Form Approval Material
Form Approval Material
Contractor Subcontractor
This form shall be completed prior to submittal. If this form is not compete at time of submittal it may be For WSDOT Use Only
returned for information that was omitted. RAM #
Bid Item Material or Product/ Name and Location of Fabricator, Specification Reference PE/QPL Code Hdqtr./QPL Code
No. Type Manufacturer or Pit Number
Acceptance Action Codes for use by Project Engineer and State Materials Laboratory
1. Acceptance Criteria: Acceptance based upon “Satisfactory” Test Report for samples of materials to be incorporated into project.
2. Acceptance Criteria: Mfg. Cert. of Compliance for ‘Acceptance’ prior to use of material.
3. Acceptance Criteria: Catalog Cuts for ‘Acceptance’ prior to use of material. Catalog Cut Approved Yes No
4. Acceptance Criteria: Submit Shop Drawings for ‘Approval’ prior to fabrication of material.
5. Acceptance Criteria: Only ‘Approved for Shipment’, ‘WSDOT Inspected’ or ‘Fabrication Approved Decal’ material shall be used.
6. Acceptance Criteria: Submit Certificate of Materials Origin to Project Engineer Office.
7. Acceptance Criteria: Request Transmitted to State Materials Laboratory for Approval Action.
8. Source Approved: