100% found this document useful (1 vote)
1K views

Activity Design

The document summarizes a proposal by the Sangguniang Kabataan of Barangay Cubi, Dumarao, Capiz to renovate the local wooden basketball board into a fiberglass material. The renovation aims to encourage youth to play basketball and develop a healthy lifestyle. It has an estimated budget of 60,000 pesos, with 83.33% allotted for materials and 16.67% for labor. A terminal report will be submitted within 15 days of completing the activity.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views

Activity Design

The document summarizes a proposal by the Sangguniang Kabataan of Barangay Cubi, Dumarao, Capiz to renovate the local wooden basketball board into a fiberglass material. The renovation aims to encourage youth to play basketball and develop a healthy lifestyle. It has an estimated budget of 60,000 pesos, with 83.33% allotted for materials and 16.67% for labor. A terminal report will be submitted within 15 days of completing the activity.
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

Province of Capiz
Municipality of Dumarao
Barangay Cubi

ACTIVITY DESIGN

Contact No.: 09127932866 Email: [email protected]

I. Title
RENOVATION OF THE LOCAL WOOD BASKETBALL BOARD INTO FIBER
GLASS MATERIAL

II. Venue
Barangay Gym, Barangay Cubi, Dumarao, Capiz

Office of the Sangguniang Kabataan

Support for the needs of the Barangay Cubi basketball fiber board renovation.

III. RATIONALE

Basketball is one of the traditional games of the Filipino people; hence it is


one of the favorable sports in our respective Barangay since it brings joy and
entertainment to the audience as well as to the players. It also helps the players
develop their tactics and work as a team for them to develop sportsmanship
and camaraderie.
The Sangguniang Kabataan of Barangay Cubi decided to renovate the
basketball board in our Barangay gym to encourage the youth to play and do
healthy lifestyle that we deem favorable in the part of the youth since almost of
the youth in our Barangay loves to play the said game.

IV. OBJECTIVES

A. This project is considered to encourage youth to play and develop


healthy lifestyle.
B. Purchase the needed requirement in renovating the old basketball
board to a fiber material.
C. Develop the exterior design and appearance of our basketball board.
BUDGETARY REQUIREMENTS

Breakdown of Estimated Expenditures and Cost/Percent of total

Materials P50, 000.00 ------------- 83.33%


Labor P10, 000.00 ------------- 16.67%
Total Direct Cost P60, 000.00 ------------- 100%

MONITORING AND EVALUATION

A terminal report shall be submitted to the Punong Barangay , copy furnished to


the Local Youth Development Officers and the DILG Municipal Office within 15
days after conducted the activity.

Prepared by:

NOLI F. FRIAS JAYSON P. RAFAEL


SK Chairperson Barangay Treasurer

CARMELO S. VILLACORTE