Materials and Labour Bill For Segregation of Electrical Line Work in S.C. No RHN 13 (Block I)
Materials and Labour Bill For Segregation of Electrical Line Work in S.C. No RHN 13 (Block I)
1 Dismantling of existing 2 nos 3/20 5 Wire line from main 6x25 1500
board to Distribution board in 1st floor and ground floor. 0
2 Newly erected 4 sq mm 5 wire line from main board to 4x25 1000
ladies room and Hall no 1 to 4 in ground floor. 0
3 Newly erected 7/20 5 wire line from main board to 1st floor 4x25 1000
0
4 Segregation and dismantling of existing wires and circuit 3x25 750
board in main board 0
5 Newly erected 6 nos 63 amps Fuse unit for generator supply 6x15 900
0
6 Newly erected 9 nos 32 amps Fuse unit for EB Supply 9x10 900
0
7 Newly erected 6 nos 15 amps Fuse unit for Circuits 6x50 300
8 Newly erected 1 no copper earth 1x60 600
0
9 Materials transporting 120
1 Materials bill enclosed
0 1. Bill No 51 dated 29-9-10 15986
2. Bill No 52 dated 5-10-10 6706
Total 29762
(Rupees Twenty Nine Thousand Seven hundred and Sixty Two only)
Wiring Contractor
Materials and Labour Bill for Segregation of Electrical Line work in
S.C. No RHN 1184 (Block II) (Chemistry Wing)
1 Dismantling of existing 2 nos 3/20 5 Wire line from main 6x25 1500
board to Computer Lab and Chemistry Department. 0
2 Newly erected 7/16 Four Wire Overhead line from 6x25 1500
Generator Room main board to Distribution board 0
3 Newly erected 1 No distribution board with 40 amps 4 pole 3x25 750
isolator and 3 nos 32 amps M.C.B. in ground floor 0
4 Newly erected 1 No Distribution board with 1 no 32 amps 4 3x25 750
pole isolator and 3 nos M.C.B. in First Floor. 0
5 3 Nos 100 amps Fuse Unit erected in S.C. No 1184 Main 3x15 450
Board 0
6 Newly erected 1 length 3” GI pipe for support of Overhead 2x25 500
line. 0
7 Newly erected 7/20 Five wire line from Distribution board 3x25 750
to computer room. 0
8 Newly erected 4 sq mm 5 wire line from distribution board 3x25 750
to Zoology Department. 0
9 Newly erected 4 sq mm 5 wire line from distribution board 3x25 750
to Chemistry department. 0
1 Newly erected 2.5 sq mm 5 wire line from Distribution 3x25 750
0 board to Class Rooms in First Floor. 0
1 15 Nos 15 amps Fuse Unit erection for circuits 15x5 750
1 0
1 1 No Copper earth erected for distribution board 1x60 600
2 0
1 Dismantling of existing line from main board to first floor. 3x25 750
3 0
1 Material transporting 120
4
1 Materials bill enclosed
5 1. Bill No 46, 47 dated 17-9-10 35833
2. Bill No 2114 dated 15-9-10 2888
Total 49391
(Rupees Forty Nine Thousand, Three Hundred and Ninety One only)
Wiring Contractor
Materials and Labour Bill for Segregation of Electrical Line work in
S.C. No RHN 26 (Block III) (Computer, Microbiology, Auditorium
Wing)
1 Dismantling of existing 7/16 5 wire line from main board 5x250 1250
to computer room.
2 Newly erected 19/16 4 wire line with 1½ PVC Pipe from 160’ x 20 3200
main board to computer room.
3 Dismantling of existing 6 sq mm (Alu) 4 wire line from 4x250 1000
main board to controller wing distribution board
4 Dismantling of 7/16 4 Wire Over head line from main 8x250 2000
board (S.C.No1184) to Microbiology distribution board)
5 Newly erected 7/16 4 wire line from distribution board to 80’ x 20 1600
microbiology dept and auditorium with 1¼ inch PVC pipe
6 Dismantling of existing 2.5 sq mm 4 wire line from 3x250 750
Controller block to auditorium
7 Newly erected 3 nos 200 amps fuse unit in computer lab 3x200 600
8 Newly erected 3 nos 63 amps fuse unit for microbiology 3x150 450
department
9 Newly erected 3 nos 32 amps fuse unit for English 3x100 300
department wing.
1 Dismantling of 3 nos broken 200 amps fuse unit in service 3x200 600
0 main and newly erected 3 nos 200 amps fuse unit.
1 Dismantling of existing 2.5 Three phase 4 wire line from 3x250 750
1 main board to English department
1 Newly erected 1 no copper earth 1x600 600
2
1 Materials Bill enclosed
3 1. Bill No 39 dated 18-9-10 77062
2. Bill No 2117 dated 11-9-10 2610
Total 92772
(Rupees Ninety Two thousand, Seven Hundred and Seventy Two Only)
Wiring Contractor
Materials and Labour Bill for Segregation of Electrical Line work in
S.C. No RHN 1205 (Block IV) (Controller Wing)
1 Earth pit excavation and refilling for UG cable from main 8x250 2000
board to controller block
2 Laying of 25 sqm 4 Core UG cable from main board to 72 m x 30 2160
distribution board with 1 ½ PVC Pipe.
3 Newly erected 1 No copper earth for distribution board 1x600 600
4 Newly erected 1 No distribution board with 40 amps four 2x250 500
pole isolator and 3 nos M.C.B.
5 Dismantling of existing lines and distribution board 2x250 500
6 Newly erected 4 Sq mm 3 phase 4 wire line from 4x250 1000
distribution board to language lab.
7 Line fault attended in controller room main board 3x250 750
8 Dismantling and re erection of 7/16 Five wire line from 80’x20 1600
E.library to controller room main board with 1¼ inch
PVC pipe due to earth fault.
9 Materials transport 120
1 Materials Bill enclosed :
0 1. Bill No 44 dated 15-9-10 21920
2. Bill No 2121 dated 18-9-10 1148
Total 32298
(Rupees Thirty Two Thousand, Two Hundred and Ninety Eight Only)
Wiring Contractor
Materials and labour bill for Speaker line and tube light wiring work in
S.A. College pallivasal.
Wiring Contractor
Materials and labour bill for Newly erected 3 phase 4 wire line from main
board to Nutrition Laboratory in S.A. College
Wiring Contractor
Materials and labour bill for newly erected A/C line and generator line work
in chemistry department
Wiring Contractor