0% found this document useful (0 votes)
62 views4 pages

AR492 Midterm Construction Drawings: No. Description Date

The document is a room schedule listing details of four rooms in a building. Room 101 is an open office measuring 448 square feet. Room 102 is a work room of 488 square feet. Room 103 is an 80 square foot washroom/WC. The kitchen in Room 104 has an area of 101 square feet.

Uploaded by

trung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views4 pages

AR492 Midterm Construction Drawings: No. Description Date

The document is a room schedule listing details of four rooms in a building. Room 101 is an open office measuring 448 square feet. Room 102 is a work room of 488 square feet. Room 103 is an 80 square foot washroom/WC. The kitchen in Room 104 has an area of 101 square feet.

Uploaded by

trung
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

{3D}

Room Schedule
Room Number Room Name Room Area
0" / 12"

101 Open Office 448 SF


102 Work Room 488 SF No. Description Date
103 W/C 80 SF
104 Kitchen 101 SF

1" / 12" 1" / 12"


1" / 12"

0" / 12"
1" / 12"

0" / 12"
0" / 12"

AR492 Midterm
12 "

Construction
0" /

2
Site Drawings
1" = 10'-0"

Cover Sheet

Project Number 06
Date 06/03/2019
Drawn By
Trung Nguyen

2019-03-06 11:27:11 PM
Checked By
Nathaniel Adie

A001
Scale 1" = 10'-0"
A201

48' - 6"
6' - 3" 3' - 4" 5' - 4" 3' - 4" 11' - 4" 3' - 0" 6' - 0" 3' - 0" 3' - 7" 3' - 4"

W3 W3

4' - 7"
11' - 4"
3' - 4"
W1 W1
2
A301

3' - 5"
W1 W1

Work Room

6' - 7"
8' - 3"
102

1
A301 D4

3' - 4"
A201 4 W1 W1
2 A201

Open Office
101

24' - 6"
8' - 0"

4' - 8"
D3
Kitchen

Elevation 1

3' - 4"
Kitchen
W1 104 W1

" 3 A301
-9
2'
R
4
Kitchen
8' - 3"

Elevation 2

6' - 7"
W/C
103

D1 D2

W1 W2
4' - 7" 3' - 0" 8' - 11" 3' - 4" 9' - 6" 2' - 0" 9' - 7" 3' - 0" 4' - 7"

A201

Floor Plan
1
1/4" = 1'-0"

No. Description Date

1" / 12" 1" / 12"


2
A301
1" / 12"

1
A301

AR492 Midterm
Construction
Drawings
1" / 12"

Plan

Project Number 06
Date 06/03/2019
Drawn By
Trung Nguyen

2019-03-06 11:27:25 PM
Checked By
Nathaniel Adie

2
Roof Plan
1/4" = 1'-0" A101
Scale 1/4" = 1'-0"
2
A301

1
A301

Roof Roof
11' - 0" 11' - 0"

Level 1 Level 1
0" 0"

North East
1 2
1/4" = 1'-0" 1/4" = 1'-0"

No. Description Date

1
A301

2
A301

Roof Roof
11' - 0" 11' - 0"

Level 1 Level 1
0" 0"

AR492 Midterm
3 South
1/4" = 1'-0"
4 West
1/4" = 1'-0" Construction
Drawings
Elevation

Project Number 06
Date 06/03/2019
Drawn By
Trung Nguyen

2019-03-06 11:27:34 PM
Checked By
Nathaniel Adie

A201
Scale 1/4" = 1'-0"
2
A301

1
A301

Roof
11' - 0"

Roof
11' - 0"

W1 W1
D4 W3 W3

Level 1
0" W1
D4

Level 1
Foundation 0"
-5' - 0"

Foundation
-5' - 0"

1 Longtitudinal Building Section 2 Tranverse Buildign Section


1/4" = 1'-0" 1/4" = 1'-0"

Door Schedule
Mark Count Family Width Height Thickness

D1 1 Single-Glass 1 3' - 0" 7' - 0" 2"


D2 1 Single-Glass 1 3' - 0" 7' - 0" 2"
D4 1 Double-Glass 1 6' - 0" 7' - 0" 2"
D3 1 Single-Flush 3' - 0" 7' - 0" 2"

No. Description Date

Level 1 Level 1 Window Schedule


0" 0"
Type Mark Count Family Width Height Head Height

Kitchen Elevation 1 Kitchen Elevation 2 W1 1 Double 3' - 4" 4' - 6" 7' - 6"
3 4
1/2" = 1'-0" 1/2" = 1'-0" Hung-Stone
Lintel
W1 1 Double 3' - 4" 4' - 6" 7' - 6"
Hung-Stone
Lintel
W1 1 Double 3' - 4" 4' - 6" 7' - 6"
Hung-Stone
Lintel
W1 1 Double 3' - 4" 4' - 6" 7' - 6"
Hung-Stone
Lintel
W1 1 Double 3' - 4" 4' - 6" 7' - 6"
Hung-Stone
Lintel
W1 1 Double 3' - 4" 4' - 6" 7' - 6"
Hung-Stone
Lintel
W1 1 Double
Hung-Stone
Lintel
3' - 4" 4' - 6" 7' - 6"
AR492 Midterm
W1 1 Double 3' - 4" 4' - 6" 7' - 6"

W1 1
Hung-Stone
Lintel
Double 3' - 4" 4' - 6" 7' - 6"
Construction
Hung-Stone
Lintel Drawings
W2 1 Double 2' - 0" 2' - 0" 5' - 0"
Hung-Stone

W3 1
Lintel
Double 3' - 0" 3' - 0" 6' - 0" Section
Hung-Stone
Lintel
W3 1 Double 3' - 0" 3' - 0" 6' - 0"
Hung-Stone
Lintel
Project Number 06
Date 06/03/2019
Drawn By
Trung nguyen

2019-03-06 11:26:52 PM
Checked By
Nathaniel Adie
5 Kitchen View

A301
Scale As indicated

You might also like