PRODUCTION & OPERATION MANAGEMENT
/q
Time Allotted : 3 Hours Full Marks : 70
GROUP – A
( Multiple Choice Type Questions )
er.
inventory level.
a) decreases
b) increases
c) does not change
ut .
carrying cost ?
a) Capital cost b) Insurance cost
c) Obsolescence cost d) Transportation cost.
vii) In a situation of rising prices, the LIFO method of stock
ut .
25001 (MBA) 2
CS/MBA/SEM-2(FT)/MB-204/2013
d) none of these.
pap
x) Fishbone diagrams
quality problems
d) none of these.
ut .
5 7 3 2 6 4 5 3 2 3
defects
Calculate the following for constructing a control chart for
number of defects :
(a) Central line, (b) Upper Control Limit (UCL), (c) Lower
ut .
25001 (MBA) 4
CS/MBA/SEM-2(FT)/MB-204/2013
A 9 2
/q
B 5 4
C 8 10
D 3 5
pap
E 4 6
F 1 11
G 7 6
er.
GROUP – C
( Long Answer Type Questions )
Answer any three of the following. 3 × 15 = 45
7. a) What are the various costs associated with inventory
wb
management ?
b) Explain why ordering costs decrease with increase in
inventory.
c) A factory uses annually 24,000 units of raw material,
ut .
which cost Rs. 1·25 per unit. Placing each order costs
Rs. 25 and carrying cost is 6% per year of the average
inventory.
a c.
Wc-1 Wc-2
Jobs
(Sheet metal centre) (Paint centre)
er.
A 4 5
B 17 7
wb
C 14 12
D 9 2
ut .
E 11 6
6+9
9. a) Explain Range Chart and its application in Quality
a c.
Control function.
25001 (MBA) 6
CS/MBA/SEM-2(FT)/MB-204/2013
Re. 0·02 per unit per day, what will be the revised
EOQ ? (Assume : 300 days in a year.)
3+3+(2+3+2+2)
Most
Optimistic Pessimistic
Predecessor Likely
p:/
Activity Duration Duration
Activity Duration
(weeks) (weeks)
(weeks)
A None 2 4 6
B None 2 3 10
/q
C B 4 7 10
D A 4 5 12
E B 2 7 12
pap
F C, D 3 4 5
G C, D 6 8 10
H E, F 6 7 14
I G, H 2 3 16
i) Draw the network of the above project.
ii) What is the expected project completion time ?
er.
c) Critical path
d) Vendor Rating
e) Value Analysis.