22-JUL-2083 14:58 FROM + 652 2513 1872 TO 28459295 P6585,
DAVID S. K. AU & ASSOCIATES LTD.
China United Centre, 26th Floor, 28 Marble Road, North Point, HONG KONG
Tel : (852) 2560 8811 Fax : (852) 2513 1828Email : [email protected] hk
FAX TRANSMISSION
To : Hip Hing Construction Co. Lid From TK Yu
Attn, : Mr. Kam W Mak Tel.No. : 25608811
Tel. No. : 25259251 OurRef. : DA00028/ 124
FaxNo. 28459295 Date: 22" July 2003
$0006/H200308- No, of i
YourRef. : ToseWMKOL pages” 1 including this one)
Should you not receive all the pages, please contact me at your earliest convenience.
statement of plate lond test
Further to your letter and the enclosed method of statement dated 19” July 2003, we have the
following comments on your submitted method of statement:
S
3
&
2
é
&
&
2
ty
‘A sketch showing the arrangement of the equipment should be submitted.
Maximum test load on each position should be stated.
Please clarify in using the test load pressure of 600 kPa.
Please revise your method of statement in according to the site formation drawing no.
1DA00028/1/NA/001 (revision C).
aepe
‘Should you have any queries, please contact the undersigned @ 25608811
Regards,
Yu
ec. Chi Lin Nunnery - Ms. Daisy Sin
22L20071450° 7" " TOMPHINGCONSTGRUUP™ “fBqesz2sist072 ee aeBL IB el
Hip Hing Construction Co, Ltd.
Member of NWS Holdings
mT
Our Ref $0015/11200308-003/K WM/KOL ANN
it 2003Y139614
24 July 2003
David S.K. Au & Associates Ltd.
26/F., China United Centre,
28 Marble Road,
North Point,
Hong Kong.
Aitn.: Mr. Patrick P.C. Chu
Dear Sir,
‘Hammer Hill Road Park, Diamond Hill
Revised Method Statement of Plate Load Test
Further to the comments stated on your fax ref. no.: DA00028/1139 dated 22" July 2003
from Mr. TK. Yu, we submit herewith the captioned revised method statement for your review
and approval
Ifyou have any question, please do not hesitate to contact the undersigned
‘Thank you for your kind attention.
Yours faithfully,
HIP HING CONSTRUCTION CO. LTD.
, Project Manager)
Encl.
ce ChiLinNunnery = Ms. Daisy Sin }w/o
L&B }wio
KWM/KOLIkh
SAYREEAUPTASTASA IR AWS TOU LY (852) 2525 9251 MHA (852) 2045 9209
20IF, New World Tower, 16-18 Queen's Road Central, Hong Kong Tel (852) 2525 9251 Fax (852) 2845 9295
"Web Site: lip: /hwiw hiphing.com hk Emai: [email protected] hk.FUGRO TECHNICAL SERVICES LIMITED
———e
Mitefns Dison, Ta :vase2eoeos3 eae
Hg Dacooren cen, Baeza MateriaLab
Le TES ace peak eae, mal abla com
Tai Lam, Tuen Mun, NT, Hong Kong
Method Statement for Plate Load Test
Client : Hip Hing Construction Co., Ltd.
Project : Hammer Hill Road Park, Kowloon (H200308)
Maximum Load : 600 kPa
No. of Tests : As advised by ClienvEngineer.
Location of Tests : As advised by Client/Engineer
Eguipment :
Rigid circular steel plate of size 300mm dia.
A jack of suitable capacity
Calibrated load cel/proving ring.
4 Dial gauges readable to 0.01mm and complying with AS2103 : 1978
Suitable kentledge system
Deen
Plate load test procedure
1. Level and prepare the area to be covered by the test plate. Remove
any extraneous materials, Bed the plate on 10mm (approx) layer of
standard sand, ensuring the plate is level.
2. Setup the kentledge system, hydraulic jack system and the loading
device. The height measured from the test location to the underside of
the kentledge system should be approximately 1m high. (Ensure the
kentledge system is steady and not prone to movement).
3. Setup the reference beam, ensuring the beam is stable. Attach the dial
gauges to the beam ensuring they are situated mutually at right angles
to one another and at an equal distance from the centre of the test
plate. (If required, the level of the reference beam should be recorded
by the Client).
4. Start the 1" cycle of loading. Increase the load pressure beneath the
plate to 200kPa slowly and evenly in increments of 100kPa. Maintain
each increment until the rate of settlement of the plate is equal to or
less than 0.01mm in 1 minute. Record the settlement at the end of
each increment.
5. After step 4, unload the pressure on the plate in increments of 100kPa
to zero. Record the rebound unt it is equal to of less than 0.01 mm in
41 minute.
6. The level of the plate after unloading is measured and adopted as the
base datum for the main-load cycle.