Qms Activities Detail: SR No Activities Description Requirements Responsibility Status

The document lists 13 activities related to quality management system (QMS) requirements and responsibilities. It includes arranging racks and stands according to layout plans, identifying and properly storing all materials, requiring 5S practices in all areas, and providing training to supervisors. Safety equipment suppliers have been contacted and quotations for items are pending from the selected supplier. Templates for both plants need to be ordered and approved by the director, while angles required by 19 February according to previous indents are still pending.

Uploaded by

Vikas Kashyap
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views

Qms Activities Detail: SR No Activities Description Requirements Responsibility Status

The document lists 13 activities related to quality management system (QMS) requirements and responsibilities. It includes arranging racks and stands according to layout plans, identifying and properly storing all materials, requiring 5S practices in all areas, and providing training to supervisors. Safety equipment suppliers have been contacted and quotations for items are pending from the selected supplier. Templates for both plants need to be ordered and approved by the director, while angles required by 19 February according to previous indents are still pending.

Uploaded by

Vikas Kashyap
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

QMS ACTIVITIES DETAIL

SR NO ACTIVITIES DESCRIPTION REQUIREMENTS RESPONSIBILITY STATUS

1 Provide proper stand for keep angle, road etc 600 ft pipe of 1 inch QMS TEAM A/O
100 ft angle of
2 Provide proper stand for keep Feed roll A/O
50mmx50mmx 5 mm QMS TEAM
3 Arrangement of Rack as per lay out Ajay Gupta / QMS TEAM Under process

4 Keep all material with identification and proper Place. Ajay Gupta / QMS TEAM Under process

5 Before keep all items 5"s" Must be required in all area. Ajay Gupta / QMS TEAM
6 Provide Training to all supervisor and must be follow up

For keep other heavy tool we need to make arrangement of ( 1 requirement given to supplier but
7 Rack Required QMS TEAM
inch length x 1.5 inch width block in side wall ) as per lay out. awaiting for quotation.

visited at our company on dated 13.02


8 Provide Safety Equipment supplier. QMS TEAM and given all detail about safety
products.
Supplier ( P N SAFTECH
9 Quotation required for all items
PVT LTD )
Finalize the qty of safety products and model, and payment release the P.O of Mr. Deepak Singh & Mr.
10 With the discussion with our Director
teams and condition. required qty of items Shiv Prakash

Mr. Deepak Singh & Mr. Meeting held on dated 13.02.09 with
11 Proper stand required for Raw Material storage area in plant-2. Jignesh Sheth & Mr. Vinay supplier and he will provide drawing,
Kumar design and quotation for that.

signature in indent and finalize the


12 Templates for both the plant required to be order. release the P.O Mr. Dheeraj ji ( Director )
payment teams for supplier.

300 Kg angle till pending due to this


13 Angle required for as per our indent requirement indent 01 Mr. Aroraji & Mr. M.B.Singh our work will be suffer on 19.02.09,
Provide as early as possible.