0% found this document useful (0 votes)
128 views

Concept Note - PRM

Uploaded by

Naveed Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
128 views

Concept Note - PRM

Uploaded by

Naveed Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

CONCEPT NOTE

Name of the Organization: AL-NOOR FOUNDATION ®


Zafar Saleem Bangash
Contact Information and
+92-333-5254688
Address:
[email protected]
House No. 19, St. 44 F-6/1 Islamabad, Pakistan
Project Location: Islamabad and Rawalpindi, Pakistan
Duration of Project: 12 Month
$42,854.00
Community Contribution:
$823,726.00
Requested Fund for Grant:
Problem Statement:
Despite economic hardships and challenges in Pakistan, many Afghans are unwilling
to return in the near future and due to cite security concerns and the lack of housing and jobs
in Afghanistan. Surveys of Afghan refugees in Pakistan, conducted in past articulate that they
are in dire need to solve their current livelihoods and socio-economic status, education,
existing skills and vocational trainings needs, and their protection issues.
Beneficiaries
About of 700 children of Afghan refugees will directly benefit from the project to
fulfill their basic educational requirements.

Beneficiaries Identification
A team of Al Noor Foundation consisting of multidisciplinary professionals will
survey in Islamabad and Rawalpindi region of Pakistan to identify the vulnerable
beneficiaries.

Background and Rationale:


Al-Noor Foundation is Non-Political Non-profitable and Non-governmental
organization (NGO) who has already completed similar projects i.e. Non Formal Basic
Schools and Al Noor Community Model Schools projects. In order to fulfill the role
identified for itself by AL-NOOR FOUNDATION, a multidisciplinary team of social
scientists, engineers, and human settlements planners has been created. The point of
departure of AL-NOOR FOUNDATION lies in its multidisciplinary professional resource
base and a holistic/integrated approach in the preparation and implementation of projects.
Specializing in the upgrading and development of infrastructure for urban and rural
communities.

Project Description Indicators Verification Assumption


Objective Observable and Observations, Recommendations
Objective-I of this project is to measurable visit and group will be accepted
conduct a comprehensive characteristic will discussions will by policy makers.
assessment of Afghan refugees be used to show form part of the
living in Islamabad and progress a participatory
Rawalpindi, and their marginal programme is monitoring.
area to identify the vulnerable making toward
who are in dire need of getting achieving a
education. specific outcome.
The objective-II is the The change
enrollment and retention of measured will
Afghan refugee’s children and to represent progress
build sustainable educational that the
infrastructure to fulfill their programme hopes
basic needs of education. to make.
Purpose: Increased level of Interview or Participant
The project will operate a satisfaction of the surveys, refugees willing
communal project headquarters refugees. Members own and able to share
at the same time distribute contribution. information,
available inputs to the project Enabling regional
beneficiaries. These inputs will communication
be recovered and recycle to infrastructure.
other beneficiaries until all
project members are in service.
Outputs: Level of Monitoring and Capability and
Educational network awareness of evaluation basic
coordination and management educational reports. infrastructure to
system established and competencies in implement
appropriate policies will be refugees will control measures
recommended. increase. available.
Activities: In order to Periodically Draft a model
Organize information flow implement these survey will be policy statement
plans, steering committee activities the conducted to get to reflect need for
meetings and organize trainings major problem feedback on key educational
and coordinate with other that will be faced aspects of the environment and
developmental education and which it will policy. integration of
programs. be tried to address protection of
is the lack of the educational
most appropriate management
educational inputs plans.
to start normal
activities.
Sustainability: Assumption of Sustainability:
It is expected that with the provision of funds, the project
will be able to achieve its objectives. After termination of
donor funds the resurrect expenditure would be met from
the revolving fund.
Budget Summary: Please find the attached Excel list.

You might also like