Lhogendhran Sermugam: Project Executive
Lhogendhran Sermugam: Project Executive
Project Executive
SKILLS
COMMUNICATION CONQUAS ASSESMENT
LEADERSHIP RISK MANAGEMENT
TEAM MANAGEMENT TIME MANAGEMENT
NEGOTIATION JUDGEMENT AND DECISION MAKING
QLASSIC ASSESMENT CRITICAL THINKING
WORK EXPERIENCE
Project Executive
Successer Construction
09/2018 – Present Selangor
Associate in the design process with client to archive desired outcome. In charge of getting needed approval and
permission from the authority. Managing overall project from human resource, quality, scheduling, payment, finishing
and hand over.
Ensure compliance and adherence to Health and Safety regulations, standard operating procedures & values, quality
assurance accreditations, and the company's commitment to best practice with legislation and codes of good working
practices relevant to all work activities.
Implement the use of Industrial Building System (IBS) supported materials, lead to improve the quality and reduce the
completion time and increase profit rate by 10%.
Project Executive
Merah Bayu Global Sdn Bhd
03/2018 – 06/2018 Port Dickson, N.S
Involved in a 3-star hotel refurbishment project. Involved in design team as owner’s representative to reach the desired
luxury feel. Prepared the work schedule, tender the sub contract work and monitor the work to archive the best quality
and finishing. Prepare purchase order, progress claim, debit note, memo and project costing.
Negotiate with the sub-contractors based on the existing price by identify changes in the trade works.
Completed the project 7 days’ earlier trough real time progress update, troubleshoot discrepancy in the drawings, make
available of the needed resources before the work starts and early confirmation on the finishes to be used.
Clerk of Works
Guangxi Dev & Cap Sdn Bhd
02/2015 – 07/2017 Ampang, K.L
Oversee the quality and the safety of work in a construction site. Ensure planned building works follows the correct
specification and perform regular inspection of the work and finding inconsistency of completed work with drawings
and specifications. Identifying defects and suggesting ways to correct them. Monitoring and reporting progress to
construction managers, architect and clients.
Closely monitor the work schedule, troubleshoot the trade issue and organise meeting among the stake holders and
authority to complete the project and slashed the project delay by 50%.
Page 1 of 2
Project Executive
RDS Jaya Malaysia
10/2014 – 02/2016 Sungai Petani, Kedah
Ensure interior design, renovation, fit out works for tenants. Inspect and comment on drawing and fit out proposals
submitted by tenants. Prepare technical drawings and construction drawing adequate for contractor’s quotation. Monitor
and ensure that all the renovation and fit out works are carried out. Liaison and coordination with tenants, contractors
and architects on regular basis.
Handled two project concurrently, with the limited resources and complete the both project within the deadline.
Project Coordinator
Bina SKK Sdn Bhd
10/2012 – 09/2014 Selangor
Responsible for ensuring completion of projects both on time and within budget. Scheduling resources to perform work
Coordinating projects from design to completion, working with company directors and shareholders
Assess project risk and issues and ensure follow up actions to mitigate those issues.
Chair and facilitate meetings where appropriate and distribute minutes to all project team members
Sales Representative
JSOFT Solution
03/2012 – 09/2012 Manchester, U.K
Represent the local telco company in selling their telco product. Work with customers to find their need, create solution
and introduce new product to ensure a smooth sales process. Find new sales leads through business directories and
client referral.
Site Supervisor
Bina SKK Sdn Bhd
10/2010 – 09/2011 Kajang, Selangor
Monitor ongoing construction to ensure that the work is being done correctly and the project stay on schedule
Conducting inspections and identify problems daily to ensure not to budget overruns
Day to day management of civils team and subcontractors. Monitoring relevant construction materials to ensure
availability of resources and eliminate waste
Requisitioning relevant plant, machinery and materials
Conduct Health and safety training and the tool box meeting weekly once.
EDUCATION
PG Dip. Construction Management
University of Salford
09/2011 – 09/2012 Manchester, U.K
Bach (hons) Construction Management
Kuala Lumpur Infrastructure University College (KLIUC)
06/2008 – 11/2011 Serdang, Malaysia
ACHIEVEMENTS
Train Semi Skilled Worker
Train and lead unskilled workers to skilled and semi-skilled workers. This worker helps me to reduce the cost of
constructing drainage, brick fences and plastering works.
Industrial Building System (IBS)
Implement IBS in design and replace existing traditional construct method and improve the quality and reduce the
completion duration which leads to increase in profit range.
INTEREST
Interested in learning new method of construction and keep on up-to-date the changes in construction industry which
helps to complete the project on time, cost and schedule.
Member of CIDB, RICS and CIOB
Page 2 of 2