Business Report Gantt Chart

The document outlines the schedule and timeline for a business report project. It includes key tasks such as group meetings, research, interviews, writing individual sections, drafting the report, and submitting the final assignment. The schedule spans from December 8th to January 8th with tasks assigned specific start and end dates and durations.

Uploaded by

Nguyen Tan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Business Report Gantt Chart

The document outlines the schedule and timeline for a business report project. It includes key tasks such as group meetings, research, interviews, writing individual sections, drafting the report, and submitting the final assignment. The schedule spans from December 8th to January 8th with tasks assigned specific start and end dates and durations.

Uploaded by

Nguyen Tan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Task Start date Duration End date

Group meeting 8-Dec 1 9-Dec


Meeting with lecturer 10-Dec 1 11-Dec
Research information about compa 11-Dec 1 12-Dec
Finalize interview 13-Dec 1 14-Dec
Arrange interview & send question 16-Dec 1 17-Dec
Interview 19-Dec 1 20-Dec
Group work on Google Doc 20-Dec 18 8-Jan
Collect and sort information 20-Dec 4 24-Dec
Each member writes their part 24-Dec 7 31-Dec
1st draft - meeting with lecturer & 31-Dec 3 3-Jan
2nd draft - meeting with lecturer & 3-Jan 3 6-Jan
Submit report 1st time & check orig 6-Jan 1 7-Jan
Submit assignment 2nd time 7-Jan 1 8-Jan

Business Report Gan


8-Dec 12-Dec 16-Dec 20-D
Group meeting
Meeting with lecturer
Research information about company
Finalize interview
Arrange interview & send question
Interview
Group work on Google Doc
Collect and sort information
Each member writes their part
1st draft - meeting with lecturer & editing
2nd draft - meeting with lecturer & editing
Submit report 1st time & check originality
Submit assignment 2nd time

Start Date Duratio


siness Report Gantt Chart
2-Dec 16-Dec 20-Dec 24-Dec 28-Dec 1-Jan 5-Jan 9-Jan

Start Date Duration