Contoh Laporan Aspal
Contoh Laporan Aspal
PROJECT :
PEMBUATAN TAXIWAY DENGAN FLEXIBLE PAVEMENT
BANDAR UDARA TAMPA PADANG MAMUJU
CONTRACTOR : PT. HUTAMA SURYA PERSADA
LABORATORIUM JALAN DAN ASPAL
PROGRAM STUDI TEKNIK KONSTRUKSI SIPIL
POLITEKNIK NEGERI UJUNG PANDANG
I Perbandingan Campuran
1 ABU BATU 36%
2 BP. 0.5-1 27%
3 PB. 1 - 2 15%
4 PC 2%
BERAT
KADAR ASPAL ISI VIM VMA VFB STABILITAS FLOW
2.400
5
2.390 4
4
2.380
3
2.370 3
2.360 2
2
2.350
1
2.340 1
2.330 0
4.00 4.50 5.00 5.50 6.00 6.50 7.00
KADAR ASPAL
85.0
VFB
80.0
75.0
70.0
65.0
60.0
55.0
85.0
VFB
FL
80.0
75.0
70.0
65.0
60.0
55.0
50.0
4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50
KADAR ASPAL
MARSHALL QUO
KADAR ASPAL Vs VMA
12.00
VMA
11.50
11.00
10.50
10.00
4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50
KADAR ASPAL
R ASPAL
KOEFISIEN
MARSHALL KET KARAKTERISTIK PERSENT
(KN/mm) VIM
9.56 VFB
9.23 STABILITAS
8.84 FLOW
8.12 4.50
7.47
Asphalt optimum : 5.1 terhadap berat ke
atau 4,85 % terhadap
2.50
2.00
1.50
2.50
FL
2.00
1.50
1.00
4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50
STABILITAS
210
KADAR ASPAL
200
190
KADAR ASPAL Vs MQ
MARSHALL QUO
11.00 180
10.00
170
9.00
160
8.00
7.00
6.00
4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50
KADAR ASPAL
PERSENTASE SESUAI SPESIFIKASI SPECS KET
3-5%
min.65
min. 1800
2 - 3 mm
5.00 5.50 6.00 6.50
2100.00
2000.00
1900.00
1800.00
1700.00
1600.00
4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50
KADAR ASPAL
ANALISA KARAKTERIASTIK DAN HASIL UJI TEKAN
RENDAMAN 45 MENIT SUHU 60 Oc
Project : PEMBUATAN TAXIWAY DENGAN FLEXIBLE PAVEMENT
BANDAR UDARA TAMPA PADANG MAMUJU
Contractor: PT. HUTAMA SURYA PERSADA
Job Mix : JMD ASPHALT CONCRETE (AC)
NOMOR TEBAL KADAR ASPAL TERHADAP BERAT BENDA UJI ISI BERAT CAMPURAN
BENDA BENDA BERAT BERAT CAMP KERING DALAM AIR SSD BENDA UJI PADAT MAKSIMUM
UJI UJI AGREGAT (BULK) TEORITIS
a b c d=100/(100+c)*c e f g h=g-f i = e/h j=100/{(100-d)/t
(mm) (%) (%) (gram) (gram) (gram) + d/u}
2.358 4.471 10.714 58.274 450.00 1899.00 1659.22 1.90 2.95 8.73
2.352 4.693 10.922 57.031 520.00 2194.40 1924.39 1.85 2.95 10.40
2.367 3.481 10.802 67.773 420.00 1772.40 1604.94 2.00 3.46 8.02
2.367 3.476 10.797 67.808 580.00 2447.60 2068.59 1.98 3.46 10.45
2.379 2.370 10.777 78.007 445.00 1877.90 1553.96 2.30 3.97 6.76
2.373 2.585 10.973 76.446 600.00 2532.00 2246.25 2.00 3.97 11.23
2.389 0.694 11.217 93.810 400.00 1688.00 1611.26 2.60 4.98 6.20
2.383 0.975 11.468 91.501 580.00 2447.60 2122.91 2.40 4.98 8.85
Sampel a b c d=(b+c)/2
ABU BATU 36% 2.522 2.778 2.650
GRADASI
SPESIFIKAS
NO.SARINGAN ABU BATU BP. 0.5-1 PB. 1 - 2 BP.2-3 PC GABUNGAN
I AC
36.0% 27.0% 15.0% 20.0% 2.0% 100.0%
2" 100.00 100.00 100.00 100.00 100.00 100.00 100
1 1/2" 100.00 100.00 100.00 100.00 100.00 100.00 100
25 (1") 100.00 100.00 100.00 50.59 100.00 90.12 90-100
19 (3/4") 100.00 100.00 96.18 8.72 100.00 81.17 76 - 90
12,7 (1/2") 100.00 93.57 52.85 0.48 100.00 71.29 60 - 78
9,5 (3/8") 100.00 86.26 28.69 0.11 100.00 65.62 52 - 71
No.4 95.64 20.43 3.74 - 100.00 42.51 35 - 54
No.8 82.78 1.82 0.30 - 100.00 32.34 23 - 41
No.16 61.72 0.66 - - 100.00 24.40 13 - 30
No.30 46.62 0.49 - - 100.00 18.92 10 - 22
No.50 26.36 0.28 - - 100.00 11.57 6 - 15
No.100 14.40 0.08 - - 100.00 7.20 4 - 10
No.200 9.30 0.02 - - 100.00 5.35 3-7
% CA = 67.66 %
No.4
No.8
No.16
No.30
No.50
No.100
No.200
19 (3/4")
25 (1")
12,7 (1/2")
9,5 (3/8")
% FA = 26.98 %
% FILLER = 5.35 %
I II III IV V
BATAS BAWAH
NOMOR SAMPEL BATAS ATAS
No.8
No.16
No.30
No.50
No.100
No.200
19 (3/4")
12,7 (1/2")
9,5 (3/8")
25 (1")
G ABUNG AN AG REG AT
BATAS BAWAH
BATAS ATAS
G aris Baw ah Daerah L arang an
G aris Atas Daerah L aran g an
90.00
100 100
80.00 100 100
90 100
70.00 76 90
60.00 60 78
52 71
50.00 35 54
23 41
40.00 13 30
10 22
30.00
6 15
20.00 4 10
3 7
10.00
-
No.30
No.50
No.100
No.200
EG AT
ah L arang an
L aran g an
-
No.30
No.50
No.100
EG AT
No.200
ah L arang an
L aran g an