100% found this document useful (1 vote)
217 views

GE GT OPS - Simulation Based

5 days Simulation Base Expert Training

Uploaded by

luriah
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
217 views

GE GT OPS - Simulation Based

5 days Simulation Base Expert Training

Uploaded by

luriah
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

GE Gas Turbine Operations

Simulation Based
24 - 28 September 2012, Kuala Lumpur

Expert Course Faculty


G.Prasanna Kumar

Organised By In Collaboration
With
powerEDGE®
GE Gas Turbine Operations – Simulation Based
24 - 28 September 2012, Kuala Lumpur

Course Overview
This 5 day simulation based training course covers the operations of a GE Gas Turbine. The course will introduce the
student to the major components of a GE Gas Turbine and its associated systems. The use of a Gas Turbine simulator
will allow students to view various operational problems and introduce the concepts of troubleshooting and fault
finding.

This course provides participants with practical hands-on training in operating gas turbine power plants under normal
and abnormal conditions. Participants learn safe and efficient plant operation methods, plant startup, normal
operation, plant shutdown, and dealing with typical problems that occur in gas turbine power plants. The training is
conducted using advanced real-time simulators that simulate typical plant problems in a realistic environment for the
participants to understand, analyse, troubleshoot and respond to the problems. Participants are required to deal with
associated alarms, analyse and discuss the cause and the effects of the problem scenario and to take corrective
actions to restore the plant to normal conditions.

Simulation-based training is one of the most effective methods of training the operations personnel of industrial
plants. Simulators allow plant personnel to observe the consequences of their actions without any direct impact on
actual plant operations. Through simulation-based exercises, trainees can learn how to respond to emergencies and
how individual actions and decisions affect entire processes in an environment that mirrors situations they would
normally encounter in a plant or facility.

The course will use a MK VI Speedtronic Simulator but other Speedtronic systems will be referenced during the
course including MK II, MK IV and MK V Speedtronic Control Systems

Your key learning outcomes from attending this 5 day training course:
 Get familiar with the types of GE Gas Turbines and their applications.
 Understand and read Gas Turbine schematics and identify instrumentation devices/uses.
 Acquire knowledge of the various GE Gas Turbine Systems and explain operating requirements for Lube Oil,
Hydraulic Oil and Fuel Systems.
 Be able to explain startup, synchronising and loading procedures
 Learn the benefit of capturing turbine data and using this data as regards performance evaluation.
 Appreciate the principles of emissions control and the various methods of achieving this
- Identify the main causes of turbine trips including vibration, overtemperature, combustion profiling
Who Should Attend
This is an excellent course for plant operators/technicians responsible for the day-to-day operations of a Gas Turbine. The
course will also benefit maintenance personnel who are involved in the troubleshooting of operational problems. Shift
supervisors and Team Leaders will also find the course beneficial
.
Other Unique Features with powerEDGE Training

 Pre-Course Questionnaire to help us focus on your learning objectives


 Detailed Course & Reference Manual for Continuous Learning and Sharing
 Practical Exercises & Case Examples to better understand the principles
 Limited class size to ensure One-to-One Interactivity
 Assessment at the end of the course to help you develop a Personal Action Plan
GE Gas Turbine Operations – Simulation Based
24 - 28 September 2012, Kuala Lumpur

Course Outline

DAY 1 Day 3
 Introduction to Gas Turbines
 Gas Turbine Terminology (Power Output,  Gas Turbine Operations (MK VI Speedtornic
Heat Rate, Efficiency) Simulation based)
 Basic Thermodynamics  Pre-start checks
 GE Range of Gas Turbines  Startup Sequences and Requirements
 Synchronising Checks
 GE Turbine Types and Applications  Loading Operations (Simple Cycle,
 Heavy Duty, Aeroderivative Combined Cycle)
 Generator Drive, Compressor Drive
 Simple Cycle, Combined Cycle  Operating Screens and parameters (MK VI
Speedtronic Simulation based)
 Components of a GE Gas Turbine  Turbine Temperatures (Exhaust,
 Major Components of a Gas Turbine Wheelspace)
o Compressor, Combustor, Turbine  Vibration Measurement and Parameters
 Accessory Components of a Gas Turbine  Generator Temperatures
o Load Gearbox, Accessory Gear
Box, Generator, Compressor Day 4

DAY 2  GE Gas Turbine Control Systems


 TMR Systems
 Control Philosophy
 Gas Turbine Systems (Frame 5,6 and 9)  Speedtronic Control
 Lube Oil System  Gas Turbine Control (MK VI Speedtronic
 Hydraulic Oil System Simulation Based)
 Fuel Systems (Gas, Liquid)  Startup Control
o DLN/DLE and WLN systems and  Acceleration Control
components  Speed Control (Droop and Isochronous)
 Starting Systems (Diesel Engine, Electric  Temperature Control (Load Limiting)
Motor, Static Starter)  Gas Turbine Protection (MK VI Speedtronic
 Cooling Systems (Water and Air) Simulation Based)
 Inlet Air Systems and Filtration  Turbine Overspeed
 Overtemperature
 Vibration
 Combustion Monitoring (Spread)
Day 5

 Alarm Systems
 Alarms and Trips
 Alarm Help Systems
 Process and Diagnostic Alarms
 Special Operations and Systems
 Compressor Washing
 Anti-icing Systems
 Overspeed testing
 Basic Fault Finding
 Ladder Logic
 Common problems and solutions
 Course Review Quiz
Course Assessment and Review
GE Gas Turbine Operations – Simulation Based
24 - 28 September 2012, Kuala Lumpur

Your Expert Faculty: G. Prasanna Kumar


Prasanna has over 26 years of service in the field of Speedtronic Control systems Viz. Mark-IV, Mark-V and
Mark-VI (little). Installation, Commissioning, Inspections & Overhauls, and trouble-shooting activities of GE
design Gas turbines ranging from Fr-1 thru Fr-9EA and the control system tuning and maintenance.

He had obtained training at GE, USA on Mark-IV & Mark-V controls and commissioning of gas turbines.
Specialist in providing both On-site & Off-site training in Gas Turbine Operation, Gas Turbine Mechanical
Maintenance and Control systems (Mark-IV & Mark-V) to Operators, Technicians, Engineers and Managers

His professional experience includes


 13 years of service with BHEL (Manufacturing associate of GE, USA for Gas turbines) in Erection
Department

 Off-site training in Gas Turbine Operation & Maintenance and Control system Maintenance for
various customers in Middle East & Gulf for ADNOC, DUBAL, DEWA, EMAL, DUSUP, GASCO, MJBI,
RAK Cements, ZADCO, KHAFZI, PDO / OMIFCO– OMAN, QATAR Petroleum-Doha and customers
from Myanmar, Egypt and Iran

 On-site training in Gas Turbine Operation, mechanical Maintenance and Control system
Maintenance for GECAD/ Ghana-Africa, Shotton Power Plant/ Westchester-UK, Mellitah gas plant-
Libya, Yemen Hunt Oil Company–Yemen, Saudi Electricity Company SECO at their plants in Riyadh
PP-9 & PP-10, Tihama, Gezan, Wadi Ad-Dawasir plants in Saudi Arabia and Qatar Petroleum in
Qatar.

This 5 day Gas Turbine Operation - Simulation Based training course is collaboration with Osborne Training Services

Osborne Training Services has been facilitating successful Power Engineering training programmes for over
ten years and remains fully committed to delivering quality training, using highly qualified tutors with
extensive experience in the field in which they teach. OTS is part of Osborne Engineering Ltd (OEL), founded
in 1984, specialising in the manufacture and repair of all types of white metal components. OEL’s attention to
detail and manufacturing excellence ensures exceptional quality and accuracy.

The OEL group has facilities in UK, Poland, & UAE. OEL operates across five continents, working with Original Equipment
Manufacturers (OEMs), Service Companies and End Users, in the Oil, Gas, Petrochemical and Power Generation industries.

GAS TURBINE MAINTENANCE – AVAILABLE AS ON-SITE TRAINING

Click to view programme outline

 MK VI SPEEDTRONIC CONTROL SYSTEM MAINTENANCE


 MK V SPEEDTRONIC CONTROL SYSTEM MAINTENANCE
GE Gas Turbine Operations – Simulation Based
24 - 28 September 2012, Kuala Lumpur

REGISTRATION FORM 4 ways to Register


Early Bird
Ends 30 Aug 2012
Normal Savings  Online:
www.poweredgeasia.com
 Email:
[email protected]
5 Day  Phone: (65) 6741 9927
SGD $3799 SGD $3999 SGD $200
Programme  Fax: (65) 67478737

ATTENDEE DETAILS You may also be interested in

Name .................................................................................................. Job title ................................................................................................


Tel ....................................................................................................... Email ...................................................................................................  Introduction To Clean
Coal Technology

Name .................................................................................................. Job title ................................................................................................  Introduction to Power


Systems
Tel ....................................................................................................... Email ....................................................................................................
.  LNG Fundamentals

Name .................................................................................................. Job title ................................................................................................


 Fundamentals of Power
Tel ....................................................................................................... Email .................................................................................................... Generation

Name .................................................................................................. Job title ................................................................................................ BRING YOUR TEAM!!

Tel ....................................................................................................... Email .................................................................................................... Send 4 team mates and the


5th attends for free

Name .................................................................................................. Job title ................................................................................................


Tel ....................................................................................................... Email ....................................................................................................

COMPANY DETAILS

Organisation name ...............................................................................Industry ................................................................................................


Address ............................................................................................................................................................................................................... In House Solution
Postcode ............................................................................................... Country ...............................................................................................
Tel ..........................................................................................................Fax .......................................................................................................
Save Up to 20%
PAYMENT METHODS When you bring this
By Cheque/ Bank Draft: Make Payable to Asia Edge Pte. Ltd.
By Direct Transfer: Please quote AE1 with the remittance advise training to your site.
Account Name: Asia Edge Pte. Ltd. To find out more call
Bank Number: 508 Account Number: 762903-001Swift Code: OCBCSGSG 65791288
All bank charges to be borne by payer. Please ensure that Asia Edge Pte Ltd receive the full invoiced amount.

PAYMENT POLICY
Payment is due in full at the time of registration. Full payment is mandatory for event attendance. I agree to Asia Edge Pte Ltd. payment terms

CANCELLATIONS & SUBSTITUTIONS


You may substitute delegates at any time. ASIA EDGE PTE LTD does not provide refunds for cancellations. For cancellations received in writing more than seven (7) days prior to the training course you will receive a 100% credit to be used
at another ASIA EDGE PTE LTD training course for up to one year from the date of issuance. For cancellations received seven (7) days or less prior to an event (including day 7), no credits will be issued. In the event that ASIA EDGE PTE LTD
cancels an event, delegate payments at the date of cancellation will be credited to a future ASIA EDGE PTE LTD event. This credit will be available for up to one year from the date of issuance. In the event that ASIA EDGE PTE LTD
postpones an event,
delegate payments at the postponement date will be credited towards the rescheduled date. If the delegate is unable to attend the rescheduled event, the delegate will receive a 100% credit

You might also like