Isolated Footing Design: Forces Details

This document summarizes the design of an isolated square footing. Key details include a total vertical load of 30 tons, moments of 5 ton-meters in both the major and minor axes, and a soil pressure limit of 25 tons/m^2. Reinforcement is designed to resist bending moments and shear stresses at critical sections. Checks are performed to ensure reinforcement requirements and capacity exceed calculated stresses due to loads and moments, resulting in a safe footing design.

Uploaded by

Jay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
62 views

Isolated Footing Design: Forces Details

This document summarizes the design of an isolated square footing. Key details include a total vertical load of 30 tons, moments of 5 ton-meters in both the major and minor axes, and a soil pressure limit of 25 tons/m^2. Reinforcement is designed to resist bending moments and shear stresses at critical sections. Checks are performed to ensure reinforcement requirements and capacity exceed calculated stresses due to loads and moments, resulting in a safe footing design.

Uploaded by

Jay
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

ISOLATED FOOTING DESIGN

FORCES DETAILS :
Axial Load = P1 = 25 T
Moment along Major axis = Mx = 5.00 T-m
Moment along Minor axis = Mz = 5 T-m

COLUMN DETAILS : G.L


Length = ( Larger Dimension of Column ) 0.47 m
Width = ( Smaller Dimension of Column ) 0.47 m

FOOTING DETAILS :
Length = L = 2 m
Width = B = 2 m 1.5
Depth = D = 0.5 m

Cover to Main R/f = 0.05 m


Diameter of R/f in Footing = 12 mm
0.5
SOIL DETAILS :
Density of Soil = g = 1.7 T/m
3

Depth of foundation below G.L = H = 2.0 m 2.00

MATERIAL CONSTANT :
Concrete Grade = M - 20 N/mm2
R/f Grade = Fe - 415 N/mm2 2.00
Load Factor = gf = 1.5 Z Z

DESIGN FORCES :
Axial load = P = 25.00 T
Self Weight of Footing = 5.00 T X
2.00

Total Vertical Load = 30.00 T

Moment along Major axis 5 T-m


Moment along Minor axis 5 T-m

PRESSURE CALCULATION :
SBC = 20 T/m2
FOR EARTHQUAKE CONDITION ALLOWABLE S.B.C = 1.25 x 20 = 25 T/m2

P + Mx + Mz
P=
A - Zx - Zz

\ Pmax = 7.50 + 3.75 + 3.75 = 15.00 T/m2 < S.B.C SAFE

\ Pmin = 7.50 - 3.75 - 3.75 = 0.00 T/m2 TENSION NOT CREATED


R/F CALCULATION FROM BENDING CONSIDERATION :

2000

765

2000 470

470
765

0.0
T/M2 15.0
T/M2

MOMENT AT CRITICAL SECTION ALONG WIDTH :

M = Pmax x 0.765 x 0.765 / 2


M= 4.39 T-m
Mu = 65.84 KN-m
2
Ast = 413.30 mm ( To be distributed in 2 m Length )
2
Min Req = 600 mm ( Ast = 0.12 x b x D )

Required Spacing of Bar = 12 # @ 185 C/C ALONG WIDTH

PROVIDE 12 # @ 150 C/C ALONG WIDTH

\ Ast = 753.98 mm2


MOMENT AT CRITICAL SECTION ALONG LENGTH :

M = Pmax x 0.765 x 0.765 / 2


M= 4.39 T-m
Mu = 65.84 KN-m
2
Ast = 413.30 mm ( To be distributed in 2 m Length )
2
Min Req = 600 mm ( Ast = 0.12 x b x D )

PROVIDE 12 # @ 185 C/C ALONG LENGTH

\ Ast = 611.34 mm2

CHECK FOR ONE WAY SHEAR ALONG LENGTH :

Critical Section is at diatance of ' d ' from face of column

0.765

2.00 0.765 0.315

2.00

\ Shear force at critical section = 15.00 x 0.315

V = 4.73 T

\ Actual Shear stress tv =


Vu
bxd

1.5 x 4.73
= x 10000
1000 x 450

= 0.158 N / mm2

Pt = 100 x As = 100 x 611.34 = 0.14 Pt tc


b x d 1000 x 450 0.15 0.28
0.2 0.33
\ tc = 0.28 N / mm2

< tv
HENCE SAFE
CHECK FOR ONE WAY SHEAR ALONG WIDTH :

Critical Section is at diatance of ' d ' from face of column

0.765

2.00 0.765

0.315
2.00

\ Shear force at critical section = 15.00 x 0.315

V = 4.73 T

Vu
\ Actual Shear stress tv = bxd

1.5 x 4.73
= x 10000
1000 x 450

= 0.158 N / mm2

100 x As 100 x 753.98


Pt = = = 0.17
b x d 1000 x 450

\ tc = 0.28 N / mm2

< tv

HENCE SAFE
CHECK FOR TWO WAY SHEAR :

Critical Section is at distance of 'd/2' from face of column

2.00

0.92

2.00 0.92 d/2

d/2

\ Shear force at Critical Section = 15.00 x Area of Shadeded Portion

= 15.00 x 3.1536

= 47.30 T

Critical Perimeter = 2 x 0.92 + 2 x 0.92

= 3.68 m

Vu
\ Actual Shear stress tv = bxd

1.5 x 47.30
= x 10000
3680.00 x 450

= 0.428 N / mm2

Allowable Shear stress = ks.tc ( CLAUSE 31.3.3 IS 456 : 2000 )

where,
ks = ( 0.5+b )

Short Side of Column = 0.47


b= Long Side of Column = 0.47
= 1.00

ks = 1.50 but not greater than 1.0


Where,
tc = 0.25  fck
tc = 0.25  M - 20 = 1.12 N/mm2

Allowable Shear stress = ks.tc = 1.12 N/mm2 SAFE

CHECK FOR OVERTURNING :


ALONG LENGTH :

Rm Restoring Moment = 25.00 x 1.00

Rm = 25.00 T.m

Applied Moment = 5.0 T.m

Restoring Moment
F.O.S. =
Applied Moment

P 25.00
= = 5.00
5

> 2.2

SAFE
1.00