Hasil Tulangan Diperoleh Dari Luas Tulangan Atas (As Top) Terbesar Dan Luas Tulangan Bawah (As Min) Terbesar Melalui Program ETABS
Hasil Tulangan Diperoleh Dari Luas Tulangan Atas (As Top) Terbesar Dan Luas Tulangan Bawah (As Min) Terbesar Melalui Program ETABS
Hasil tulangan diperoleh dari luas tulangan atas (As Top) terbesar dan luas
tulangan bawah (As Min) terbesar melalui program ETABS.
Summary
Balok B1 Balok B2
As Top As Bot At Shear As Top As Bot At Shear
Story
(mm2) (mm2) (mm2/m) (mm2) (mm2) (mm2/m)
Tulangan Balok B1
ETABS 2016 16.0.0 License #*1S8ZDXPNU9WFLC4
Section Properties
b (m m ) h (m m ) bf (m m ) ds (m m ) dct (m m ) dcb (m m )
250 450 250 0 50 50
Material Properties
Ec (MPa) f' c (MPa) Lt.Wt Factor (Unitless) fy (MPa) f ys (MPa)
26587.21 32 1 420 420
Design Mom ent and Flexural Reinforcem ent for Mom ent, M u3
Design Design -Mom ent +Mom ent Minim um Required
-Mom ent +Mom ent Rebar Rebar Rebar Rebar
kN-m kN-m mm² mm² mm² mm²
Top (+2 Axis) -35.601 242 0 323 323
Bottom (-2 Axis) 17.8005 0 121 161 161
Section Properties
b (mm) h (mm) bf (mm) ds (mm) dct (mm) dcb (mm)
200 350 200 0 50 50
Material Properties
Ec (MPa) f'c (MPa) Lt.Wt Factor (Unitless) fy (MPa) fys (MPa)
26587.21 32 1 420 420
Pengecekan Kolom
Pengecekan kolom dilakukan menggunakan bantuan program PCAColumn. Gaya
aksial diperoleh dari hasil ETABS. Berikut adalah gaya aksial yang telah diurutkan
dari gaya yang terbesar.
TABLE: Column Forces
Story Column Unique Name Load Case/Combo Station P V2 V3 T M2 M3
m kN kN kN kN-m kN-m kN-m
Story1 C11 251 QX 2 0 254.2984 -0.9185 70.6322 -0.3194 183.3885 -2.0384
Story1 C11 251 QX 2 1.775 254.2984 -0.9185 70.6322 -0.3194 58.0163 -0.408
Story1 C11 251 QX 2 3.55 254.2984 -0.9185 70.6322 -0.3194 -67.3559 1.2224
Story1 C11 251 QX 4 0 254.2984 -0.9185 70.6322 -0.3194 183.3885 -2.0384
Story1 C11 251 QX 4 1.775 254.2984 -0.9185 70.6322 -0.3194 58.0163 -0.408
Story1 C14 266 Envelope Min 0 -2627.9805 0.5705 -1.2021 -0.001 -1.7136 0.6411
Story1 C27 331 Comb7 Min 0 -2627.9995 -1.6765 1.0193 -0.0007 1.301 -2.3314
Story1 C27 331 Envelope Min 0 -2627.9995 -1.6765 0.3702 -0.0014 0.379 -2.3314
Story1 C12 256 Comb7 Max 0 -2631.7547 1.7204 1.1214 0.0039 1.4974 2.3622
Story1 C12 256 Comb7 Min 0 -2631.8801 1.4944 1.0491 -0.0002 1.3336 1.8532
Story1 C12 256 Envelope Min 0 -2631.8801 0.5983 0.3812 -0.0012 0.3885 0.6788
P ( kN)
6000
(Pmax)
4000
2000
M (91°) (k N -m)
(Pmin)
-2000
500 My (k N -m)
300
100
Mx (k N -m)
-100
-300
-500
P = 254 k N
Penulangan Pelat Lantai
Data Perhitungan:
Lebar pelat (b) = 1000 mm
Tinggi pelat (h) = 150 mm
Tebal Selimut Beton (d’) = 20 mm (asumsi)
Tinggi Eefektif (d) = h – d’ = 150 – 20 = 130 mm
Diperoleh gaya momen maksimum dan minimum dari ETABS
M11 M22
(kN) (kN)
max 21.546 30.976
min -21.545 -30.65
1,4 1,4
ρmin = = =0,00333
fy 420
Mnx- ρ × fy
2= ρ × fy × (1 - 0,59 ×
f'c
)
b×d
38312500 ρ × 420
2= ρ × 420 × (1 - 0,59 ×
32
)
1000 × 130
ρ = 0,00564
Mny+ ρ × fy
2= ρ × fy × (1 - 0,59 ×
f'c
)
b×d
2632500 ρ × 420
2= ρ × 420 × (1 - 0,59 ×
32
)
1000 × 130
Didapat: ρ = 0,00372
::bdigunakan: ρ = 0,00372
As = ρ × b × d = 0,00372 × 1000 × 130 = 483.6 mm2
D10 = ¼ × π × d2 = ¼ × π × 102 = 78,539 mm2
Coba tulangan ø10
483.6
n= = 6.157 ≈ 7 buah D10 / meter
78,539
b 1000
Jarak antar tulangan (s) = = = 142.85 mm ≈ 120 mm
n 7
∷ karena jarak jadi 120mm maka tulangan menjadi : 8 buah ø10 / meter