DPR Template

The document provides a status report on manpower, tools, and quality reports for a construction project. It shows that manpower is currently at 0 for all positions. No major tools or equipment such as JCBs, welders, or boom lifts are available. Several quality reports have been submitted but some are still pending approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
391 views5 pages

DPR Template

The document provides a status report on manpower, tools, and quality reports for a construction project. It shows that manpower is currently at 0 for all positions. No major tools or equipment such as JCBs, welders, or boom lifts are available. Several quality reports have been submitted but some are still pending approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Manpower Status Tools & Tackles

C u t n g m ac h in e s;
H igh S p e e d d rill
W e ld in g M / C ; 0

cab le jac ks ; 0
B o o m lif ; 0

G rin d e rs; 0
B re ake r ; 0
JCB; 0

m ac h in e ; 0
0 0 0 0 0 0 0 0

0
MEP Drawing status
Quality Report OEM Status Total Submitted Approved
12
Deviatons / quality defects 0 12 MEP Submittal statu
10
10
8
NCR / Memo issued 0 8
6
6

Test reports / Inspecton reports 0 4


4
2
2
0
0

Column F Column G Column F Column G Column F Column G C


120% 120% 120% 120%

100% 100% 100% 100%

80% 80% 80% 80%

60% 60% 60% 60%

40% 40% 40%


40%
20% 20%
20% 20%
0% 0%
0% 0%
60% 60% 60% 60%

40% 40% 40%


40%
20% 20%
20% 20%
0% 0%
0% 0%

Column F Column G Column F Column G Column C Column D


120% Column H 120% 12
100% 100% 10
80% 80% 8
60% 60% 6
40% 4
40%
20% 2
20%
0% 0
0%
JCB; 0

B re ake r ; 0
Tools & Tackles

W e ld in g M / C ; 0

B o o m lif ; 0

H igh S p e e d d rill
m ac h in e ; 0

C u t n g m ac h in e s;
0

10
12

0
2
4
6
8

20%
40%
60%
80%
100%
120%

0%
G rin d e rs; 0

cab le jac ks ; 0
MEP Submittal status

C ab le p u llars; 0
Total

Column F
Submitted

M e g gar ; 0
Approved

Ear t h te ste r; 0
Column G

P re ssu re te stn g
m ac h in e s ; 0
60%
40%
20%
0%

Project

Doc Title

Report No

Duraton

Prepared by

Reviewd by
Project: DPR No: 01
LOI Date: Completon Date:
Weather: Sunny / Cloudy / Rainy / Heavy Rain/ with few spells of rains Count Down (In Days) -43557
Work date: Report Date No. of Days Elapsed

Manpower Status
Planned Actual Short fall / Manpower Status
Category(Nos) strength deployed Surplus Plann next day Remarks

Project Manager
0
Site Engineer 0
Safety Officer 0
Supervisor 0
Mason 0
Male coolies 0
storekeeper 0
Driver 0
Helper 0
welder 0
Plumber 0
Electrician 0
Total 0

Tools & Tackles Tools & Tackles


Sr.No Category Planned Actual Short fall / Plann next day Remark
deployed Surplus
1 JCB 0
2 Breaker 0
3 Welding M/C 0
4 Boom lif 0
5 High Speed drill machine 0
6 Cutting machines 0
7 Grinders 0

Cut ng m a chine s ;
8 cable jacks 0

H ig h S pe e d drill
W e lding M /C; 0

Ca ble pulla rs ; 0

Pre ss ure te st ng
ca ble ja cks ; 0

Ea rth te ste r; 0
B oom lif ; 0
B rea ke r ; 0

G rinde rs; 0

M eg ga r ; 0
JCB ; 0

m a chine s ; 0
9 Cable pullars 0

m a chine ; 0
10 Meggar 0
11 Earth tester 0
Pressure testing

0
12 machines 0

Quality Report
Quality Report Deviatons / quality defects 0
Till Remarks
Descripton previous day Today Till date cum. NCR Status
NCR / Memo issued 0
Closed Open
Deviations / quality defects 0
NCR / Memo issued 0 Test reports / Inspecton reports 0
Test reports / Inspection reports 0

(A). Status of OEM

Date Factory Handing Date Testng & Date of Remark /reason


S.No OEM Descripton Commssioni Delivery at site
of PO testng over Dates of PDI for short fall
ng
1 Pumps (For HVAC and Fire Fighting)
2 Air handling units
3 Ventilation fans
4 VRV Indoor / Outdoor units
5 UPS System
6 Compressors

(B). Status of approval of Drawings & Submittals MEP Drawing status


Sr No MEP Drawing status Total Submitted % Submitted Approved % Approved Total Submitted Approved
1 ELECTRICAL #DIV/0! #DIV/0! 12
2 FIRE FIGHTING #DIV/0! #DIV/0!
3 UTILITY #DIV/0! #DIV/0! 10
4 PLUMBING #DIV/0! #DIV/0! 8
5 HVAC #DIV/0! #DIV/0!
Sr No MEP Submittal status Total Submitted % Submitted Approved % Approved 6
1 ELECTRICAL #DIV/0! #DIV/0!
4
2 FIRE FIGHTING #DIV/0! #DIV/0!
3 UTILITY #DIV/0! #DIV/0! 2
4 PLUMBING #DIV/0! #DIV/0!
Total Submitted Approved
MEP Submittal status

0
5 HVAC #DIV/0! #DIV/0!

Floor Project Unit Estmated Executed Qty weightage % Done Icons


Qty Bars Remark

Ground Floor 97%


HVAC 100% 100% 100%
Supports Nos 15% 20% 20%
Duct 20% 8% 8%
Insulation 10% 9% 9%
AHU 20% 5% 5%
pipes 15% 5% 5%
valves 10% 5% 5%
Air Terminals 10% 10% 10%
Fire Fighting 100% 81% 81%
Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
Exhaust system 100% 100% 100%
Mezzanine Floor HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
Exhaust system 100% 100% 100%
HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
First Floor Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
Second Floor Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
Third Floor Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
Fourth Floor Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%
HVAC 100% 100% 100%
Fire Fighting 100% 100% 100%
Fifh Floor Plumbing 100% 100% 100%
Utility 100% 100% 100%
Electrical 100% 100% 100%