This document provides a checklist for job planning that includes identifying pre-shutdown activities, job tasks and procedures, post-completion activities, required parts and materials, tools and equipment needed, investigating job priority and obtaining relevant documents and forms. It also includes checking that the work order is completed correctly and progressed to the appropriate status.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
55 views
Job Planning Checklist
This document provides a checklist for job planning that includes identifying pre-shutdown activities, job tasks and procedures, post-completion activities, required parts and materials, tools and equipment needed, investigating job priority and obtaining relevant documents and forms. It also includes checking that the work order is completed correctly and progressed to the appropriate status.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1
JOB PLANNING - CHECKLIST
Work Order Number: Procedure
_______________________________ (_) Identify pre-shutdown and job set up activities. Work Order Description: (_) Identify sequenced job tasks and job procedure. (Use Job Planning Form) _______________________________ (_) Identify post-completion activities. Date Started: Parts/Materials Identification _______________________________ (_) Determine the parts required to do the job (Use Job Planning Form) Planner: (_) Determine material specification requirements (Use Job Planning Form) _______________________________ Dept. / Area / Location: Tools/Equipment Identification _______________________________ (_) Identify special tools to do the job, i.e., rigging, safety equipment and tools not normally in the craftsmen’s possession. (Use Job Planning Form) Investigation and Research (_) Identify mobile equipment needed to perform the job. Determine priority for planning this job (1- Work Order 10). (_) Filled out completely and correctly (_) Obtain appropriate documents and (_) Progressed to appropriate status forms for planning: (_) In Planning: (Date) __________ (Duration) __________ (_) Work Order (_) Parts Shortage: (Date) __________ (Duration) __________ (_) Planner Field Checklist (_) Requisitions Approved. (_) Ready for Scheduling: (Date) __________ (Duration) __________ (_) Job Planning Form (_) Sub-Work Orders required. (_) Review job site (Field Check List) (_) Written (_) Planned (_) Existing plan or procedure: (_) Ready: (Date) __________ (Duration) __________ (_) Preplan __________ (_) Repetitive __________ Planned Work Order Package Checklist (_) SMP__________ (_) Work Order (_) Materials List (_) SMP (_) JHA__________ (_) MEP/Venture Summary (_) Lead Time (_) JHA (_) Work Order(s): (_) Permits (_) Parts Verification (_) LO/TO Sheet (_) SDS (_) Tool List (_) QA/QC Forms __________________________________ ______________________________ (_) References: __________________________________________________ (_) Review equipment history: (_) Other: _______________________________________________________ (_) MTBF __________ (_) RCA __________ (_) Planned Work Order Package filed for future use. (_) Noticeable Pattern(s): __________________________________ __________________________________ ____________________________