routed through an inverter and disconnect before integrating at 400V/230V to serve loads on the property. The design was completed by [DESIGNER] as a professional electrical engineer.

Uploaded by

lan
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT TITLE

LOCATION

OWNER'S NAME

13.2kV
13.2kV
Incomin
g Incomin
Meralco SHEET CONTENTS

Service g
Meralco
Service

Different Grid Interconnection


Fuse Service System
Cut-out Fuse
Cut-out

DESIGNER

400V230V Y s
240V Ys PROFESSIONAL ELECTRICAL
ENGINEER
CT M
CT M PRC REG NO.

PTR NO:

DATE ISSUED:

PLACE ISSUED:
Main CB
400V230V
400V230V Yp Main CB
PHOTOENERGY
Y ENGINEERING POWER GENERATION PROJ ECT MA NAGE ME NT

Incoming Solar Main


400V230V
Solar AC
Y
Inverter Disconnect
Incoming REPUBLIC ACT 545
Solar

Supply
Solar Main AC
Inverter Disconnect OWNERSHIP OFTHE PLANS, SPECIFICATION AND OTHER
Supply 240V Yp CONTRACT DOCUMENTS - DRAWINGS AND SPECIFICATION AND
OTHER CONTRACT DOCUMENTS DULY SIGNED AS AN
Load Serve INSTRUMENT OF SERVICE, ARE INTECTUAL PROPERTYAND
DOCUMENTS OF
,
Load Serve WHETHER THE OBJECT FOR WHICH THEY ARE MADE IS
EXECUTED OR NOT, IT SHALL BE UNLAWFUL FOR ANY
PERSON TO DUPLICATE OR TO MAKE COPIES OF SAID
DOCUMENTS FOR USE IN REPETITION OF AND FOR OTHER
PROJECTS OR BUILDINGS, WHETHER EXECUTED PARTLY OR
IN A WHOLE, WITHOUT THE WRITTEN CONSENT OF
,
400Vac 3P Y Voltage
240Vac 3P Y Voltage OR AUTHOR OF THE SAID DOCUMENTS.
Supply Supply
- ALL MEASUREMENTS ARE TO BE VERIFIED ON SITE BY
CONTRACTOR.
- ALL DISCREPANCIES ARE TO BE IMMEDIATELY
REPORTED TO ARCHITECTS AND PROJECT
MANAGERS
- CONTRACTORS ARE TO PREPARE AND SUBMIT SHOP
DRAWINGS TO ARCHITECTS PRIOR TO
COMMENCEMENT OF WORK

FOR CFEI
DATE: BY:

DRAWN BY SHEET NO: