100% found this document useful (2 votes)
4K views

Construction - Responsibility and Scope Matrix

The document outlines the tasks, responsibilities, and timeline for a construction project. It lists key project phases including project initiation, preliminary design, schematic and design development, construction documentation, bidding and award, and construction administration. For each phase, it identifies the client, facility manager, design consultant, construction manager, contractor, and others responsible for completing the various tasks. The level of involvement from overseeing to performing the task is specified for each party.

Uploaded by

farhanyazdani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
4K views

Construction - Responsibility and Scope Matrix

The document outlines the tasks, responsibilities, and timeline for a construction project. It lists key project phases including project initiation, preliminary design, schematic and design development, construction documentation, bidding and award, and construction administration. For each phase, it identifies the client, facility manager, design consultant, construction manager, contractor, and others responsible for completing the various tasks. The level of involvement from overseeing to performing the task is specified for each party.

Uploaded by

farhanyazdani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Project Name: Date Prepared:

Task Client FM DC CM CONTRA OTHERS


CTOR

Project Initiation
Submit Project Requirement to FM CRE/FM O
Task facility requirements and funding O,P C
Prepare Design SOW O
Select Design Consultant O
Prepare Design Consultant Task Order O
Select Construction Manager O
Prepare Const Mgr Task Order O
Site Selection and Lease
Task Real Estate Transactions to initiate site search A O,P

Task Leasing Agent to Search A O


Review preliminary list C O,P
Task short list search O,P
Select Site C O,P
Preliminary Design Phase
Pre-Design Meeting; minutes, set schedule C O C P
Prepare Project Directory O P
Cost Control System O P
Schedule Control System O P
Program Management Information System O P
Correspondence Control System O P
Weekly Progress and Budget Status Report O P

Develop a Project Action Plan O P


Develop Project Program C O P C
Obtain Preliminary Project Data; Site & Building O P
survey, borings, as-built drawings, etc.
Apply for & track all Regulatory Permits O P
Schematic and DD Phases
Confirm Availability of:
Sanitary Service
Storm Water
Domestic Water
Gas Service O P
Fire Service
Electric Service
Telephone Service
Security Service
Prepare Construction Cost Estimate O C P
Maintain / Update Design Schedule O P C
Provide Info on Owner purchased Equipment O P C
Prepare & Submit Initial Budget/Schedule O C C
Review Initial Budget / Schedule, consolidate & O C P
resolve all comments
Approve site and Initial Budget/Schedule A O
Identify Long Lead Items, prepare orders O C P
Prepare & Submit 50% Design O P C
Review/Approve 50% Design O P
Order Long Lead Items O C P
70 % Design Document Phase
Determine Contracts to be Awarded O,P C C
Prepare 70% Plans O P
Prepare Specifications Outline O P
Prepare Structural Calculations O P
Prepare HVAC Cal & Narrative O P
Submit 70 % Documents O P
Review 70% Documents, submit comments C A P C
Review submittals, shop dwg. requirements list O P A
Consolidate comments; send to DP O P
Review & Approve 70 % Documents C O P
Update Design Schedule C O P C
Submit Design for Building Permit Review O P
95 % Design Submittal Phase
Obtain Code Review Approval O P Code official
Submit Design Drawings O P
Submit Specifications O P
Submit Draft Contract and all attachments O P
Review Documents, compile, and submit final C O C P
comments
Review & Approve 95 % Documents C O P
Review Plans for Constructability, & Criteria O P
Value Engineer Project O P
Develop General Contractor Bid List C O C P
Resolve and incorporate All Comments O P
Prepare Bid Documents, 100% O P C
Track All Permits O P C
Track All Project Documents O C P
Presentations at Public Hearings O P C
Evaluate A/E Performance O P
Evaluate A/E Invoices O P
Authorize A/E Invoice payment O
Approve CM Invoices O
Maintain Financial Tracking O P
Bid / Award Phase
Submit Bid Documents to FM Sourcing O P C
Review & approve bid documents O,P FM Sourcing
Distribute Bid Documents O P
Pre-Bid Conference O P
Prepare & Distribute Minutes O P
Attend Pre-Bid Conference C O C P C C
Prepare Addenda O P A
Review & approve addenda O P C FM Sourcing
Publish and Issue Addenda O P FM Sourcing
Schedule & Coordinate Bid Openings O C FM Sourcing
Receive, Open & Record Bids O C FM Sourcing
Review Bids and Provide Cost Analysis O C
Review & approve Sub-Contractors O P
Determination of Award C O P
Prepare Contracts - Validate Blanket Agreements O C
Sign Contracts O C P, FM Sourcing
Distribute Signed Contracts O C P, FM Sourcing
Issue notice to proceed O C P, FM Sourcing
Prepare Design Consultant Performance Evaluation O P

Construction Administration Phase


Approve Contractor’s Schedule C O C P C
Review/Approve Contractor Schedule of Values O C P
Breakdown
Pre-Construction Meeting C O C P C
Manage RFI process C O C P C
Submit Change Request C O C C P
Evaluate/Negotiate/Recommend Change Request O C P C
Change Orders C O P
Track & Distribute Documents O P
Review/Approve submittals O P C
Approve Shop Drawings O P C
Approve Test Reports O P C
Prepare Change Request Plans & Specs O P C
Weekly Project Progress Meetings O C P C

Review Contractor’s Progress Schedule O P C


Evaluate / Recommend Contractor Invoices O C P
Field inspections O C P
Meeting Minutes and Budget Status Reports O P
Submit Daily Field Reports O A P
Construction Photographs O P/C P/C
Prepare “As-Built” Plans O C P
Prepare O&M Manuals O C P
Coordinate Substantial Completion O C P
Substantial completion certificate O C P
Project Close Out Phase
Conduct prefinal inspection O P C C
Prepare / consolidate Punchlist(s) O P C
Coordinate Code Inspection O C P
Complete Punchlist Items O C P
Verify Completion of Punchlist Items O P C
Plan, Schedule & Control Final Inspection by All O C C/P P/C
Parties Incl. Regulatory Agencies
Site commissioning C O C C P
Coordinate Equipment Operation Training O P
Provide Maintenance & Operating Manuals O C C P
Provide All Guarantees & Reports O A P
Assemble & approve Close-Out Documents O P C
Evaluate As-Built Plans O C P
Prepare Record Set Drawings O P C
Sign “Certificate Of Final Completion O P A
Close-Out Design Consultant's Contract O C
Final Contract Acceptance O P
All Permit closeouts O A P
Occupancy certificate O A P
Post Occupancy Phase
Provide Post-Occupancy Assistance O C
Correct Warranty Issues O A P
Update FM Design Standards O P C
Lessons Learned O,P C C C C
Date Prepared:

OTHERS

Weekly mtgs intended for FM


CRE/FM, A/E and CM

FM to Assist
FM Security to Assist

Code official
FM Sourcing

FM Sourcing
FM Sourcing
FM Sourcing
FM Sourcing

P, FM Sourcing
P, FM Sourcing
P, FM Sourcing

A and E Disciplines req'd at weekly


Progress Mtgs.
C

You might also like