1. The document provides a quick estimation of costs for a 1000 square foot structure project including labor, materials, and finishing work.
2. Material costs typically account for 65-70% of the project cost while labor accounts for 30-35%. Sub-structure costs are 15-20% and super-structure costs are 80-85% of the project cost. Labor costs increase 10% for each additional floor above 10 meters.
3. Tentative steel requirements per cubic meter are provided for beams, columns, slabs, footings, rafts, and flat slabs. Material requirements are estimated for a 1000 square foot structure.
1. The document provides a quick estimation of costs for a 1000 square foot structure project including labor, materials, and finishing work.
2. Material costs typically account for 65-70% of the project cost while labor accounts for 30-35%. Sub-structure costs are 15-20% and super-structure costs are 80-85% of the project cost. Labor costs increase 10% for each additional floor above 10 meters.
3. Tentative steel requirements per cubic meter are provided for beams, columns, slabs, footings, rafts, and flat slabs. Material requirements are estimated for a 1000 square foot structure.