0% found this document useful (0 votes)
244 views15 pages

Approximate Method - PPSX

Uploaded by

suman subedi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views15 pages

Approximate Method - PPSX

Uploaded by

suman subedi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPSX, PDF, TXT or read online on Scribd
You are on page 1/ 15

Approxim

ate © snlkhyaju
2018

Method
with
Pedestria
Approximate Method
n signal
Assistant Professor
Er. Sunil Khyaju
1
Nepal Engineering College
Traffic Signal Design: Approximate © snlkhyaju
2018
method
Example: An isolated signal with pedestrians
indication is to be installed on a right angled
intersection with road A, 18m wide and road B,
12m wide. The heaviest volume per hour for each
lane of road A and B are 275 and 225
respectively. The approach speeds are 50 and 40
kmph for road A and B respectively. Design the
timing of traffic and pedestrian signals

Approximate Method 2
Traffic Signal Design: Approximate © snlkhyaju
2018
method
 Based on speed, Aa=4 sec and Ab=3 sec Road A

 Based on pedestrian walking speed 1.2 m/s,


Clearing time for road A
Clearing time for road B

Road B

Approximate Method 3
Traffic Signal Design: Approximate © snlkhyaju
2018
method
 Based on speed, Aa=4 sec and Ab=3 sec Road A

 Based on pedestrian walking speed 1.2 m/s,


Clearing time for road A
Clearing time for road B
 Add 7 sec for initial walk period then
Minimum red time for road
Road B

Approximate Method 4
Traffic Signal Design: Approximate © snlkhyaju
2018
method
 Based on speed, Aa=4 sec and Ab=3 sec Road A

 Based on pedestrian walking speed 1.2 m/s,


Clearing time for road A
Clearing time for road B
 Add 7 sec for initial walk period then
Minimum red time for road
Road B
c
7 se
c
7 se

Approximate Method 5
Traffic Signal Design: Approximate © snlkhyaju
2018
method
 Based on speed, Aa=4 sec and Ab=3 sec Road A

 Based on pedestrian walking speed 1.2 m/s,


Clearing time for road A
Clearing time for road B
 Add 7 sec for initial walk period then
Minimum red time for road
Road B

Approximate Method 6
Traffic Signal Design: Approximate © snlkhyaju
2018
method
 Minimum green based on pedestrian requirement for road

Approximate Method 7
Traffic Signal Design: Approximate © snlkhyaju
2018
method
 Minimum green based on pedestrian requirement for road Road A

Road B

Approximate Method 8
Traffic Signal Design: Approximate © snlkhyaju
2018
method
 Minimum green based on pedestrian requirement for road Road A

Road B

Approximate Method 9
Traffic Signal Design: Approximate © snlkhyaju
2018
method
 Minimum green based on pedestrian requirement for road Road A

B
 Based on approach volume, the green time calculated
for road A with higher traffic Volume

 Total cycle length


Road B

Approximate Method 10
Traffic Signal Design: Approximate © snlkhyaju
2018
method
 Additional period = 50 - 49.2 = 0.8 sec is distributed to green Road A
timing in proportion to approach traffic volume

And

Road B

Approximate Method 11
Traffic Signal Design: Approximate © snlkhyaju
2018
method
Design of Pedestrian Signal Road A
 Do not walk (DW) period of pedestrian signal at road A
(PSA) is red period of traffic signal at B.
(PSA), DWA= RB=27.64 secs
(PSB), DWB= RA=22.36 secs
 Pedestrian clearance intervals (CI) are of 15 and 10
sec for road A and B
\ Walk time (W) is calculated from total cycle length
For PSA, WA= 50 – (27.64+15) = 7.36 sec Road B

For PSB, WB= 50 – (22.36+10) = 17.64 sec

Approximate Method 12
Traffic Signal Design: Approximate © snlkhyaju
2018
method
Phase Diagram
Road A
Road A
A1
G1=23.64 sec R1=G2+A2=22.36
=4

PSB

wB=17.64 sec CI = 10 DWB=22.36

Road B
4 s ec s
17.6

Approximate Method 13
Traffic Signal Design: Approximate © snlkhyaju
2018
method
Phase Diagram
Road B
A Road A
R=27.64 sec G=19.34
=