0% found this document useful (0 votes)
130 views1 page

Technical Calculation and Estimator'S Man-Hour Manual: Erection of Process or Chemical Plants

This document is the table of contents for a technical manual titled "Erection of Process or Chemical Plants" by Marko Buliæ. The manual is divided into 15 chapters that provide calculations, estimates, and man-hour requirements for piping, pipelines, steel structures, process equipment, storage tanks, welding, corrosion protection, insulation, and overhauls in petrochemical plants. The document also notes that it is a completed edition from 2003 with all rights reserved.

Uploaded by

dcf67my
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
130 views1 page

Technical Calculation and Estimator'S Man-Hour Manual: Erection of Process or Chemical Plants

This document is the table of contents for a technical manual titled "Erection of Process or Chemical Plants" by Marko Buliæ. The manual is divided into 15 chapters that provide calculations, estimates, and man-hour requirements for piping, pipelines, steel structures, process equipment, storage tanks, welding, corrosion protection, insulation, and overhauls in petrochemical plants. The document also notes that it is a completed edition from 2003 with all rights reserved.

Uploaded by

dcf67my
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Marko Buliæ

TECHNICAL CALCULATION AND ESTIMATOR'S

MAN-HOUR MANUAL

ERECTION OF PROCESS OR CHEMICAL PLANTS

I. PIPING ABOVE GROUND


II. PIPELINES
III. STEEL STRUCTURES
IV. PROCESS EQUIPMENT
V. STORAGE TANKS CYLINDRICAL AND SPHEROIDAL
VI. WELDING AND FLAME CUTTING
VII. CORROSION PROTECTION
VIII. THERMAL INSULATION
IX. ESTIMATES
X. PIPING ABOVE GROUND
ESTIMATE POINTS FOR BUILD-IN ITEMS
XI. WEIGHT FACTORS
XII. TECHNICAL CALCULATION
MANNER OF DATAS COMPILING
XIII. MAN HOURS FOR OVERHAULS IN
PETROCHEMICAL PLANTS
XIV. FACTORS AND MAN HOURS FOR PIPING AND
STEEL STRUCTURE WORKS IN CALL FOR
TENDERS OF “TECHNIP” COMPANY
XV. APPENDIX

ZAGREB, 2003.
(Completed edition)

All right reserved.


This book, or parts thereof, may not be reproduced
in any form without permission of the author.

You might also like