Financial Proposal To Develop Diversification For Financial Sustainability Manual /framework

The consultant submitted a financial proposal totaling 288,000 Ethiopian Birr to Project HOPE for developing a manual and framework to help diversify funding sources and ensure financial sustainability. The proposal outlines tasks such as conducting a review and assessment over 11 days, producing reports, developing the framework and materials over 20 days, training delivery over 8 days, and a final report. The requested price is subject to negotiation.

Uploaded by

feyera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views

Financial Proposal To Develop Diversification For Financial Sustainability Manual /framework

The consultant submitted a financial proposal totaling 288,000 Ethiopian Birr to Project HOPE for developing a manual and framework to help diversify funding sources and ensure financial sustainability. The proposal outlines tasks such as conducting a review and assessment over 11 days, producing reports, developing the framework and materials over 20 days, training delivery over 8 days, and a final report. The requested price is subject to negotiation.

Uploaded by

feyera
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Financial Proposal to Develop Diversification for Financial

Sustainability Manual /Framework

Submitted by: Development Studies Associate

Submitted to: Project HOPE The poeple to people health foundation Inc.

February 2019
Addis Ababa
Financial Proposal
The consultant requested a price amount of 288,000.00 (two hundred eighty-eight thousand)
Ethiopian Birr [ETB] including all government taxes and deduction. The price is subject to
further negotiation.

S\N Cost-Heads Unit Quantity Unit cost Total cost


1 Desk review and rapid Days 11 3,000.00 66,000.00
verification assessment,
2 consultants
2 Produce brief report of Days 3 3,000.00 18,000.00
the desk review process
and outcome of the
verification exercises, 2
consultants
3 Developing DRMD Days 20 3,000.00 120,000.00
Framework and Financial
Sustainability Strategy
Guide, and training
materials, 2 consultants
4 Incorporate PHE Days 2 3,000.00 12,000.00
feedback and finalize the
training materials and
ready for the training, 2
consultants
5 Delivery of hands on Days 8 3,000.00 48,000.00
training to LIP staff and
selected regional
HAPCOs/HBs, 2 consultants
Prepare and submit a brief Days 4 3,000.00 24,000.00
accomplishment report, 2
consultants
Total price requested 288,000.00