4 Presentation Hacksma Continuous Gas Circulation
4 Presentation Hacksma Continuous Gas Circulation
Compressor
Same FTP
Before Loading
Same FBHP
Liquid Column
During Loading
Denver, Colorado
2008 Gas Well Deliquification Workshop
Re-Creates “Before” Condition
& Returns CP To Low Levels
CGC LOWERS THE CP (not increase)
CRITICAL RATE
INCREASE DUE
TO LOADING
INCREASE DUE
TO FRICTION
CRITICAL RATE
THE LOWEST FBHP;
•CONTINUOUSLY
•DOWN TO “0” RATE
LOADING
FRICTION
1 0 0 0 - -
2 0 0 0 - -
3 30 30 0 5 5
DID NOT WORK – COULD NOT CIRCULATE
BHP TOO LOW (<100#) FOR CGC??
OTHER METHODS NOT WORKING EITHER
2008 Gas Well Deliquification Workshop 20
Feb. 25 - 27, 2008
Denver, Colorado
NW LOUISIANA (single well)
• Before
– Well SI Due To Liquid Loading
– LP = 1000 psi
– 2-Stage Compressor – Could Pull FTP Below 75#
• After
– Existing Compressor Converted To 1-Stage Low Cost
– Configured To Both Circulate & Reduce FTP
– FTP = 400# & CP = 575#
– Circulate 300 MCFD
MORAL: High Velocity More
– Sell 250 MCFD - 250 GAIN Important Than Low FTP
– 550 MCFD Up Tubing
2008 Gas Well Deliquification Workshop 21
Feb. 25 - 27, 2008
Denver, Colorado
VARIATION #1 – CGC + REDUCE FTP
Separator Compressor Sales
Motor Choke
Controls & Metering Valve
THANK YOU