1. Production order 1 was created for location 171B with components COMP-A, COMP-B, and COMP-C. 2. A production schedule was created from 100 to 80 units with a PSA assigned to internal location 171B. 3. Materials will be transferred from location 171B to 171D using stock transfer type 0007 with a planned pull of materials from locations based on the production schedule.

Uploaded by

balu4indians
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
169 views

EWM To PP Integration

1. Production order 1 was created for location 171B with components COMP-A, COMP-B, and COMP-C. 2. A production schedule was created from 100 to 80 units with a PSA assigned to internal location 171B. 3. Materials will be transferred from location 171B to 171D using stock transfer type 0007 with a planned pull of materials from locations based on the production schedule.

Uploaded by

balu4indians
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Production Location

Production Order
1 171B

FG126 1
COMP-A 2
COMP-B
COMP-C

d
1VB c
1FY b
a
start end
100 80
EWM Location

171D PSA

Functional Steps
Create PSA (PSA-001) and assign it to IM location-171B
Create the control cycle with reference to PSA-001
Stock transfer type-'0007 (Stock Transfer with delivery)
Storage Location -171D

80
100 100 Discre PLAN ORDERS
100 80 Rep PLAN ORDERS

Pull
Pick lis
Contol
EWM IM

IM IM
50 50 50
PRODUCTION GI Against production Order Production Confirmation agaist Production ORDER
- Pull List/Matarial Staging Planned order confirmation/Auto gr
IM
50
GR Against Production order

You might also like