The document outlines two payment plans - a flexi plan and a construction linked plan. The flexi plan requires a 10% down payment within 45 days, followed by 20% payment on commencement of finishing, 30% on completion of structure, and 40% plus charges on possession. The construction linked plan sets installment payments at key construction milestones, starting at 5% of booking amount on application and increasing from 10% at foundation to 10% on completion of flooring and plaster. The final payment is 5% plus other charges on possession. The document also provides pricing details for parking, club membership, power and water based on the floor and unit size.

Uploaded by

King
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views1 page

Boring

The document outlines two payment plans - a flexi plan and a construction linked plan. The flexi plan requires a 10% down payment within 45 days, followed by 20% payment on commencement of finishing, 30% on completion of structure, and 40% plus charges on possession. The construction linked plan sets installment payments at key construction milestones, starting at 5% of booking amount on application and increasing from 10% at foundation to 10% on completion of flooring and plaster. The final payment is 5% plus other charges on possession. The document also provides pricing details for parking, club membership, power and water based on the floor and unit size.

Uploaded by

King
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Payment Plan Down Payment(%) Flexi Plan Construction Linked Plan (%)

Token / Booking amount within Token booking of 500000/- (10% to be completed Token booking of 500000/- (10% to be completed-
45 days Within 45 Days) Within 45 days)
Within 75 days 85% 20%
On Completion of Structure 40% + 50% of All Allied & Other Charges See detailed plan below
On Commencement of Finishing

On Possession 5% + Allied Charges 30% + 50% of All Allied & Other Charges
Notes Pricing Benefits on Down Payment Plan

On Completion

On Completion

On Completion
On Casting Top
Fifth Floor Slab
Within 45 days

Within 75 days

First Floor Slab


On Apllication

On Possession
of Brick Work
/ Booking

Foundation
Construction Linked Plan

On Plinth /

Third Floor
On Casting

On Casting

On Casting

of Flooring
of Booking
of booking

Floor Slab

of Plaster
detailed

Slab
Installment Due 500000 5% 10% 10% 10% 10% 10% 10% 10% 10% 10% 5%
of BSP less All charges for Parking,

Bal Other
Of BSP &
Amount
Booking

Charges
All PLC, Club, EDC,IDC,
Other Charges Payment Plan
Power, Water to be paid
in 3 equal installments
GF & 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor
PLC Charges (per Sq Foot) (INR Per Sq ft) (INR Per Sq ft) (INR Per Sq ft) (INR Per Sq ft) (INR Per Sq ft) (INR Per Sq ft)
Lake View PLC (psf) 500 500 500 500 500 500
Corner PLC (psf) 250 250 250 250 250 250
Floor Rise PLC (psf) 0 100 200 300 400 500
Car Park & Club GF & 1st Floor 2nd Floor 3rd Floor 4th Floor 5th Floor 6th Floor
Car Park- 2 Car Parks Mandatory @
500000 500000 500000 500000 500000 500000
INR 2.5 Lakhs per Car Park
Extra Car Park (INR) 300000 300000 300000 300000 300000 300000
Club Membership (INR) 250000 250000 250000 250000 250000 250000
Power & Water 3 BHK 3 BHK + SQ 4 BHK + SQ 5 BHK + SQ
External Electrification & Water External Electricity and Water Charges shall be Approx INR 65/- to 75/- per sq foot on saleable area.
Charges This is subject to final cost which may vary at time of possession
Mandatory Back up 3 KVA 3 KVA 5 KVA 7 KVA
Charges Per KVA (INR) 50000 50000 50000 50000
Other Charges 3 BHK 3 BHK + SQ 4 BHK + SQ 5 BHK + SQ
External & Internal Development
150 150 150 150
Charges (INR Per Sq. Ft.)
Interest Free Maintenance
90 90 90 90
Deposit (INR Per Sq ft)
The Installments shall become payable on demand irrespective of the order in which they are listed
The lock in period of transfer is 2 years, prior to which the company shall not permit transfer of the allotted apartment
All Taxes and Govt levies and/or lease charges shall be applicable on the each of the installments and charges above
Stamp Duty, Sales Tax, Vat, Service Taxes &/or any other govt charges/misc charges as aplicable shall be payable by the allottee
The above prices and charges including the plans indicated above are subject to change by the company without prior notice to public
NUSR- Payment and Charges Plan Issue Date 01-01-2014