TCR Arabia Company LTD.: Penetrant Testing Report

TCR Arabia Company Ltd. conducted a penetrant testing report on April 9, 2019 for SAFCO on a demister support extension weld at a location in Jubail, KSA. The test used solvent removable penetrant and was inspected under visible light, finding no relevant surface indications. The item was accepted as meeting the acceptance standard of ASME V Article 6.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
86 views

TCR Arabia Company LTD.: Penetrant Testing Report

TCR Arabia Company Ltd. conducted a penetrant testing report on April 9, 2019 for SAFCO on a demister support extension weld at a location in Jubail, KSA. The test used solvent removable penetrant and was inspected under visible light, finding no relevant surface indications. The item was accepted as meeting the acceptance standard of ASME V Article 6.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

TCR Arabia Company Ltd.

PENETRANT TESTING REPORT


Client SAFCO Reference Code ASME V Article 6 Date Tested April 9, 2019
Project SF2 TA2019 Test Procedure QCP/TCR/PT/3.0 Rev. 3 Report No.
Location Jubail KSA Acceptance Standard AS PER PROCEDURE Page 1 of 1

TEST METHOD CONSUMABLES SURFACE CONDITION


Solvent Removable Cleaner MAGNAFLUX SKC-S Welded Grinded
Water Washable Penetrant MAGNAFLUX SKL-S2 Machined ` Others
Post-Emulsifying Developer MAGNAFLUX SKD-SP2 Forged `
Visible Emulsifier - Casting `
Fluorescent Others - Rolled

INSPECTION PROCESS
Pre-Cleaning Wiping Emulsifier Application -
Penetrant Application Spraying Visible Light Intensity 100 fc
Penetrant Removal Wiping Black Light Intensity -
Developer Application Spraying Minimum Developing Time 10 mins.
Drying Process Normal Testing Temperature Ambient
Minimun Dwell Time 5 – 10 mins. Post-Cleaning -
Item Specification 1 – C – 301

TEST RESULTS
S.I No. Item Description Observation Result
1 – C – 301 Demister Support Extension weld
1 No Relevant Surface Indication ACCEPTED
connections (4)

NOTE:

Inspected by: Reviewed by:

RONEL CUSTODIO
TCR ARABIA NDT Level II CLIENT REPRESENTATIVE
Date April 9, 2019 Date

P.O. Box – 8143, GAS Gardens, King Abdulaziz Seaport Facility, Dammam-32224
(T) 00966-13-8475784 / 00966504997683 (e) [email protected] (w) www.tcr-arabia.com