Product/ Part Name: Model: Product / Part No.: Defect: Rework To Be Carried Out On Part / Product (To Be Filled by Qa)
Product/ Part Name: Model: Product / Part No.: Defect: Rework To Be Carried Out On Part / Product (To Be Filled by Qa)
LINE)
DATE:
Product/ Part Name:
Model :
Defect:
REWORK INSP. BY
(NAME & SIGN)
QA ENGINEER DATE :