0% found this document useful (0 votes)
194 views1 page

DG2003 Test Bench Data Sheet: Weight and Dimensions

Banco de pruebas para perforadoras hydráulicas desarrollado por Delta Grup. Test bench for hydraulic drifters developed by Delta Grup. For further info: +90 543 898 1718

Uploaded by

Alma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
194 views1 page

DG2003 Test Bench Data Sheet: Weight and Dimensions

Banco de pruebas para perforadoras hydráulicas desarrollado por Delta Grup. Test bench for hydraulic drifters developed by Delta Grup. For further info: +90 543 898 1718

Uploaded by

Alma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DG2003 Test bench data sheet

Weight and dimensions:

*Total weight kg 1650


*Dimensions (cm):
Length 251
Heigth: 95
Width: 90

10” Touch screen

*Fully electronic controlled


*Electronic control system for motors, pumps and valve settings
*Interface can be used in English, Spanish or Turkish.
*Generation of reports and graphics.
*With option to USB output or print reports.

SENSORS:

*Electronic control from digital panel


*Impact power sensor (kW)
*Frequency sensor (Hz/S)
*Hydraulic rotation brake and internal leak detection
of the hydraulic motor
*Damping pressure sensor
*NEW FEATURE* Enabled to test EXTRACTOR UNIT DRIFTERS

GENERAL CHARACTERISTICS:

*10 mm steel plate


*33kW electric motor 1500 RPM
*AVO 71 hydraulic pump BOSCH-REXROTH

*The installation does not require a specialized technician of Delta Grup, however,
if the client wishes, one is sent (the flight expenses and accommodation must be
covered by the customer)
PAYMENT SCHEDULE - COMPLETE TEST BENCH

1st Payment 01.03.2019 25% START MANUFACTURING
2nd Payment 22.03.2019 25%
3rd Payment 13.04.2019 25%
4th Payment 07.05.2019 25% End of manufacturing (shipping & insurance must be paid by customer)