0% found this document useful (0 votes)
63 views1 page

Production Schedule

This production schedule outlines the timeline and key tasks for a short film project over several weeks in March through May. It includes dates for research on genre, content, and actors, completion of pre-production work, filming during two separate weeks in April and May, and editing with the goal of a final evaluation the week of May 20th through 24th. The schedule also notes when work will be evaluated by teachers, through written or survey feedback, and when context pages and infographics are due.

Uploaded by

api-433604806
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views1 page

Production Schedule

This production schedule outlines the timeline and key tasks for a short film project over several weeks in March through May. It includes dates for research on genre, content, and actors, completion of pre-production work, filming during two separate weeks in April and May, and editing with the goal of a final evaluation the week of May 20th through 24th. The schedule also notes when work will be evaluated by teachers, through written or survey feedback, and when context pages and infographics are due.

Uploaded by

api-433604806
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Production Schedule

Please include location, time of film, what you are filming and team
members including actors

Date Plan of action Evaluation / behind


Week beginning the scenes
19th march Rational, project concept and evaluation
20th march Think of short film ideas Feedback from
survey
21st march Context page deadline
22nd march Start research
25th -29th march Research genre, content and artist Marked by
(primary and secondary) teachers
1st -5th April Research audience, platform and actors. Marked by
Write up infographics teachers and
written evaluation.
Easter holiday Ensure all research is completed. Start pre- Weekly blogs
production work.
23rd -26th April Planning, complete pre-production work. Feedback from
teachers
29th April- 3rd Filming
May
6th -10th May Filming and start editing Feedback from
teachers
13th -17th may Editing and filming re-shoots
20th 24th may Final evaluation Feedback from
surveys and
teachers. Written
analysis. Compare
to other work.