Permit To Work at Night

This permit document allows work to occur at night at the Abengoga site, provided certain safety precautions are followed. The permittee must wear full PPE, use an ELCB-protected power connection, only perform non-gas coating work, and have a CO2 fire extinguisher available. Adequate lighting of 60 LUX minimum is also required. The project manager must authorize the night work after reviewing the permit and safety precautions. The permit must then be returned after the work is completed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
260 views

Permit To Work at Night

This permit document allows work to occur at night at the Abengoga site, provided certain safety precautions are followed. The permittee must wear full PPE, use an ELCB-protected power connection, only perform non-gas coating work, and have a CO2 fire extinguisher available. Adequate lighting of 60 LUX minimum is also required. The project manager must authorize the night work after reviewing the permit and safety precautions. The permit must then be returned after the work is completed.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

ABENGOA

PERMIT TO WORK AT NIGHT

A. To be filled by the person taking the permit:

Name of Site :
Area / Location of site:
Date:
Permit required from time:

Description of work being carried out:

Precautionary Measures proposed while carrying out the activity

1. Full PPE’s –Face Shield ,Leather hand gloves, Hand sleeves ,safety shoes mandatory.
2. Power connection through ELCB 30 mA sensitivity
3. No gas cutting allowed in NIGHT-Strictly only rapping coating allowed.
4.Co2 Type Fire extinguisher at gas cutting spot .

Name of the Permittee:-


Designation: Construction Manager/Section in charge /Site Engineer
Signature:

B. To be filled by the Issuing Authority:

Addition Precautionary Measures to be taken with respect to working at night:

Lighting arrangement/ Sufficient illumination 60 LUX Min.

Authorised to work at night with the above mentioned safety precautions.

Name of the Issuing Authority:


Designation: Project Manager
Signature:

Note: Permit to be returned to EHSO after completion of the work