Scaffold Handover Contractor

This document provides a scaffold handover certificate from Attiq Ur Rehman Cont. Est for work being done at the Al Reef Sugar Refinery project in Jizan Economic City. The certificate details that the scaffolding has been completed according to regulations and is structurally sound. It specifies that the scaffolding should only be used for its intended purpose and within the specified loading limits. The certificate also notes inspection requirements to ensure the scaffolding's ongoing safe use.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
248 views

Scaffold Handover Contractor

This document provides a scaffold handover certificate from Attiq Ur Rehman Cont. Est for work being done at the Al Reef Sugar Refinery project in Jizan Economic City. The certificate details that the scaffolding has been completed according to regulations and is structurally sound. It specifies that the scaffolding should only be used for its intended purpose and within the specified loading limits. The certificate also notes inspection requirements to ensure the scaffolding's ongoing safe use.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ATTIQ UR REHMAN CONT.

EST

SCAFFOLD HANDOVER CERTIFICATES


Company name AL REEF SUGAR REFINERY CO (JSC) Project title AL REEF SUGAR REFINERY

Location JIZAN ECONOMIC CITY Contract no.

Scaffolding – handing over certificate

To (contractor) ATTIQ UR REHMAN CONT. EST

Date Time

Description of scaffold or section of scaffold handed over

Drawing no. (where applicable)

Scaffolding, as described above, has now been completed and complies with the Work at Height
Regulations and current standards. It is structurally sound and should only be used and loaded in
accordance with our quotation number:

Use only for

Loading to be working lifts with distributed load of (kN/M² lbs/ft² per lift)

The detailed requirements of the regulations with regard to guard-rails, working platforms, toe-boards, bracing and ties have
been complied with.
In order to comply with the regulations, this scaffold must be inspected before being taken into use for the first time, at regular
intervals not exceeding seven days since the last inspection, after any event likely to have jeopardised the safety of the scaffold
and after any substantial addition, dismantling or other alteration. Particulars of each inspection must be recorded in a report of
inspection.
SCAFFOLD INSPECTOR

Name Position Signature Date

Certificate received on behalf of the contractor (ATTIQ UR REHMAN)

Name Position Signature Date