Operation Management PDF
Operation Management PDF
JNU, Jaipur
First Edition 2013
JNU makes reasonable endeavours to ensure content is current and accurate. JNU reserves the right to alter the
content whenever the need arises, and to vary it at any time without prior notice.
Index
I. Content..................................................................... II
Book at a Glance
I/JNU OLE
Contents
Chapter I........................................................................................................................................................ 1
Operation Management Concepts............................................................................................................... 1
Aim................................................................................................................................................................. 1
Objectives....................................................................................................................................................... 1
Learning outcome........................................................................................................................................... 1
1.1 Introduction . ............................................................................................................................................ 2
1.2 Operations System.................................................................................................................................... 2
1.3 A Framework of Managing Operations..................................................................................................... 2
1.4 Operations Management........................................................................................................................... 4
1.5 Transformation and Value Adding Activities............................................................................................ 5
1.6 Operations Management Objectives......................................................................................................... 5
1.7 Scope of Operations Management............................................................................................................ 6
Summary .................................................................................................................................................... 10
References.................................................................................................................................................... 10
Recommended Reading.............................................................................................................................. 10
Self Assessment.............................................................................................................................................11
Chapter II.................................................................................................................................................... 13
Production Processes, Manufacturing and Service Operations............................................................. 13
Aim............................................................................................................................................................... 13
Objectives..................................................................................................................................................... 13
Learning outcome......................................................................................................................................... 13
2.1 Introduction............................................................................................................................................. 14
2.2 Production Processes.............................................................................................................................. 14
2.3 Manufacturing Operations and Service Operations................................................................................ 14
2.3.1 Characteristics of Manufacturing............................................................................................ 16
2.3.2 Characteristics of Services...................................................................................................... 17
2.3.3 Challenges faced by Operations Managers............................................................................. 18
Summary...................................................................................................................................................... 20
References.................................................................................................................................................... 20
Recommended Reading.............................................................................................................................. 20
Self Assessment............................................................................................................................................ 21
Chapter III................................................................................................................................................... 23
Production, Planning and Control............................................................................................................ 23
Aim............................................................................................................................................................... 23
Objectives..................................................................................................................................................... 23
Learning outcome......................................................................................................................................... 23
3.1 Introduction............................................................................................................................................. 24
3.2 Objectives of Production Planning and Control..................................................................................... 25
3.3 Scope of Production Planning and Control............................................................................................. 25
3.4 Principles of Production Planning and Control...................................................................................... 26
3.5 Functions of Production Planning and Control....................................................................................... 26
3.6 Benefits of Production Planning and Control Function.......................................................................... 28
3.7 Limitations of Production Planning and Control Function..................................................................... 29
3.8 Production Planning and Control in Different Production System......................................................... 29
3.8.1 Factors Affecting the Choice of Manufacturing Process........................................................ 30
Summary...................................................................................................................................................... 31
References.................................................................................................................................................... 31
Recommended Reading.............................................................................................................................. 31
Self Assessment............................................................................................................................................ 32
II/JNU OLE
Chapter IV................................................................................................................................................... 34
Long Range Capacity Planning and Facility Location............................................................................ 34
Aim............................................................................................................................................................... 34
Objectives..................................................................................................................................................... 34
Learning outcome......................................................................................................................................... 34
4.1 Introduction............................................................................................................................................. 35
4.2 Long Range Capacity Planning.............................................................................................................. 36
4.3 Estimating the Capacities of Existing Facilities..................................................................................... 36
4.4 Forecasting Long-term Future Capacity Demand................................................................................... 38
4.5 Identifying and Analysing Sources of Capacity to Meet Future Capacity Needs................................... 39
4.6 Capacity Management............................................................................................................................ 39
4.7 Selecting from among the Alternative Sources of Capacity................................................................... 40
4.8 Facility Location..................................................................................................................................... 43
4.9 Steps in Location Selection..................................................................................................................... 43
4.9.1 Domestic or International Location ....................................................................................... 43
4.9.2 Selection of region.................................................................................................................. 43
4.9.3 Selection of community.......................................................................................................... 45
4.9.4 Selection of Site...................................................................................................................... 46
4.10 Errors in Selection................................................................................................................................. 46
4.11 Importance of Location Factors............................................................................................................ 47
4.12 Location Models................................................................................................................................... 48
Summary...................................................................................................................................................... 49
References.................................................................................................................................................... 49
Recommended Reading.............................................................................................................................. 49
Self Assessment............................................................................................................................................ 50
Chapter V..................................................................................................................................................... 52
Facility Layout............................................................................................................................................ 52
Aim............................................................................................................................................................... 52
Objectives..................................................................................................................................................... 52
Learning outcome......................................................................................................................................... 52
5.1 Introduction to Facility Layout............................................................................................................... 53
5.2 Inputs of the Layout................................................................................................................................ 53
5.3 Types of Layout...................................................................................................................................... 53
5.3.1 Process Layout/ Job Shop Layout........................................................................................... 53
5.3.2 Product Layout/ Flow Shop Layout........................................................................................ 54
5.3.3 Group Technology Layout...................................................................................................... 55
5.3.4 Fixed Position Layout............................................................................................................. 56
5.3.5 Flexible Manufacturing System.............................................................................................. 57
5.4 Layout Design Procedure........................................................................................................................ 57
5.5 Layout Problem....................................................................................................................................... 57
5.6 Importance of Facility Layout................................................................................................................ 60
Summary...................................................................................................................................................... 61
References.................................................................................................................................................... 61
Recommended Reading.............................................................................................................................. 61
Self Assessment............................................................................................................................................ 62
Chapter VI................................................................................................................................................... 64
Work System Design................................................................................................................................... 64
Aim............................................................................................................................................................... 64
Objectives..................................................................................................................................................... 64
Learning outcome......................................................................................................................................... 64
6.1 Introduction............................................................................................................................................. 65
6.2 Design of Work System.......................................................................................................................... 65
6.3 Different Terminologies in Work Design System................................................................................... 65
III/JNU OLE
6.4 Job Design............................................................................................................................................... 66
6.4.1 Factors that Affect Job Design................................................................................................ 66
6.5 Design of Work Systems......................................................................................................................... 66
6.5.1 Specialisation.......................................................................................................................... 66
6.5.2 Behavioral Approaches to Job Design.................................................................................... 66
6.5.3 Motivation............................................................................................................................... 66
6.5.4 Teams...................................................................................................................................... 67
6.5.5 Methods Analysis.................................................................................................................... 67
6.5.6 Motion Study.......................................................................................................................... 68
6.5.6.1 Motion Study Principles........................................................................................... 68
6.5.6.2 Analysis of Therbligs............................................................................................... 68
6.5.7 Working Conditions................................................................................................................ 69
6.6 Characteristics of Incentive Plan............................................................................................................ 70
6.7 Types of Individual Incentive Plans........................................................................................................ 70
Summary...................................................................................................................................................... 71
References.................................................................................................................................................... 71
Recommended Reading.............................................................................................................................. 71
Self Assessment............................................................................................................................................ 72
Chapter VII................................................................................................................................................. 74
Quality Management.................................................................................................................................. 74
Aim............................................................................................................................................................... 74
Objectives..................................................................................................................................................... 74
Learning outcome......................................................................................................................................... 74
7.1 Introduction............................................................................................................................................. 75
7.2 Definition of Total Quality Management................................................................................................ 75
7.2.1 Defining Quality..................................................................................................................... 75
7.3 Cost of Quality........................................................................................................................................ 75
7.4 Continuous Improvement (Kaizen)......................................................................................................... 77
7.4.1 Plan to Study Cycle................................................................................................................. 77
7.4.2 Benchmarking......................................................................................................................... 78
7.5 Employee Empowerment........................................................................................................................ 79
7.5.1 Team Approach....................................................................................................................... 79
7.6 Tools of Quality Control......................................................................................................................... 79
7.6.1 Cause-and-Effect Diagrams.................................................................................................... 80
7.6.2 Flowcharts............................................................................................................................... 80
7.6.3 Checklists................................................................................................................................ 80
7.6.4 Control Charts......................................................................................................................... 80
7.6.5 Scatter Diagrams..................................................................................................................... 81
7.6.6 Pareto Analysis....................................................................................................................... 81
7.6.7 Histograms.............................................................................................................................. 81
7.7 Process Management.............................................................................................................................. 82
7.8 Quality Standards.................................................................................................................................... 82
7.8.1 ISO 9000 Standards................................................................................................................ 82
7.8.2 ISO 14000 Standards.............................................................................................................. 83
7.9 Reason for TQM Failure......................................................................................................................... 83
Summary...................................................................................................................................................... 85
References.................................................................................................................................................... 85
Recommended Reading.............................................................................................................................. 85
Self Assessment............................................................................................................................................ 86
IV/JNU OLE
Chapter VIII................................................................................................................................................ 88
Project Planning and Work Breakdown Structure.................................................................................. 88
Aim............................................................................................................................................................... 88
Objectives..................................................................................................................................................... 88
Learning outcome......................................................................................................................................... 88
8.1 Introduction............................................................................................................................................. 89
8.2 Project Management Knowledge Areas.................................................................................................. 89
8.3 Project Failure......................................................................................................................................... 90
8.4 Project Planning...................................................................................................................................... 90
8.4.1 Scoping................................................................................................................................... 90
8.4.2 A Typical Outline of the Task................................................................................................. 91
8.4.3 Tasks Involved in Scoping...................................................................................................... 91
8.5 Project Plan............................................................................................................................................. 91
8.5.1 Planning Tools........................................................................................................................ 91
8.6 Project Process Flow............................................................................................................................... 92
8.6.1 Project Process........................................................................................................................ 92
8.6.2 Process Groups....................................................................................................................... 92
8.7 Work Breakdown Structure (WBS)........................................................................................................ 94
Summary...................................................................................................................................................... 95
References.................................................................................................................................................... 95
Recommended Reading.............................................................................................................................. 95
Self Assessment............................................................................................................................................ 96
Chapter IX................................................................................................................................................... 98
JIT, Lean Manufacturing, Six-Sigma........................................................................................................ 98
Aim............................................................................................................................................................... 98
Objectives..................................................................................................................................................... 98
Learning outcome......................................................................................................................................... 98
9.1 Introduction............................................................................................................................................. 99
9.2 History and Philosophy of Just-In-Time (JIT)........................................................................................ 99
9.3 Just-In-Time Concept.............................................................................................................................. 99
9.4 Benefits and Problems.......................................................................................................................... 100
9.5 Implementation of JIT........................................................................................................................... 101
9.6 Lean Manufacturing.............................................................................................................................. 103
9.6.1 Lean Production.................................................................................................................... 103
9.6.2 Lean Production Overview................................................................................................... 104
9.6.3 Basic Elements of Lean Manufacturing................................................................................ 104
9.6.4 Characteristics of a Lean Enterprise..................................................................................... 104
9.7 Key Feature of Lean Production........................................................................................................... 105
9.8 Benefits of Lean Production................................................................................................................. 105
9.9 Five Elements to Enabling Approach................................................................................................... 105
9.10 13 Tips to Transition Company into Lean Enterprise......................................................................... 106
9.11 Six-Sigma............................................................................................................................................ 106
9.11.1 Objectives of Six-Sigma..................................................................................................... 106
9.11.2 Integrating Six Sigma with Business Process Management............................................... 106
9.11.3 Six Main Benefits of the Sigma Breakthrough Strategy..................................................... 107
9.11.4 Difference between TQM and Six Sigma........................................................................... 107
9.11.5 Critical Success Factors of an Organisation....................................................................... 107
Summary.................................................................................................................................................... 109
References.................................................................................................................................................. 109
Recommended Reading.............................................................................................................................110
Self Assessment...........................................................................................................................................111
V/JNU OLE
List of Figures
Fig. 1.1 Operations system for stores department........................................................................................... 2
Fig. 1.2 General model for managing operations........................................................................................... 3
Fig. 1.3 Schematic model for operations/production system.......................................................................... 5
Fig. 1.4 Environment of operations................................................................................................................ 7
Fig. 2.1 Examples of tangible and intangible goods/services....................................................................... 15
Fig. 3.1 Three stages in PPC......................................................................................................................... 24
Fig. 3.2 Functions of production planning and control................................................................................. 26
Fig. 4.1 Determinants of effective capacity.................................................................................................. 38
Fig. 5.1 Job shop layout................................................................................................................................ 54
Fig. 5.2 Flow shop layout............................................................................................................................. 55
Fig. 5.3 Group technology layout................................................................................................................. 56
Fig. 5.4 Fixed position layout....................................................................................................................... 56
Fig. 5.5 A layout of departments................................................................................................................... 58
Fig. 5.6 From to matrix for the office example............................................................................................. 58
Fig. 5.7 Computation of the total distance travelled..................................................................................... 59
Fig. 6.1 Terminologies in work design system............................................................................................. 65
Fig. 7.1 Cost of defects................................................................................................................................. 77
Fig. 7.2 PDSA cycle...................................................................................................................................... 78
Fig. 7.3 Seven tools of quality control.......................................................................................................... 82
Fig. 8.1 Project management knowledge areas............................................................................................. 89
Fig. 8.2 Connection between process groups in a phase............................................................................... 93
Fig. 8.3 Schematic flow diagram of the processes........................................................................................ 94
Fig. 9.1 Drawing of the JIT concept........................................................................................................... 100
Fig. 9.2 Algorithm of JIT implementation.................................................................................................. 103
VI/JNU OLE
List of Tables
Table 1.1 Aspects of customer service............................................................................................................ 6
Table 1.2 The objectives of operations management...................................................................................... 6
Table 2.1 Difference between manufacturing operations and service operations......................................... 16
Table 2.2 Characteristics of Manufacturing.................................................................................................. 17
Table 3.1 Tabular representation of different levels of production planning system.................................... 28
Table 4.1 Example of capacity measure....................................................................................................... 35
Table 7.1 Cost of quality............................................................................................................................... 76
Table 9.1 Comparison between flexible systems and buffered/rigid systems............................................ 101
VII/JNU OLE
Abbreviations
BOM - Bill of Materials
BPR - Business Process Re-engineering
CAD - Computer Aided Design
CAM - Computer Aided Manufacturing
CRM - Customer Relationship Management
CRP - Capacity Requirement Planning
DFSS - Design for Six Sigma
DMAIC - Define, Measure, Analyse, Improve, Control
DRP - Distribution Requirement Planning
ETM - Enterprise Transaction Module
ERP - Enterprise Resource Planning
EV - Expected Value
FC - Fixed Costs
FCS - Finite Capacity Scheduling
FMS - Flexible Manufacturing System
GDP - Gross Domestic Product
ICT - Information and Communication Technologies
ISO - International Organisation for Standardisation
JIT - Just-In-Time
LCL - Lower Control Limit
MO - Manufacturing Operations
MPS - Master Production Schedule
MRP - Materials Requirement Planning
MTM - Methods Time Measurement
OM - Operations Management
OR - Operational Research
PDSA - Plan Do Study Act
PPC - Production Planning Control
QFD - Quality Function Deployment
RDB - Rational Database
SCM - Supply Chain Management
SFC - Shop Floor Control
SO - Service Operations
TC - Total Cost
TPS - Toyota Production System
TQM - Total Quality Management
UCL - Upper Control Limit
VC - Variable Cost
WBS - Work Breakdown Structure
VIII/JNU OLE
Chapter I
Operation Management Concepts
Aim
The aim of this chapter is to:
Objectives
The objectives of this chapter are to:
• elucidate activities, which are listed under production and operations management functio
Learning outcome
At the end of this chapter, you will be able to:
1/JNU OLE
Operation Management
1.1 Introduction
Operation is that part of as organisation, which is concerned with the transformation of a range of inputs into the
required output (services) having the requisite quality level. Management is the process, which combines and
transforms various resources used in the operations subsystem of the organisation into value added services in a
controlled manner as per the policies of the organisation.
The set of interrelated management activities, which are involved in manufacturing certain products, is called as
production management. If the same concept is extended to services management, then the corresponding set of
management activities is called as operations management.
Operations system converts inputs in order to provide outputs, which are required by a customer. It converts
physical resources into outputs, the function of which is to satisfy customer wants. Everett E. Adam & Ronald J.
Ebert defines as ‘An operating system is the part of an organisation that produces the organistion’s physical goods
and services’. Ray Wild defines operations system as ‘a configuration of resources combined for the provision of
goods or services’.
In some of the organisation the product is a physical good (breakfast in hotels) while in others it is a service (treatment
in hospitals). Bus and taxi services, tailors, hospital and builders are the examples of an operations system. The basic
elements of an operation system show in Fig. 1.3 with reference to departmental stores.
A departmental store’s has an input like land upon which the building is located, labour as a stock clerk, capital in
the form of building, equipment and merchandise, management skills in the form of the store’s manager. Output
will be serviced customer with desired merchandise. Random fluctuations will be from external or internal sources,
monitored through a feedback system
Random Fluctuations:
• Late delivery
Inputs • Labour turnover Outputs:
• Land Serviced customer with
• Labour Transformation process Merchandise
• Building
• Information
• Capital
Feedbacks
• Inventory levels
• Labour efficiency
• Sales volume
2/JNU OLE
and procedures for achieving the objectives. This stage includes clarifying the role and focus of operations in
the organisation’s overall strategy. It also involves product planning, facility designing and using the conversion
process.
Organising is the activities that establish a structure of tasks and authority. Operation managers establish a structure
of roles and the flow of information within the operations subsystem. They determine the activities required to
achieve the goals and assign authority and responsibility for carrying them out.
Controlling is the activities that assure the actual performance in accordance with planned performance. To ensure
that the plans for the operations subsystems are accomplished, the operations manager must exercise control by
measuring actual outputs and comparing them to planned operations management. Controlling costs, quality, and
schedules are the important functions here.
• Behaviour: Operations managers are concerned with the activities, which affect human behaviour through models.
They want to know the behaviour of subordinates, which affects managerial activities. Their main interest lies
in the decision-making behaviour.
• Models: Models represents schematic representation of the situation, which will be used as a tool for decision-
making. Following are some of the models used. Aggregate planning models for examining how best to use
existing capacity in short term, break-even analysis to identify break-even volumes, Linear programming and
computer simulation for capacity utilisation, Decision tree analysis for long-term capacity problem of facility
expansion, simple median model for determining best locations of facilities, etc.
Planning
Planning conversion system
• Operating strategies
• Forecasting Organising
• Product and process choices Organising conversion system
• Facility location planning
• Job design, production/
• Layout planning operations standardsd, work
Scheduling conversion system measurement
• Scheduling system and
Aggregate planning • Project management
• Operations scheduling
Conversion process
Models Behaviour
Control
Material control
• Inventory control
• Material requirement planning
Managing for world-class competition
• Japanese manufacturing
• Managing for quality
• Quality analysis and control
3/JNU OLE
Operation Management
The operations managers have the prime responsibility for processing inputs into outputs. They must bring together
under production plan that effectively uses the materials, capacity and knowledge available in the production facility.
Given a demand on the system work must be scheduled and controlled to produce goods and/or services required.
Control must be exercised over such parameters such as costs, quality and inventory levels.
The definition of the operations Management contains following keywords: Resources, Systems, transformation
and Value addition Activities.
Resources
Resources are the human, material and capital inputs to the production process. Human resources are the key assets
of an organisation. As the technology advances, a large proportion of human input is in planning and controlling
activities. By using the intellectual capabilities of people, managers can multiply the value of their employees into
by many times. Material resources are the physical facilities and materials such as plant equipment, inventories
and supplies. These are the major assets of an organisation. Capital in the form of stock, bonds, and/or taxes and
contributions is a vital asset. Capital is a store of value, which is used to regulate the flow of the other resources.
Systems
Systems are the arrangement of components designed to achieve objectives according to the plan. The business
systems are subsystem of large social systems. In turn, it contains subsystem such as ersonnel, engineering, finance
and operations, which will function for the good of the organisation.
A systems approach to operations management recognises the hierarchical management responsibilities. If subsystems
goals are pursued independently, it will results in sub-optimisation. A consistent and integrative approach will lead
to optimisation of overall system goals.
The system approach to specific problems requires that the problem first be identified and isolated from the maze of
the less relevant data that constitute the environment. The problem abstracted from the overall (macro) environment.
Then it can be broken into manageable (micro) parts and analysed and solutions proposed. Doing this analysis is
advantageous before making any changes. If the solution appears to solve the problem in a satisfactory way, changes
can be made to the real system in an orderly and predictable way.
The ability of any system to achieve its objective depends on its design and its control. System design is a predetermined
arrangement of components. It establishes the relationships that must exist between inputs, transformation activities
and outputs in order to achieve the system objectives. With the most structured design, there will be less planning
and decision-making in the operations of the system. System control consists of all actions necessary to ensure that
activities conform to preconceived plans or goals. It involves following four essential elements:
• Measurement by an accurate sensory device.
• Feedback of information in a timely manner.
• Comparison with standards such as time and cost standards.
• Corrective actions by someone with the authority and ability to correct.
A closed loop control system can automatically function on the basis of data from within its own system.
4/JNU OLE
1.5 Transformation and Value Adding Activities
The objective of combining resources under controlled conditions is to transform them into goods and services
having a higher value than the original inputs. The transformation process applied will be in the form of technology
to the inputs. The effectiveness of the production factors in the transformation process is known as productivity.
The productivity refers to the ratio between values of output per work hour to the cost of inputs. The firms overall
ratio must be greater than 1, then we can say value is added to the product. Operations manager should concentrate
improving the transformation efficiency and to increase the ratio.
Control
Customer service
The first objective of operating systems is to utilise resources for the satisfaction of customer wants. Therefore,
customer service is a key objective of operations management. The operating system must provide something to a
specification, which can satisfy the customer in terms of cost and timing. Thus, providing the ‘right thing at a right
price at the right time’ can satisfy primary objective. These aspects of customer service – specification, cost and
timing – are described for four functions in Table 1.1. They are the principal sources of customer satisfaction and
must therefore be the principal dimension of the customer service objective for operations managers.
Generally, an organisation will aim reliably and consistently to achieve certain standards and operations manager will
be influential in attempting to achieve these standards. Hence, this objective will influence the operations manager’s
decisions to achieve the required customer service.
5/JNU OLE
Operation Management
Resource utilisation
Another major objective of operating systems is to utilise resources for the satisfaction of customer wants effectively.
Customer service must be provided with the achievement of effective operations through efficient use of resources.
Inefficient use of resources or inadequate customer service leads to commercial failure of an operating system.
Operations management is concerned essentially with the utilisation of resources, i.e. obtaining maximum effect
from resources or minimising their loss, under utilisation or waste. The extent of the utilisation of the resources’
potential might be expressed in terms of the proportion of available time used or occupied, space utilisation, levels
of activity, etc. Each measure indicates the extent to which the potential or capacity of such resources is utilised.
This is referred as the objective of resource utilisation.
Operations management is concerned with the achievement of both satisfactory customer service and resource
utilisation. An improvement in one will often give rise to deterioration in the other. Often both cannot be maximised,
and hence a satisfactory performance must be achieved on both objectives. All the activities of operations management
must be tackled with these two objectives in mind, and because of this conflict, operations managers’ will face many
of the problems. Hence, operations managers must attempt to balance these basic objectives.
The Table 1.3 summarizes the twin objectives of operations management. The type of balance established both
between and within these basic objectives will be influenced by market considerations, competitions, the strengths
and weaknesses of the organisation, etc. Hence, the operations managers should make a contribution when these
objectives are set.
Following are the activities, which are listed under Production and Operations Management functions:
• Location of facilities.
• Plant layouts and Material Handling.
• Product Design.
• Process Design.
6/JNU OLE
• Production and Planning Control.
• Quality Control.
• Materials Management.
• Maintenance Management
Health and
Financial Resource Inventory safety State an local
Interest rate Income tax
markets availability tax regulations laws
Environmental Feedback
Location of facilities
Location of facilities for operations is a long-term capacity decision, which involves a long-term commitment about
the geographically static factors that affect a business organisation. It is an important strategic level decision-making
for an organisation. It deals with the questions such as ‘where our main operations should be based?’
The selection of location is a key-decision as large investment is made in building plant and machinery. An improper
location of plant may lead to waste of all the investments made in plant and machinery equipments. Hence, location
of plant should be based on the company’s expansion plan and policy, diversification plan for the products, changing
sources of raw materials and many other factors. The purpose of the location study is to find the optimal location
that will results in the greatest advantage to the organisation.
According to James More ‘Plant layout is a plan of an optimum arrangement of facilities including personnel,
operating equipment, storage space, material handling equipments and all other supporting services along with the
design of best structure to contain all these facilities’.
‘Material Handling’ refers to the ‘moving of materials from the store room to the machine and from one machine
to the next during the process of manufacture’. It is also defined as the ‘art and science of moving, packing and
storing of products in any form’. It is a specialised activity for a modern manufacturing concern, with 50 to 75% of
the cost of production. This cost can be reduced by proper section, operation and maintenance of material handling
7/JNU OLE
Operation Management
devices. Material handling devices increases the output, improves quality, speeds up the deliveries and decreases
the cost of production. Hence, material handling is a prime consideration in the designing new plant and several
existing plants.
Product design
Product design deals with conversion of ideas into reality. Every business organisation have to design, develop and
introduce new products as a survival and growth strategy. Developing the new products and launching them in the
market is the biggest challenge faced by the organisations. The entire process of need identification to physical
manufactures of product involves three functions— Design and Marketing, Product, Development, and manufacturing.
Product Development translates the needs of customers given by marketing into technical specifications and designing
the various features into the product to these specifications. Manufacturing has the responsibility of selecting the
processes by which the product can be manufactured. Product design and development provides link between
marketing, customer needs and expectations and the activities required to manufacture the product.
Process design
Process design is a macroscopic decision-making of an overall process route for converting the raw material into
finished goods. These decisions encompass the selection of a process, choice of technology, process flow analysis and
layout of the facilities. Hence, the important decisions in process design are to analyse the workflow for converting
raw material into finished product and to select the workstation for each included in the workflow.
Planning is deciding in advance what to do, how to do it, when to do it and who is to do it. Planning bridges the
gap from where we are, to where we want to go. It makes it possible for things to occur which would not otherwise
happen.
Routing may be defined as the selection of path, which each part of the product will follow, which being transformed
from raw material to finished products. Routing determines the most advantageous path to be followed for department
to department and machine to machine till raw material gets its final shape.
Scheduling determines the programme for the operations. Scheduling may be defined as ‘the fixation of time and
date for each operation’ as well as it determines the sequence of operations to be followed.
Dispatching is concerned with the starting the processes. It gives necessary authority so as to start a particular
work, which has been already been planned under ‘Routing’ and ‘Scheduling’. Therefore, dispatching is ‘Release
of orders and instruction for the starting of production for any item in acceptance with the Route sheet and Schedule
Charts’.
The function of Follow-up is to report daily the progress of work in each shop in a prescribed proforma and to
investigate the causes of deviations from the planned performance.
8/JNU OLE
The main objectives of Quality Control are:
• To improve the companies income by making the production more acceptable to the customers i.e. by providing
long life, greater usefulness, maintainability, etc.
• To reduce companies cost through reduction of losses due to defects.
• To achieve interchangeability of manufacture in large-scale production.
• To produce optimal quality at reduced price.
• To ensure satisfaction of customers with productions or services or high quality level, to build customer good
will, confidence and reputation of manufacturer.
• To make inspection prompt to ensure quality control.
• To check the variation during manufacturing.
Materials management
Materials Management is that aspect of management function, which is primarily concerned with the acquisition,
control, and use of materials needed and flow of goods and services connected with the production process having
some predetermined objectives in view.
Maintenance management
In modern industry, equipment and machinery are a very important part of the total productive effort. Therefore
their idleness or downtime becomes are very expensive. Hence, it is very important that the plant machinery should
be properly maintained.
9/JNU OLE
Operation Management
Summary
• Operation is that part of as organisation, which is concerned with the transformation of a range of inputs into
the required output (services) having the requisite quality level.
• An operation was defined in terms of the mission it serves for the organisation, technology it employs and the
human and managerial processes it involves.
• Operations in an organisation can be categorised into manufacturing operations and service operations.
• Operation managers are concerned with planning, organising, and controlling the activities, which affect human
behaviour through models.
• Planning is the activity that establishes a course of action and guide future decision-making.
• Organising is the activities that establish a structure of tasks and authority.
• Controlling is the activities that assure the actual performance in accordance with planned performance.
• Joseph G .Monks defines Operations Management as the process whereby resources, flowing within a defined
system, are combined and transformed by a controlled manner to add value in accordance with policies
communicated by management.
• Operations Management concern with the conversion of inputs into outputs, using physical resources, so as to
provide the desired utilities to the customer while meeting the other organisational objectives of effectiveness,
efficiency and adoptability.
References
• Kumar, S. A. & Suresh, N., Operations Management, [Pdf] Available at: <http://tn.upi.edu/pdf/Operations_
Management.pdf>[Accessed 21 June 2013].
• Introduction to Product and Operations Management [Pdf] Available at: <http://www.newagepublishers.com/
samplechapter/001233.pdf> [Accessed 11 November 2010].
• 2012. Introduction to Operations Management 1, [Video online] Available at: <http://www.youtube.com/
watch?v=skg_lg-4m2o> [Accessed 21 August 2012].
• 2009. Operations Management, [Video online] Available at: <http://www.youtube.com/watch?v=O1U12X-hu
sI&playnext=1&list=PL6986AF89EBEBDEA1&feature=results_video> [Accessed 21 August 2012].
• Aswathappa, K. & Bhat, K. S., 2010. Production and Operations Management, Introduction to Operations
Management, 2nd ed., Himalaya Publishing House,
• Shim, J. K. & Siegel, J. G., 1999. Operations Management, Scope of Operations Management, 1st ed.,
Barrons Education Series Inc.
Recommended Reading
• Krajewski, L., Ritzman, L. P. & Malhotra, M, K., 2009. Operations Management: Process and Supply Chain,
Operations Management, Prentice Hall Publication.
• Murthy, P. R., 2006. Production and Operations Management, Introduction to Operations Management, 2nd ed.,
New Age International Publishers.
• Gaither, N. & Fraizer, G., 2002. Operations Management-Overview, 9th ed., Thompson Learning
10/JNU OLE
Self Assessment
1. _______________ is the process, which combines and transforms various resources used in the operations
subsystem of the organisation into value added services in a controlled manner as per the policies of the
organisation.
a. Management
b. Business
c. Strategy
d. Economics
2. The set of interrelated management activities, which are involved in manufacturing certain products, is called
as _______________ management.
a. cost
b. operation
c. planning
d. production
4. ______________ is the activity that establishes a course of action and guide future decision-making.
a. Scheduling
b. Controlling
c. Planning
d. Organising
5. Which of the following are the activities that establish a structure of tasks and authority?
a. Scheduling
b. Controlling
c. Planning
d. Organising
6. _______________ is the activities that assure the actual performance in accordance with planned
performance.
a. Controlling
b. Scheduling
c. Planning
d. Organising
11/JNU OLE
Operation Management
7. Resources are the human, material and capital inputs to the ____________ process.
a. production
b. manufacturing
c. operation
d. control
8. ________________ are the arrangement of components designed to achieve objectives according to the plan.
a. Process
b. Facilities
c. Systems
d. Resources
9. _________________ management is concerned with the achievement of both satisfactory customer service
and resource utilisation.
a. Operations
b. Production
c. Financial
d. Resource
12/JNU OLE
Chapter II
Production Processes, Manufacturing and Service Operations
Aim
The aim of this chapter is to:
• introduce the terms ‘production process’, ‘manufacturing operations’ and ‘service operations’
Objectives
The objectives of this chapter are to:
Learning outcome
At the end of this chapter, you will be able to:
13/JNU OLE
Operation Management
2.1 Introduction
The way that businesses create products and services is known as the production process. A firm must purchase all
the necessary inputs and then transform them into the product (outputs) that it wishes to sell. For instance, a football
shirt manufacturer must buy the fabric, pay someone for a design, invest in machinery, rent a factory and employ
workers in order for the football shirts to be made and then sold.
How well-organised a firm is at undertaking transformation process will determine its success is known as the
productive efficiency of a firm and it will want to be as efficient as possible in transforming its inputs into outputs
(i.e., using the minimum number of inputs as possible to achieve a set amount of output), this will reduce the cost
per unit of production and allow the firm to sell at a lower price.
Ultimately, the objective of the production process is to create goods and services that meet the needs and wants
of customers.
The needs and wants of customers will be met if a business can produce the correct number of products, in the
shortest possible time, to the best quality and all at a competitive price.
Production processes are essential to produce products and the available processes limit what products can be
produced.
Production or operations function of an industrial enterprise is also known as conversion process or transformation
process which transforms some of the inputs into outputs which are useful for the consumers.
Manufacturing operations: Manufacturing operations or processes convert inputs into tangible outputs.
Manufacturing processes are primary processes and can be grouped under three basic categories, viz., forming,
Machining and Assembly. Forming includes casting, forging, stamping, embossing, spinning etc. Machining includes
metal removal by turning, drilling, milling, grinding, shaping, boring etc, it also includes chip less machining processes
such as electro discharge machining (EDM), electromechanical machining (ECM), chemical milling, laser drilling
etc. Assembly processes includes joining of parts, i.e., welding, riveting, fastening with bolts and nuts and joining
by use of adhesive. Objectives of Manufacturing Operations are as follows:
• To give tools and advices for establishing manufacturing processes
• To show some alternative methods for reducing the cost of the manufacturing process
• To show how to estimate manufacturing cost and running cost of any manufacturing process
Operation 1
Raw materials: Collect and store the raw materials: Scrap or sponge iron: Where we get it, at what price, how do we
store it, what quality is usually needed, how many people do we put on this task: Salary, outsourcing, qualifications,
safety regulations and so on.
Operation 2
Melting: Sponge iron is melt in an electric arc furnace: What is the cost of the furnace, where do we implement it,
What is the cost of the energy, how many people on this work station, how many quantities can we manage in one
hour and how many quantities do we get by the end?
14/JNU OLE
Operation 3
Refining: The melting metal is refined. It means that we separate the chemical elements in order to get the specific
steel we need. How do we operate this separation, qualifications wanted, Do we need a chemist for controlling the
process?
Operation 4
Casting: The liquid steel is cast in products such as billets: A new list of questions
Operation 5
Rolling: The billets are heated at 1200c and then rolled in order to get the plates: A new list of question
Service operations: Service operations or non manufacturing operations which also convert set of inputs into set
of outputs which are intangible. It can be classified into standard services and custom services according to degree
of standardisation of their outputs and /or the processes they perform, such as wholesale distribution and freight
transportation etc. An operation does not necessarily provide only service or only goods. Facilitating goods may be
provided with services and facilitating services may be provided with goods, for example, Servicing automobiles
may include the replacement of some parts.
15/JNU OLE
Operation Management
Less customer contact with person who is involved Customers have more contact with persons who
in manufacturing process. provide services. In continuous production of
standard products, it can accumulate or decrease
inventory of finished products.
In service operations, it can not produce outputs
that can be stored because they are intangible in
nature.
The proportion of expenses required for material The proportion of expenses in services operations
handling is more. is very less.
Investment in assets such as facilities, equipments Investment in assets and inventory is less as
and inventory are higher. compared to manufacturing operations.
These are depending more heavily on maintenance In service operations the maintenance is not
and repair works. required as the services are intangible.
MO having longer lead times. SO having shorter lead times.
These are capital intensive These are labor intensive
16/JNU OLE
Specialisation Mechanisation Use of Use of Use of Scientific
Technology Computers and Methods
of Industrial Data Processing
Engineering Equipments
Specialisation Mechanisation Industrial Widespread use Industrial
means division of replaces human labor engineers of computers in engineering,
work or effort and by machine power. have been manufacturing operations
this operates both The human skill able to devise industries has research or
at workers and is transferred to improvements made possible, management
management level. machine tools which and to the handling science involves
The result of carryout various increase of enormous quantitative
specialization is low manufacturing productivity amounts of data methods and
cost of production operations. by and the solving techniques
and improved Advanced form of elimination of complex to solve both
quality. mechanization is of waste and mathematical engineering
At management known as Automation inefficiency, problems at high and managerial
level the efforts are thereby speed. problems.
divided into various increasing The range of Operations
special functions production application of research is an
such as Research and and reducing application aid in decision
development design, costs. of computers making based
engineering, finance, include product on quantitative
accounting, sales, design, control analysis.
purchase, personnel, of manufacturing
maintenance etc process,
production and
inventory control,
quality control,
maintenance
control etc.
Perishability
It means the service cannot be inventoried or stored. Most services, because they are simultaneously produced and
consumed are considered as perishable. e.g. Hotel rooms, seats on an airplane or in movie theatre cannot be stored
and retrieved for later use.
Inseparability
Inseparability refers to the simultaneous production and consumption of services. Goods can be produced and then
sold later whereas services cannot. They can consume only when they are produced.
Variability
Variability refers to the unwanted or random levels of service quality customers receive when they patronise a
service because of the human element involved in providing a service.
17/JNU OLE
Operation Management
Various service employees will perform the same service differently and even the same service employee will
provide varying levels form one time to another.
18/JNU OLE
Encouraging innovations
Innovation looks for what is new rather than improving the existing service operations usually require elements of
financial risk because innovations require time and money and personal risk for service managers champion change
putting their reputation on the line.
19/JNU OLE
Operation Management
Summary
• Products are goods and services produced and processes are the facilities, skills and technologies used to
produce them.
• The objective of the production process is to create goods and services that meet the needs and wants of
customers.
• Manufacturing operations or processes convert inputs into tangible outputs.
• Forming includes casting, forging, stamping, embossing, spinning etc.
• Machining includes metal removal by turning, drilling, milling, grinding, shaping, boring etc, it also includes
chipless machining processes such as electro discharge machining (EDM), electromechanical machining (ECM),
chemical milling, laser drilling etc
• The Production operations are divided in manufacturing and service operations.
• In every organisation the operation manager facing some difficulties and challenges in front of him to achieve
an organisations goal.
References
• Aswathappa, K., 2010. Production and Operations management- Manufacturing and Service operations,
Himalaya publishing House.
• Kumar, A. S., 2006. Production and Operations Management-Introduction to Production and Operations
Management, New Age International.
• New Age International,1966. Introduction to Product and Operations Management [pdf] Available at: <http://
www.newagepublishers.com/samplechapter/001233.pdf> [Accessed 11 November 2010].
• Tutor2u, Introduction to POM [Online] Available at: <http://tutor2u.net/business/production/pom_introduction.
html> [Accessed 11 November 2010].
• 2009. Should Manufacturers Adopt a Service led Competitive Strategy? [Video Online] Available at: <http://
www.youtube.com/watch?v=j_bYoFlncG8> [Accessed 22 August 2012].
• 2009. Manufacturing Support and Services - Lean, workflow, efficiency, automation [Video online] Available
at: <http://www.youtube.com/watch?v=soF07jUhmBg> [Accessed 22 August 2012].
Recommended Reading
• Arora, K. C., 2004. Production and Operations Management, Service Operations, Firewall Media.
• Kolli, S., Essentials of Production and Operations Management, Research and entertainment Association.
• AN International journal of the Production and Operations Management, POM Journal
20/JNU OLE
Self Assessment
1. The ultimate objective of __________is to create goods and services that meets the needs and wants of the
customers.
a. manufacturing
b. production process
c. service operation
d. transformation
3. In manufacturing process, __________ includes metal removal by turning, drilling, milling, grinding,
shaping,boring.
a. assembling
b. forming
c. machining
d. deforming
4. 0_______ means division of work or effort and this operates both, at workers and management level.
a. Specialisation
b. Mechanisation
c. Transformation
d. Operation
6. The unwanted or random levels of service quality customers receive when they patronise a service because of
the human element involved in providing a service is known as___________.
a. inseparability
b. variability
c. perishability
d. uniformity
21/JNU OLE
Operation Management
22/JNU OLE
Chapter III
Production, Planning and Control
Aim
The aim of this chapter is to:
Objectives
The objectives of this chapter are to:
Learning outcome
At the end of this chapter, you will be able to:
23/JNU OLE
Operation Management
3.1 Introduction
Production consists of a sequence of operations that transforms materials from a given form to a desired form
(products). The highest efficiency in production is obtained by manufacturing the required quantity of products of
the required quality, at the required time, by the best and cheapest method. To achieve this objective, production
management employs production planning and control function which is a management tool that coordinates all
manufacturing activities. The four factors, viz., Quantity, Quality, Time and Cost encompasses the production system
of which production planning and control is the nerve centre or brain.
Planning
Pre-planning
& Active
planning
Action Control
Hence, Production, Planning and Control may be defined as the planning, direction and coordination of the firms
material and physical facilities towards the attainment of predetermined production objectives in the most economical
manner. Production, planning and control (PPC) is referred to as operations planning and control because the
production planning and control techniques used in production systems manufacturing tangible goods can also be
employed in operations or services systems providing services. Production/operation planning and control involves
the organisation and control of an overall manufacturing system to produce a product (or a service).
24/JNU OLE
3.2 Objectives of Production Planning and Control
PPC function essentially consist of planning production in a manufacturing organisation before actual production
activities start and exercising control activities to ensure that the planned production is realised in terms of quantity,
quality, delivery schedule and cost of production. Objectives of PPC are to deliver quality goods in required quantities
to the customer in the required delivery schedule to achieve maximum customer satisfaction and minimum possible
cost
• To ensure maximum utilisation of all resources
• To ensure production of quality products
• To minimise the product through put time or production/manufacturing cycle time
• To maintain optimum inventory levels
• To maintain flexibility in manufacturing operations
• To co-ordinate between labor machines and various supporting departments
• To plan for capacities between labor and machines and various supporting departments
• To plan for plant capacities for future requirements
• To ensure effective cost reduction and cost control
• To prepare production schedules and ensure that promised delivery dates are met
• To produce effective results for least total cost
• The ultimate objective is to contribute to profit of the enterprise
25/JNU OLE
Operation Management
• Expediting: It means chasing, follow up or progressing which is down after dispatching function. It keeps a close
liaison with scheduling in order to provide an efficient feedback and prompt review of targets and schedules.
• Inspection: This function is related to maintenance of quality in production and of evaluating the efficiency
of the processes, methods and labor so that improvements can be made to achieve the quality standards set by
product design.
• Evaluating: The objective of evaluation is to improve performance. Performance of machines, processes and
labor is evaluated to improve the same.
• Cost Control: Manufacturing cost is controlled by wastage reduction, value analysis, inventory control and
efficient utilization of all resources.
Estimating
• It involves deciding the quality of products to be produced and cost involves in it on the basis of sales
forecast.
• Estimating manpower, machine capacity and materials required to meet the planned production targets are the
key activities before budgeting for resources.
26/JNU OLE
Routing
• This is the process of determining the sequence of operations to be performed in the production process. Routing
determines what work must be done, where and how?
• Routing information is provided by product or process engineering function and it is useful to prepare machine
loading charts and schedules.
• Route sheets: These are the documents providing information and instruction for converting the raw materials
into finished products.
Scheduling
• It involves fixing priorities for each job and determining the starting time and finishing time for each operation,
the starting dates and finishing dates for each part, sub assembly and final assembly.
• Scheduling lays down a time table for production indicating the total time required for the manufacture of a
product and also the time required for carrying out the operation for each part on each machine or equipment.
Loading
• Facility loading means loading of facility or work centre and deciding which jobs to be assigned to which work
centre or machine. Loading is the process of converting operation schedules into practice.
• Machine loading is the process of assigning specific jobs to machines, men or work centers based in relative
priorities and capacity utilization.
• A machine loading chart is prepared showing the planned utilization of men and machines by allocating the jobs
to machines or workers as per priority sequencing established at the time of scheduling.
Follow up
• Expediting or progressing ensures that the work is carried out as per plan and delivery scheduling are met.
• Progressing includes activities such as status reporting, attending to bottlenecks or holdups in production and
removing the same, controlling variation and deviations from planned performance levels, following up and
monitoring progress of work through all stages of production, coordinating with purchase, stores, tool room
and maintenance departments and modifying the production plans and re-plan if necessary.In short, production
planning and control function is concerned with decision making regarding:
What to produce: product planning and development includes product design.
How to produce: process planning, material planning, tool planning etc.
Where to produce: facilities planning, capacity planning and sub contracting planning.
When to produce: production scheduling and machine loading.
Who will produce: man power planning.
How much to produce: Planning for quantity, economic batch size etc.
27/JNU OLE
Operation Management
28/JNU OLE
3.7 Limitations of Production Planning and Control Function
Following are the limitations of production planning and control function
• PPC function is based on certain assumptions or forecasts of customers’ demand plant capacity, availability of
materials; power etc. if these assumptions go wrong, PPC becomes ineffective.
• Employees may resist changes is production levels set as per production plans if such plans are rigid.
• The production planning process is time consuming when it is necessary to carry out routing and scheduling
functions for large and complex products consisting of a large no of parts going into the product.
• PPC function becomes extremely difficult when the environmental factors change very rapidly such as technology,
customers taste regarding fashion or style of products needed, government policy and controls change frequently,
stoppages of power supply by electricity boards due to power cuts, break in supply chain due to natural calamities
such as floods, earthquakes, war etc.
29/JNU OLE
Operation Management
Two types of continuous production can be Mass production and Flow production.
• In Mass production, a large number of identical articles is produced, but in spite of advanced mechanization
and tooling, the equipment need not be specially designed for the component to be manufactured.
• In Flow production, the plant and equipment and layout have been primarily designed to manufacture a particular
product.
A decision to switch over to a different kind of product needs basic changes in the equipments and the layout,
especially when special purpose machines and complex material handling systems are used. PPC in continuous
production is usually simpler than in job or batch production. The output is either limited by available capacity or
regulated within given limits to conform to production targets based on periodic sales forecasts.
Effect of volume/variety: this is one of the major considerations in selection of manufacturing process. When the
volume is low and variety is high, intermittent process is most suitable and with increase in volume and reduction
in variety continuous process become suitable. The following figure indicates the choice of process as a function of
repetitiveness. Degree of repetitiveness is determined by dividing volume of goods by variety.
Capacity of the plant: Projected sales volume is the key factor to make a choice between batch and line process. In
case of line process, fixed costs are substantially higher than variable costs. The reverse is true for batch process
thus at low volume it would be cheaper to install and maintain a batch process and line process becomes economical
at higher volumes.
Lead time: The continuous process normally yields faster deliveries as compared to batch process. Therefore lead-
time and level of competition certainly influence the choice of production process.
Flexibility and efficiency: The manufacturing process needs to be flexible enough to adapt contemplated changes
and volume of production should be large enough to lower costs.
30/JNU OLE
Summary
• Production, planning and control (PPC) is referred to as operations planning and control because the production
planning and control techniques used in production systems manufacturing tangible goods can also be employed
in operations or services systems providing services.
• Three stages in production planning and control functions are:
• Planning: Choosing the best course of action among several alternatives.
• Operations: Execution as per plan.
• Control: Maintaining the performance by comparing the actual results with performance standards set and taking
appropriate corrective action if necessary to reduce variance.
• There are 3 phases of PPC that is Planning, Action and Control.
• The control functions are Dispatch and Follow up.
References
• Aswathappa, K., 2010. Production and Operations management- Production Planning Control, Himalaya
publishing House.
• Kumar, A. S., 2006. Production and Operations Management-Production, Planning and Control, New Age
International.
• Tutor2u, Introduction to POM [Online] Available at: <http://tutor2u.net/business/production/pom_introduction.
html> [Accessed 11 November 2010].
• Stephen, C, G., 1999. Manufacturing Planning and Control [Online] Available at: <http://web.mit.edu/sgraves/
www/ProdPlanCh.PDF> [Accessed 15 November 2010].
• 2008. Production Planning and Control [Video online] Available at: < http://www.youtube.com/
watch?v=b143Y7dTfIA> [Accessed 24 August 2012]
• 2008. Role of Models in Production Management [Video online] Available at: <http://www.youtube.com/
watch?v=-Hba1hraPlY> [Accessed 24 August 2012]
Recommended Reading
• Everette, A. E, Jr. & Ebert, R. J., 2003. Production and Operations Management - Concepts Models and
Behaviour, New Delhi: Pearson Education.
• Buffa, E. S., 1988. Modern Production Management, New Delhi: Wily.
• Charantimath, P., 2003. Total Quality Management, Pearson Education, New Delhi.
31/JNU OLE
Operation Management
Self Assessment
1. ________ is a sequence of an operation that transforms materials from a given form to a desired form
(products).
a. Operation
b. Transformation
c. Production
d. Control
2. Determining a flow of work material handling in the part, and sequence of operation or processing steps is
known as, _________ .
a. estimating
b. loading
c. scheduling
d. routing
3. _______ means chasing, follow up or progressing which is down after dispatching function.
a. Scheduling
b. Routing
c. Expediting
d. Loading
4. ________ is concerned with the execution of the planning functions; it gives necessary authority to start a
particular work which has already been planned under routing and scheduling functions.
a. Dispatching
b. Expediting
c. Evaluating
d. Routing
5. ________function is related to maintenance of quality in production and of evaluating the efficiency of the
processes, methods and labor so that improvements can be made to achieve the quality standards set by product
design.
a. Expediting
b. Evaluating
c. Routing
d. Inspection
6. Which of the following is related to consideration of appropriate shop layout and plant layout, temporary storage
locations for raw materials, components and semi finished goods and of materials handling system?
a. Routing
b. Estimating
c. Loading
d. Scheduling
32/JNU OLE
7. This involves planning for quantity, determination of product, mix routing, scheduling, material planning,
process planning, capacity planning and tool planning.
a. Pre-planning
b. Active planning
c. Control phase
d. Action phase
8. Master Production Schedules (MPS), Capacity Requirement Planning (CRP), Material Requirement Planning
(MRP) considered in which level of production system.
a. Short range level planning
b. Intermediate range planning
c. Long range planning
d. Mid-range planning
9. In production control function, the setting production activities in motion through the release of orders and
instructions in accordance with the previously planned time schedules and routings.
a. Expediting
b. Dispatching
c. Loading
d. Scheduling
10. Which of the following is the type of production in which, limited quantities of each of the different types of
products are manufactured on same set of machines?
a. Continuous
b. Batch
c. Job
d. Process
33/JNU OLE
Operation Management
Chapter IV
Long Range Capacity Planning and Facility Location
Aim
The aim of this chapter is to:
• introduce the idea of long range capacity planning and facility location
• define capacity and capacity planning, short range, intermediate range and long range planning
Objectives
The objectives of this chapter are to:
Learning outcome
At the end of this chapter, you will be able to:
34/JNU OLE
4.1 Introduction
Capacity is known as the amount of output, that a system is capable over a specific period of time. Capacity is the
upper limit or ceiling on the load that an operating unit can handle. Examples of Capacity measures:
Type of Organisation Measures of Capacity
Inputs Outputs
Capacity planning is the process of determining the production capacity needed by an organisation to meet changing
demands for its products. It is the process used to determine how much capacity is needed (and when) in order to
manufacture greater product or begin production of a new product. Capacity planning is central to the long term
success of an organisation. Capacity planning is generally viewed in terms of three time horizons or durations.
• Long Range Capacity Planning which is usually having a time horizon of more than one or two years. It is carried
out for productive resources which take a long time to acquire or dispose of such as buildings, equipment or
facilities such as machinery, materials handling equipments and transportation vehicles etc.
• Intermediate Range Capacity Planning which has a time horizon or duration for the next 6-18 months. The
intermediate range capacity may be varied by such alternatives such as hiring or laying off labour, purchasing
or making new tools and minor equipments and outsourcing/subcontracting etc.
• Short Range Planning which has a time horizon or duration of less than one month. This is concerned with
day to day planning such as daily scheduling of activities and machine loading or weekly scheduling process
which involves making adjustments to eliminate the variance between planned output and actual output. It is
concerned with overtime, transfer of personnel and changing the production routings.
A firm must live with its facility planning decisions for a long time, and these decisions affect:
• Operating efficiency.
• Economy of scale.
• Ease of scheduling.
• Maintenance costs.
• Profitability.
35/JNU OLE
Operation Management
Managers must evaluate and consider trade-offs of a number of factors while establishing a long term capacity plan
for their firms. Some of these factors are:
• Forecast growth in demand.
• Future upgrading of technology which may become necessary to gain competitive edge over others.
• Anticipated moves by competing firms.
• Reliance on learning curves without additional investment.
• Forecast of availability of funds for the future investments.
• The cost of new capacities and capacities which can provide economies of scale.
Capacity decisions have long term effects on many aspects of the business. Finance is affected because of the influence
of capacity decisions on the level of capital investment and return on that investment. Production affected because
capacity sets constraints within which operations must work to meet its objective of producing high quality goods
or services at competitive cost and lead times.
Long range capacity decisions made in early years determine the current level of capital assets such as buildings
machinery and equipments of the firm.
Production capacity
It is the maximum rate of production (or output) of an organisation. Several factors underlying the concept of capacity
make its understanding and use somewhat complex. Variation in employee absenteeism, equipment breakdowns,
vacations, holidays, delays in material procurement/delivery, work schedules, working hours, use of overtime,
temporary workers, outsourcing etc., must be taken into account when estimating the production capacity.
Design capacity
Design capacity refers to the maximum output that can possibly be attained. It is the maximum rate of output
achieved under ideal conditions.
36/JNU OLE
Effective capacity
Effective capacity is the maximum possible output given a product mix, scheduling difficulties, machine maintenance,
quality factors, absenteeism etc.Effective capacity is usually less than design capacity because of capacity losses
due to realities such as product mix changes, need for periodic preventive maintenance of equipment, problems in
scheduling and balancing operations, coffee breaks, lunch breaks and so on.
Maximum capacity
It is also known as Peak capacity, it is the maximum output that a facility can achieve under ideal conditions. Where
capacity is measured relative to equipment alone, it is known as related capacity.
Measures of capacity
Different measures of capacity are applicable in different situations. For example, capacity of an automobile plant
can be measured in terms of the number of automobiles produced per unit of time whereas capacity of a hospital
is measured in terms of the number of patients that can be treated per day. Therefore, capacity of a facility can be
either measured in terms of inputs.
An important measure of system effectiveness is the capacity utilisation rate which reveals how close a firm is to
its best operating point i.e. design capacity.
Best operating level is the level of capacity for which the facility was designed and thus is the volume of output at
which average unit cost is minimum.
Another measure of system effectiveness is efficiency which is the ratio of actual output to the effective capacity.
37/JNU OLE
Operation Management
• External
• (Product Standards safety regulations, labor activities)
6
• Operational
• (Inventory decisions, inspection & quality control)
5
• Human Resource
• (Training, Job Design, Employee Motivation, Absenteeism, turn over)
4
• Process
3 • (Quality & quantity of process)
• Facility
2 • (Cost of transportation, distance to market, energy sources etc.)
• Product
1 • (Uniformity ofproducts/services)
Forecasting production capacity for a product or service usually involves the following four steps:
• Estimate the total demand for a particular product from all producers
• Estimate the market share for the company for which capacity has to be forecasted
• Estimate the demand for the company by multiplying the total demand by its market share
• Translate the product and service demand for the company into capacity needs
Then the production capacity must be allocated to each product and service based on the best estimates of demand
for each product and service.
However, the production capacity to be provided by a firm may not necessarily equal to the amount of product and
services expected to be demanded.
38/JNU OLE
There are several reasons for this:
• The firm may not have enough capital and other resources to satisfy all the demand.
• Because of uncertainties of forecast and the need to link production capacity to competitive priorities of the
firm, a capacity cushion may have to be provided.
• A capacity cushion is an additional amount of production capacity over and above the required capacity to meet
the expected demand.
4.5 Identifying and Analysing Sources of Capacity to Meet Future Capacity Needs
There are many ways available to a firm to change its capacity. Firms may either have shortage of capacity or excess
capacity. The long range capacity needs of an organisation can be changed in the following ways:
Where present capacity is not sufficient to meet the forecast demand for the products and services, capacity can be
expanded by:
• Subcontracting component parts, sub units or even entire products to other firms
• Acquiring other firms, facilities or resources
• Building new plants and buying equipments/machinery etc
• Expanding, modernising or modifying existing facilities
• Reactivating facilities which are on standby status
When the present capacity is in excess of the expected future needs, capacity can be reduced by:
• Selling off existing facilities, selling inventories and laying-off or transferring employees
• Placing some facilities on standby status and selling the inventories and laying off or transferring employers
of such surplus facilities
• Developing and phasing in new products as other products decline, so that capacity rendered surplus can be
made use of
39/JNU OLE
Operation Management
For example when the management of a five star hotel makes a decision to increase the number of rooms, it must
also consider probable increased demand for parking lots, restaurant seating capacity, bigger dining hall and kitchen
capacity, increase in no. of hotel staff and house-keeping staff etc.
For example in a steel plant, the existing capacity, of a furnace may not be enough to meet the demand, but installing
an additional furnace would result in having excess capacity because additional furnaces cannot be installed in small
capacity chunks.
40/JNU OLE
The most important perspective is economic consideration. The questions to be answered are:
• Will an alternative be economically feasible?
• What would be the operating and maintenance cost?
• How soon it can be acquired?
• What would be the operating and maintenance cost?
• What would be its useful life?
• Would it be compatible with present personnel and present operating methods?
• What would be the public opinion or reaction to a new facility?
The capacity planning and facility planning decisions can be analysed by different approaches such as:
• Break-even analysis or cost volume analysis
• Financial analysis
• Decision analysis or decision tree analysis
• Waiting line analysis
The total cost is equal to the sum of the fixed and variable cost per unit multiplied by the volume of output (q)the
total revenue associated with a given volume of output Q is;
Total revenue = unit price x volume of output (Q)
The total profit is computed as,
Total profit (P) = Total revenue – volume of output (Q)
P = TR – TC
Where, TR = (Unit selling price) x volume of output
TR = sQ
Total cost (TC) = Fixed cost + (variable cost/unit x volume of output)
TC = (FC + vQ) where v is the variable cost/unit
P = TR-TC
P = (sQ) – (FC + vQ)
P = (s-v) Q-FC
Q = (P+FC)/((s-v))
When total revenue equal total cost, (i.e. break-even point)
Total profit = Nil
Then, QBEP = FC/((s-v))
41/JNU OLE
Operation Management
Assumptions
For cost volume analysis following assumptions to be made:
• One or a few products having the same cost characteristics are involved
• The volume of the product produced can be sold
• The variable cost per init does not change with volume of output
• Fixed cost do not change when volume of output changes or they are set up changes
• The revenue per unit is the same regardless of volume sold
• Revenue per unit exceeds variable cost per unit
Financial Analysis
Financial analysis helps mangers to take decisions regarding allocation of scarce funds to alternative investment
proposals.
b. Present Value
It is the sum of all future cash received from sales and cash flows of an investment proposed. The three most
commonly used methods of financial analysis are:
• payback period method
• net present value method
• internal rate of return method
NOTE: A detailed discussion on Payback period, net present value, internal rate of return is beyond the scope of
the syllabus.
NOTE: A detailed discussion on Decision tree analysis is beyond the scope of the syllabus.
42/JNU OLE
Waiting Line Analysis
Waiting line analysis or queuing theory is often used for designing of service system by determining the service
capacity and expected cost for various levels of service capacity.
NOTE: A detailed discussion on Waiting Line analysis is beyond the scope of the syllabus.
The need for the selection of the location may arise under any of the following conditions:
• when the business is newly started
• the existing business unit has outgrown its original facilities and expansion is not possible, hence a new location
has to be found
• the volume of business or the extent of market necessities the establishment of branches
• a lease expires and the landlord does not renew the lease
• when a company thinks that there is a possibility of reducing manufacturing cost by shifting from one location
to another location and
• other social or economic reasons for instance, inadequate labour supply, shifting of the maker etc
43/JNU OLE
Operation Management
Availability of power
• Power is essential to move the wheels of an industry. Coal, electricity, oil and natural gas are the sources of
power.
• Where coal is the source of power as in the case of the iron and steel industry, the factory has to be located near
the coal fields.
Transport facilities
• While going with the process of selection of location an entrepreneur considers the question of the availability
of transport facilities.
• Transport facilities are essential for bringing raw materials and men to the factory and for carrying the finished
products from the factory to the market.
• A place which is well connected rail, road and water transport is ideal for a plant location.
Suitability of climate
• The climate has its own importance in the location of a plant because of two reasons.
• First there are certain industries which, because of the nature of their production, require particular climatic
conditions. E.g. Humid climate for cotton textiles and jute.
• Secondly, climate affects labour efficiency. Extreme climatic conditions adversely affect labour efficiency and
such places do not attract industries.
Government policy
• The influence of government policies and programs on plant location is apparent in every country, particularly
in planned economies like ours.
• In the name of balanced regional development, many backward regions in India have been selected for the location
of new industries, which would generate the region’s economy and on larger canvas, the national economy.
• The government of India has been influencing plant location in a number of ways. Some of these are:
Licensing policy
Freight rate policy
44/JNU OLE
Establishing a unit in the public sector in remote area and developing it to attract other industries.
Institutional finance and government subsidies.
A place which abounds in all these facilities will naturally be preferred to another place which lacks them.
45/JNU OLE
Operation Management
Personal factors
There are entrepreneurs, especially small industrialists, who locate their plants purely on personal grounds disregarding
economic considerations.
Such locations sometimes may totally disapprove the current theories of plant location.
Disposal of waste
The site selection for the location of the plant should have the provision for the disposal of the waste. There must
be enough land for dumping of the solid waste.
The site selected should, as far as possible, be in the midst of good scenery. The question of beauty should not be
ignored.
46/JNU OLE
• preference for acquiring an existing structure that is improperly located or not designed for the most efficient
production
• choice of community with low cultural and educational standards
Rural site
The facilities available at a village site are not as many as are found in a city; but they are more attractive.
• Land is available at cheaper rates.
• The rates and taxes are negligible.
• Spacious layout available and open spaces are possible.
• Advantages of single storey buildings are available.
• Low wages for unskilled workers but high wages for skilled workers because they have to be mobilised from
elsewhere.
• Fewer labour troubles
• Avoidance of danger from fire and other hazards resulting from the operations of neighboring units
• Avoidance of undesirable neighbors
• Lack of supply of skilled workers
• Lack of civic amenities for employees
• Lack of transport facilities
Suburban site
• They are less costly.
• All transport facilities are available.
• Quarters for workers provided by local authorities or by private entrepreneurs.
• Easy availability of labors.
• Land is available at cheap rates.
Urban site
A big city has all the facilities which favor a location for a plant.
• Transportation facilities are no problem.
• Labour is available in plenty.
• Municipal services for water, sewage disposal, public health and education are available.
• banking, repair and related services are available
• facilities for contracting out a portion of the work are available
• a large local market is available
• high advertising value is available
47/JNU OLE
Operation Management
The graphical approach can easily identify the range of annual production volume over which a location is preferable.
The steps involved in this method are:
• Determine all relevant costs that vary with each location.
• Categorise the costs for each location into annual fixed costs (FC) and variable cost per annum (VC), for each
location.
• Plot the total cost associated with each location on a single chart or graph of annual cost versus annual production
volume.
• Select the location with the lowest total annual cost (TC) at the expected production volume per annum (Q)
Qualitative Factor Analysis
If economic criteria are not sufficiently influential to decide the location alternative; a system of weighting the criteria
might be useful in making a plant location decision. This approach is referred to as qualitative factor analysis. The
steps involved are:
• Develop a list of relevant factors.
• Assign a weight to each factor to indicate its relative importance.
• Assign a common scale to each factor and designated any minimum point to be scored by any location.
• Score each potential location according to the designated scale and multiply the scores by the weights to arrive
at the weighted scores.
• Total the points for each location, and choose the location with the maximum points.
48/JNU OLE
Summary
• Capacity plans are made at two levels.
• Capacity planning is central to the long term success of an organisation.
• Capacity planning is generally viewed in terms of three time horizons or durations;
• Long range capacity planning which is usually having a time horizon of more than one or two years.
• Intermediate range capacity planning which has a time horizon or duration for the next 6-18 months. The
intermediate range capacity may be varied by such alternatives such as hiring or laying off labour, purchasing
or making new tools and minor equipments and outsourcing/subcontracting etc.
• Short range planning which has a time horizon or duration of less than one month. This is concerned with day
to day planning such as daily scheduling of activities and machine loading or weekly scheduling process which
involves making adjustments to eliminate the variance between planned output and actual output.
• Many decisions about design of the production system and operation of the production system may have an
impact on capacity.
• To enhance capacity management, the following approaches to capacity alternatives could be developed:
• To be systematic, in choosing a plant location, the entrepreneur would do well to proceed step by step, the steps
being:
References
• Meredith, J. R., and Scott, M.S., 2002.Operations Management for MBAs. 2nd Edition.New York:John Wiley
and Sons, Inc.
• Vollmann, T.E., William, L.B, Clay, W., and Robert, F.J., 2005.Manufacturing Planning and Control Systems.
Boston:McGraw-Hill.
• 2010. Capacity Planning 2, [Video online] Available at: <http://www.youtube.com/watch?v=Td2WpNpBJUc>
[Accessed 24 August 2012].
• 2008. Capacity Planning and Management [Video online] Available at: <http://www.youtube.com/
watch?v=m4NJnhekJPw> [Accessed 24 August 2012].
• New Age International,1966. Introduction to Product and Operations Management [pdf] Available at: <http://
www.newagepublishers.com/samplechapter/001233.pdf> [Accessed 11 November 2010].
• Tutor2u, Introduction to POM [Online] Available at: <http://tutor2u.net/business/production/pom_introduction.
html> [Accessed 11 November 2010].
Recommended Reading
• Bitner, M. J., 1992. Servicescapes: The Impact of Physical Surroundings on Customers and Employees Journal
of Marketing.
• Bollinger, S., 1998. Fundamentals of Plant Layout, Society of Manufacturing Engineers in Association with
Richard Muther and Associates
• Francis, R. L. & White, J. A.,1992. Facility Layout and Location: An Analytical Approach. Englewood Cliffs,
NJ: Prentice Hall.
49/JNU OLE
Operation Management
Self Assessment
1. _________ capacity planning which is usually having a time horizon of more than one or two years.
a. Short range
b. Intermediate range
c. Long range
d. Medium range
2. Intermediate range capacity planning which has a time horizon or duration for________ months.
a. 10-12
b. 6-8
c. 10-20
d. 6-18
3. ____________ capacity refers to the maximum output that can possibly be attained.
a. Production
b. Design
c. Effective
d. Efficient
5. Effective capacity is usually less than _______capacity because of capacity losses due to realities such as
productmix changes, need for periodic preventive maintenance of equipment, problems in scheduling and
balancingoperations, coffee breaks, lunch breaks and so on.
a. peak
b. relative
c. design
d. measure of
6. Following analysis focuses on relationships between cost, revenue and volume of output is known
as_________.
a. financial analysis
b. break-even analysis
c. decision tree analysis
d. waiting line analysis
7. Which of the following analysis helps mangers to take decisions regarding allocation of scarce funds to alternative
investment proposals?
a. Financial analysis
b. Break-even analysis
c. Decision tree analysis
d. Waiting line analysis
50/JNU OLE
8. The difference between the cash received from sales and cash outflow for labor, materials, overhead and taxes
etc. is known as___________.
a. Present value
b. Cash inflow
c. Cash flow
d. Interest
9. The expected value (EV) gives only relative measures of value and lot absolute measures is used
in________.
a. Waiting line analysis
b. Decision tree analysis
c. Financial analysis
d. Break-even analysis
10. Adequate ______ is essential for the successful working of any organisation, where facilities for raising capital
are available attracts new industries.
a. machinery
b. manpower
c. money
d. materials
51/JNU OLE
Operation Management
Chapter V
Facility Layout
Aim
The aim of this chapter is to:
Objectives
The objectives of this chapter are to:
Learning outcome
At the end of this chapter, you will be able to:
52/JNU OLE
5.1 Introduction to Facility Layout
A typical manufacturing plant has a number of diverse activities interacting with each other. Thus, raw materials
arrive at a shipping dock, they are unpacked and checked in quality control area, then they might be processed
through several processing areas, and finally the finished product again passes through the shipping dock.
• In addition to areas specifically related to production, there must be dressing rooms, lunch rooms, and restrooms
for employees; offices for supervision, design, and production control; and space for inventory and aisles.
• In fact, a plant might be viewed as a large number of finite geometric areas arranged on the floor space of the
building.
• The problem of arranging these areas in an effective manner is the facility layout problem.
• Clearly, the layout problem has relevance in many areas of facility and equipment design, from the layout of
the rooms in a home to the layout of chips on an electronic circuit board.
• Although the facility layout problem may arise in many contexts, in this section we assume we are dealing with
a plant manufacturing products for sale.
The objective is to arrange these elements in a way that ensures a smooth work flow (in a factory) or a particular
traffic pattern (in a service organisation).
The formats by which departments are arranged in a facility are defined by the general pattern of work flow; thereare
four basic types:
53/JNU OLE
Operation Management
• This layout may be appropriate when there are many different products, each with a low volume of production.
Machines are general purpose, within their general function area, so that a wide variety of products can be
handled. Because the expense of automation may be too great to be justified by the low volume, the machines
in this arrangement will probably be at a relatively low level of automation. Workers will be highly skilled.
• Production scheduling is difficult with this type of arrangement because the level and type of work is highly
variable.
• This results in large amounts of work-in-process, long product lead times, and high levels of management
interaction.
• Typically there is a high degree of product movement required by the long and variable routes of individual
products through the system.
• The costs for setting up machines to produce the various products will be high because of the variety of different
products and small lot sizes.
• The arrangement can adapt readily to changes in product volume and design because of its inherent flexibility
M5
M6
M7
M1 M2 Offices
M3 M4
54/JNU OLE
M1
M2 M6
M7
M3 Offices
M5
M4
55/JNU OLE
Operation Management
M3
M2 M2
M5
M1 M2 M3
M6
M7 M4
M6
M4 Offices
M1 M7
Raw material
Machine & Equipment
Aircraft Assembly Finished Product
Labour
56/JNU OLE
5.3.5 Flexible Manufacturing System
• The FMS is a system with automated material handling moving individual units of product between automated
processors. Robotic manipulators often handle material.
• Using computer controlled movement and processing, a wide variety of products can be manufactured. All of
this is to be accomplished with very low setup time, great flexibility of function, and very little manual labor.
• The diversity of possible FMS, and the rapidly changing technologies, makes detailed consideration of the
design of FMS beyond the scope of this text.
• Certainly many of the classical questions (and answers) associated with facility design are no longer relevant
for the FMS. In this text, we consider the FMS as just another kind of machine, with perhaps a very broad range
of capabilities.
Input data
• Here we are considering the problem of arranging several departments on a plant with a single floor and fixed
dimensions.
• Certain data is necessary to describe the layout problem.
• Number of departments, n, Physical area of each department, Ai for i = 1…n
• Physical dimensions of the plant in which the departments are to be placed: Length, L, and Width, W.
57/JNU OLE
Operation Management
Distance
• Our models involve the distance from one department to another. The distance depends on the layout. To illustrate
consider a problem with ten departments with each department having an area of 100 square feet.
• The ten departments are to be placed in an area that is 50 feet long by 20 feet wide. One layout is shown in
figure below.
20
1 2 3 4 5
A B C D E
10
6 7 8 9 10
F G H I J
0
0 10 20 30 40 50 X
• This is only one of many possible layouts. If we assume that the departments must maintain a square shape,
every permutation of the letters A through J is a different layout. There are n! Permutations.
• The matrix as in Fig. 5.6 describes the flow between the departments. This is called the From-To matrix because
an element (i, j) contains fij, the flow from department i to department j
To
From A B C D E F G H I J
A 5 1 9
B 3 4 1
C 1 9 2
D 6 1
E 8 3
F 2 5
G 6
H 8
I
J
58/JNU OLE
• The criterion for the layout problem involves the distance between departments. First we must prescribe the
end points for the distance measurement.
• Here we assume that distances are measured between the centroids or centers of gravity of departments. Second,
we must specify the route of travel. One possibility is that flow will follow a straight-line path. This is the
Euclidean measure. More common in layout analysis, is to assume that flow travels via paths that are parallel
to the axes of the layout. This is the rectilinear measure.
• The centroids are specified in terms of the coordinate system as, x(i) = x-coordinate of the centroid of department
i, and y(i) = y-coordinate of the centroid of department i.
• The centroid is the same as the center of the area when the department is rectangular. For a more general shape,
the centroid is the center of gravity of area.
• In the example case of Fig. 1 we have the centroids as follows.
• Here the vertical lines indicate absolute value. Fig. 5.7 shows both the flow and distance between all pairs of
departments on the from-to chart.
• The flow appears above the diagonals and the distance appears below.
To
From A B C D E F G H I J Sum
5 1 9
A 40 40 50 690
B 3 4 1 190
20 30 10
1 9 2
C 10 20 30 250
6 1 190
D 30 10
8 3 520
E 50 40
2 5 120
F 10 20
6 60
G 10
8 80
H 10
I 0
J 0
59/JNU OLE
Operation Management
• The cost associated with each row of the chart is shown at the right of Fig. 5.7. The cost of the layout is the
sum of the row costs.
• The factors cij and fij are given as data, but the factor dij depends on the layout.
60/JNU OLE
Summary
• The formats by which departments are arranged in a facility are defined by the general pattern of work flow;
there are three basic types (process layout, product layout, and fixed-position layout) and one hybrid type (group
technology or cellular layout).
• A process layout (also called a job-shop or functional layout) is a format in which similar equipment or functions
are grouped together, such as all lathes in one area and all stamping machines in another.
• A part being worked on then travels, according to the established sequence of operations, from area to area, where
the proper machines are located for each operation. This type of layout is typical of hospitals, for example, where
areas are dedicated to particular types of medical care, such as maternity wards and intensive care units.
• A product layout (also called a flow-shop layout) is one in which equipment or work processes are arranged
according to the progressive steps by which the product is made. The path for each part is, in effect, a straight
line. Production lines for shoes, chemical plants, and car washes are all product layouts.
• A group technology (cellular) layout groups dissimilar machines into work centers (or cells) to work on products
that have similar shapes and processing requirements. A group technology (GT) layout is similar to a process
layout in that cells are designed to perform a specific set of processes, and it is similar to a product layout in that
the cells are dedicated to a limited range of products. (Group technology also refers to the parts classification.
• Coding system used to specify machine types that go into a cell.) In a fixed-position layout, the product (by
virtue of its bulk or weight) remains at one location. Manufacturing equipment is moved to the product rather
than vice versa.
• Construction sites and movie lots are examples of this format. Many manufacturing facilities present a combination
of two layout types. For example, a given production area may be laid out by process, while another area may
be laid out by product. It is also common to find an entire plant arranged according to product layout.
• Different types of layouts may be used in each area, with a process layout used in fabrication, group technology
in subassembly, and a product layout used in final assembly.
• Facility layout is where the rubber meets the road in the design and operation of a production system. A good
factory (or office) layout can provide real competitive advantage by facilitating material and information flow
processes. It can also enhance employees’ work life.
References
• Bitner, M. J., 1992. The Impact of Physical Surroundings on Customers and Employees. Journal of
Marketing.
• Francis, R. L. & White, J. A., 1992. Facility Layout and Location: An Analytical Approach, Englewood Cliffs,
NJ: Prentice Hall.
• 2008. Flexible Manufacturing System [Video online] Available at: <http://www.youtube.com/
watch?v=c7CRZZlnmKo> [Accessed 24 August 2012].
• 2010. Facility Layout [Video online] Available at: <http://www.youtube.com/watch?v=f721jY_MPPo> [Accessed
27 August 2012].
• Brasad & Ritter, 2001. Introduction to Six Sigma. [pdf] Available at: <http://www.tools2improve.com/stsssample.
pdf.
• TutorialsPoint.com., 2012. Just-In-Time Manufacturing (JIT), [Online] Available at: <http://www.tutorialspoint.
com/management_concepts/just_in_time_manufacturing.htm> [Accessed 31 August 2012].
Recommended Reading
• Johnson, R., 1982. Spacecraft for Multi-Floor Layout Planning.
• Muther, R. & Wheeler, J. D., 1962. Simplified Systematic Layout Planning. Industrial Engineering and
Management Press, Institute of Industrial Engineers.\
• Meyers, F. E., 1993. Plant layout and material handling, Regents/Prentice Hall.
61/JNU OLE
Operation Management
Self Assessment
1. The problem of arranging floor space of the building, restrooms for employees; offices for supervision, design,
and production control and space for inventory etc. is known as _________.
a. inventory problem
b. layout conflict
c. facility layout problem
d. facility design problem
2. _____ is a format in which similar equipment or functions are grouped together, such as all lathes in one area
and all stamping machines in another.
a. Flow shop layout
b. Job shop layout
c. Fixed position layout
d. Group technology layout
3. _________ type of layout is typical for an assembly line where a single product, or a few very similar products,
passes through the line in a continuous fashion.
a. Job shop layout
b. Fixed position layout
c. Flow shop layout
d. Group technology layout
4. ________ also refers to the parts classification and coding system used to specify machine types that go into
a cell.
a. Group technology layout
b. Job shop layout
c. Fixed position layout
d. Flow shop layout
5. In _______ layout, a high degree of task ordering is common, and to the extent that this precedence determines
production stages, a fixed-position layout might be developed by arranging materials according to their
technological priority.
a. Job shop
b. Fixed position
c. Flow shop
d. Group technology
6. Which of the following system is a system with automated material handling moving individual units of product
between automated processors?
a. Assembly line system
b. Robotic system
c. Flexible Manufacturing system
d. MRP
62/JNU OLE
7. Good Facility Layout helps to manufacture quality goods in _________.
a. economical manufacturing cost
b. less manufacturing cost
c. average manufacturing cost
d. controlled manufacturing cost
8. Production scheduling is difficult with this type of arrangement because the level and type of work is highly
variable.
a. Fixed-position layout
b. Group technology layout
c. Product layout
d. Process layout
10. Construction sites and movie lots are examples of the following format of layout.
a. Product layout
b. Process layout
c. Group technology layout
d. Fixed-position layout
63/JNU OLE
Operation Management
Chapter VI
Work System Design
Aim
The aim of this chapter is to:
Objectives
The objectives of this chapter are to:
Learning outcome
At the end of this chapter, you will be able to:
64/JNU OLE
6.1 Introduction
Work systems are systems in which humans, computer, robotic and other systems, artifacts and space come together
performing activities over time to produce goods, services or, as is the case in the work system described in this
paper, scientific discovery.
The work systems we encounter everyday have mostly existed over a long period of time. Improvement of such
work systems is often done through business process analysis and reengineering (Hammer and Champy, 1993)
(Davenport, 1993).
• Design of work systems is an important component in Production and Operations Management.
• Design of work systems forms the basis and explains the importance of work design.
• Design of work systems is used to describe the two basic approaches to job design, the first approach focuses
on
• Efficiency through job specialisation and the other focuses behavioral approaches to job design.
Design of Work System also entails method analysis which in turn centers on how jobs are performed. Motivation
and Trust also form an important dimension in Design of Work systems as this alone provides an opportunity to the
Organisation to develop effective teams who can achieve organisation short and long term objectives.
Motivation and Trust observations also emphasises working conditions that in turn lead to work measurements
which leads to reward and compensation of the individual working for the organisation.
65/JNU OLE
Operation Management
6.5.1 Specialisation
The term specialisation refers to work that concentrates on some aspect of a product or service. Jobs that have a
narrow scope such as Assembly lines, medical specialties, MBA courses etc. Specialisation in jobs tends to yield
high productivity, low unit costs and lead to high standard of living in most of the industrial nations.
6.5.3 Motivation
The importance of these approaches to job design is that they have the potential to increase the motivational power
of jobs by increasing worker satisfaction through improvement in quality of work life.
Motivation always influences quality and productivity. It contributes to work environment where as Trust influences
productivity and employee-management relations
66/JNU OLE
6.5.4 Teams
Organisations adopt teams in order to exploit the benefits of teams:
• Higher quality
• Higher productivity
• Greater worker satisfaction
• Self-directed teams are groups of empowered to make certain changes in their work process.
Methods Analysis Procedure is simple and effective and does the following:
• Identifies the operation to be studied
• Gets employee input
• Studies and documents the current method
• Analyses the job
• Proposes new methods
• Installs new methods
• Follow-ups to ensure improvements have been achieved
• Selecting operations to study
• Sometimes a supervisor or a foreman may request an operations or part of the operations to be studied. This
would be the intent to increase productivity and reduce costs.
One should use charts, graphs and verbal descriptions to capture how the job is being performed. This can be the
first basis and can lead to improvement in job design.
Experienced Job design analysts often develop a checklist and try to answer these questions
• Why is there a delay or storage at this point?
• How can travel distances be shortened?
• Can material handlings be reduced?
• Would a rearrangement of the workplace result in greater efficiency?
67/JNU OLE
Operation Management
Developing work methods An operations manager along with an analyst aims for motion efficiency by achieving
the following
• Elimination of unnecessary motions
• Combination of various activities
• Reduction in fatigue
• Improvement in the arrangement of the workplace
• Improvement in the design of tools and equipment
68/JNU OLE
• Transport load means movement of an object after hold Release load means to deposit the object.
• Some other common therbligs are inspect, position, plan, rest and delay.
• Also frank and lillian gilbreth are responsible for micro motion study.
Also, the number of cycles that must be timed is a function of three things:
• The variability of observed times
• The desired accuracy
• The desired level of confidence interval for the estimated job time
Desired accuracy is expressed as percentage of the mean of the Observed Time. N= (zs/a x -) 2
Where Z is the number of normal standard deviations needed for desired confidence S is sample standard deviation
a is desired accuracy percentage x- (x bar) is the sample mean
Example
Q. A Mechanical Engineer working for an automobile manufacture in Lahore presents the following information
to the Operations Manager. The assembly workers take a mean time of 120 minutes to assemble a single car with
a standard deviation of 5 minutes. The confidence limit if 95%, The Operations Manager will need how many
observations if the desired maximum error is + 5% Solution
Solution:
Given Data S= 5 minutes, Z is 1.96 (since 95 CI) x- = 120 minutes, a= 5 % The formula is,
N= (zs/a x -)2
Substituting the values,
N= ( (1.96)(5)/(0.05)(120))2 =(96.04)/(36)=2.67 studies = 3 studies
69/JNU OLE
Operation Management
MTM advantages
• They are based on large number of workers under controlled conditions.
• The analyst is not required to rate performance in developing the standard.
• There is no disruption of the operation.
• Standards can be established even before a job is done.
70/JNU OLE
Summary
• The importance of work design has been often overlooked because the work of Operations Manager in the past
was not linked with the Human Resource Department of the same organisation.
• Managers are trained to understand the two basic approaches to job design.
• Study Techniques, which focused on efficiency aspect of the job. This may ignore the behavior aspect but still
form an important and integral part of job design.
• Work System Design consists of job design, work measurement and establishment of time standards and worker
compensation.
• The interesting fact is that even in decisions in other areas of design can affect the work design system or even
a change in the work design system can change the decisions in other areas.
• Like Product or Service, design will affect Design of Work Systems. Layout Decisions will also affect Design
of Systems.
• Job design involves specifying the content and methods of job. In general the goal of the job design is to create
a work system that is not only productive but also efficient.
• Job designers are concerned with what will be done, who will do the job, how the job will be done.
• Methods analysis deals with analysing how a job gets done, begins with overall analysis and then moves to
specific details like changes in tools and equipment, changes in product design or new products, changes in
materials or procedures.
• Motion study forms an important part in productivity improvements. It is based on Frank Gilbreths brick laying
trade in the early 20th century, with time motion study techniques.
• When we discuss the design part of work systems we often discuss the importance of standard time in work
measurement.
References
• Aswathappa, K., 2010. Production and Operations management- Production Planning Control, Himalaya
publishing House.
• Francis, R. L., and White, J. A., 1992. Facility Layout and Location: An Analytical Approach. Englewood Cliffs,
NJ: Prentice Hall.
• 2010. Job Enrichment [Video online] Available at: <http://www.youtube.com/watch?v=I8eTzyDRW2I>
[Accessed 27 August 2012]
• 2011. Business Flow Chart [Video online] Available at: <http://www.youtube.com/watch?v=PxieA4IEi1g>[Accessed
27 August 2012].
• Niebel, B.W., and Scott, J., 1999. Industrial Engineering, [Online] Available at: <http://www.scribd.com/
doc/58353010/18/PRINCIPLES-OF-MOTION-STUDY> [Accessed 31 August 2012].
• Anil,K.S., and Suresh, N., 2009. Operations Management. [pdf] Available at :<http:// tn.upi.edu/pdf/Operations_
Management.pdf.
Recommended Reading
• Schonberger, R. J., 1986. World Class Manufacturing, New York: Free Press.
• Sommers, M. S. & Kernan, J. B., 1965. A Behavioural Approaching to Planning, Layout and Display, Journal
of Retailing.
• Bitner M. J., 1992. Servicescapes: The Impact of Physical Surroundings on Customers and Employees, Journal
of Marketing.
71/JNU OLE
Operation Management
Self Assessment
1. ________ are systems in which humans, computer, robotic, and other systems, artifacts and space come together
performing activities over time to produce goods, services or, as is the case in the work system described in this
paper, scientific discovery.
a. Motion system
b. Work systems
c. Design system
d. Service design system
2. ________is the body of knowledge concerned with analysis of the work methods and the standard of proposed
work methods.
a. Work design
b. Motion study
c. Work study
d. Method study
3. __________ is the application of techniques designed to establish the time for a qualified worker to carry out
a specific job at defined level of performance.
a. Work measurement
b. Method study
c. Work design
d. Design system
4. The goal of the ______________ is to create a work system that is not only productive but also efficient.
a. work design
b. motion study
c. work measurement
d. job design
5. In design of work system, ____________ in jobs tends to yield high productivity, low unit costs and lead high
standard of living in most of the industrial nations.
a. motivation
b. specialization
c. job rotation
d. enrichment
6. Which of the following is used to examine the overall sequence of an operation by focusing on movements of
the operator or flow of materials?
a. Job design
b. Work design
c. Flow process chart
d. Process design
72/JNU OLE
7. Which of the following is increasing responsibility for planning and coordination tasks, by vertical loading?
a. Job Enrichment
b. Job Rotation
c. Job Enlargement
d. Job Design
8. The systematic recording and critical examination of existing and proposed ways of doing work as a means of
developing and applying easier and more effective methods and reducing costs.
a. Work Study
b. Work Design
c. Method Study
d. Work Measurement
9. Self-directed groups are empowered to make certain benefits in organisation such as higher quality, higher
productivity, and greater worker satisfaction are called as _______.
a. Teams
b. Group dynamics
c. Motivated groups
d. Self-directed team
73/JNU OLE
Operation Management
Chapter VII
Quality Management
Aim
The aim of this chapter is to:
Objectives
The objectives of this chapter are to:
Learning outcome
At the end of this chapter, you will be able to:
74/JNU OLE
7.1 Introduction
Successful companies understand the powerful impact customer-defined quality can have on their business. For
this reason many competitive firms continually increase their quality standards. For example, both the Ford Motor
Company and the Honda Motor Company have recently announced that they are making customer satisfaction their
number one priority. The slow economy of 2003 impacted sales in the auto industry. Both firms believe that the
way to rebound is through improvements in quality, and each has outlined specific changes to their operations. Ford
is focusing on tightening already strict standards in their production process and implementing a quality program
called Six-Sigma. Honda, on the other hand, is focused on improving customer-driven product design. Although
both firms have been leaders in implementing high quality standards, they believe that customer satisfaction is still
what matters most.
In this chapter you will learn about the philosophy of TQM, its impact on organisations, and its impact on your life.
You will learn that TQM is about meeting quality expectations as defined by the customer; this is called customer-
defined quality.
However, defining quality is not as easy as it may seem, because different people have different ideas o what
constitutes high quality. Let’s begin by looking at different ways in which quality can be defined.
75/JNU OLE
Operation Management
The second category consists of the cost consequences of poor quality, which are called Quality Failure costs.
These include External Failure Costs and Internal Failure Costs. These costs of quality are shown in table below.
The first two costs are incurred in the hope of preventing the second two. Prevention costs are all costs incurred
in the process of preventing poor quality from occurring. They include quality planning costs, such as the costs
of developing and implementing a quality plan. Also included are the costs of product and process design, from
collecting customer information to designing processes that achieve conformance to specifications.
• Employee training in quality measurement is included as part of this cost, as well as the costs of maintaining
records of information and data related to quality.
• Appraisal costs are incurred in the process of uncovering defects. They include the cost of quality inspections,
product testing, and performing audits to make sure that quality standards are being met.
• Also included in this category are the costs of worker time spent measuring quality and the cost of equipment
used for quality appraisal.
• Internal Failure Costs are associated with discovering poor product quality before the product reaches the
customer site. One type of internal failure cost is rework, which is the cost of correcting the defective item.
• Sometimes the item is so defective that it cannot be corrected and must be thrown away. This is called scrap,
and its costs include all the material, labor, and machine cost spent in producing the defective product.
• Other types of internal failure costs include the cost of machine downtime due to failures in the process and the
costs of discounting defective items for salvage value.
• External Failure Costs are associated with quality problems that occur at the customer site.
• These costs can be particularly damaging because customer faith and loyalty can be difficult to regain.
• They include everything from customer complaints, product returns, and repairs, to warranty claims, recalls,
and even litigation costs resulting from product liability issues.
• A final component of this cost is lost sales and lost customers. For example, manufacturers of lunch meats
and hot dogs whose products have been recalled due to bacterial contamination have had to struggle to regain
consumer confidence.
Other examples include auto manufacturers whose products have been recalled due to major malfunctions such as
problematic braking systems and airlines that have experienced a crash with many fatalities.
• External failure can sometimes put a company out of business almost overnight.
• Companies that consider quality important invest heavily in prevention and appraisal costs in order to prevent
internal and external failure costs.
• The earlier defects are found, the less costly they are to correct. For example, detecting and correcting defects
during product design and product production is considerably less expensive than when the defects are found
at the customer site as shown in Fig. 7.1
76/JNU OLE
• External Failure Costs tend to be particularly high for service organisations. The reason is that with a service the
customer spends much time in the service delivery system, and there are fewer opportunities to correct defects
than there are in manufacturing. Examples of external failure in services include an airline that has overbooked
flights, long delays in airline service, and lost luggage.
Cost of defect
77/JNU OLE
Operation Management
Do
The next step in the cycle is implementing the plan (do). During the implementation process managers should
document all changes made and collect data for evaluation.
Study
The third step is to study the data collected in the previous phase. The data are evaluated to see whether the plan is
achieving the goals established in the plan phase.
Act
• The last phase of the cycle is to act based on the results of the first three phases.
• The best way to accomplish this is to communicate the results to other members in the company and then
implement the new procedure if it has been successful.
Note that this is a cycle; the next step is to plan again. After we have acted, we need to continue evaluating the
process, planning, and repeating the cycle again.
Do Act
Plan Study
7.4.2 Benchmarking
• Another way companies implement continuous improvement is by studying business practices of companies
considered “best in class.” This is called as benchmarking.
• The ability to learn and study how others do things is an important part of continuous improvement.
• The benchmark company does not have to be in the same business, as long as it excels at something that the
company doing the study wishes to emulate.
• For example, many companies have used Lands’ End to benchmark catalog distribution and order filling,
because Lands’ End is considered a leader in this area. Similarly, many companies have used American Express
to benchmark conflict resolution.
78/JNU OLE
7.5 Employee Empowerment
Part of the TQM philosophy is to empower all employees to seek out quality problems and correct them. With the
old concept of quality, employees were afraid to identify problems for fear that they would be reprimanded. Often
poor quality was passed onto someone else, in order to make it “someone else’s problem.”
The new concept of quality, TQM, provides incentives for employees to identify quality problems. Employees are
rewarded for uncovering quality problems, not punished.
• In TQM, the role of employees is very different from what it was in traditional systems.
• Workers are empowered to make decisions relative to quality in the production process. They are considered a
vital element of the effort to achieve high quality.
• Their contributions are highly valued, and their suggestions are implemented. In order to perform this function,
employees are given continual and extensive training in quality measurement tools.
• To further stress the role of employees in quality, TQM differentiates between external and internal
customers.
• External customers are those that purchase the company’s goods and services. Internal customers are employees
of the organisation who receive goods or services from others in the company.
• For example, the packaging department of an organisation is an internal customer of the assembly
department.
• Just as a defective item would not be passed to an external customer, a defective item should not be passed to
an internal customer.
Using techniques such as brainstorming, discussion, and quality control tools, teams work regularly to correct
problems. The contributions of teams are considered vital to the success of the company. For this reason, companies
set aside time in the workday for team meetings.
• Teams vary in their degree of structure and formality, and different types of teams solve different types of
problems.
• One of the most common types of teams is the quality circle, a team of volunteer production employees and
their supervisors whose purpose is to solve quality problems.
• The circle is usually composed of eight to ten members, and decisions are made through group consensus. The
teams usually meet weekly during work hours in a place designated for this purpose.
• They follow a preset process for analysing and solving quality problems. Open discussion is promoted,
and criticism is not allowed. Although the functioning of quality circles is friendly and casual, it is serious
business.
• Quality circles are not mere “gab sessions.” Rather, they do important work for the company and have been
very successful in many firms.
79/JNU OLE
Operation Management
• They are easy to understand, yet extremely useful in identifying and analysing quality problems. Sometimes
workers use only one tool at a time, but often a combination of tools is most helpful.
A general cause-and-effect diagram is shown in Figure 7.3. The “head” of the fish is the quality problem, such as
damaged zippers on a garment or broken valves on a tire.
• The diagram is drawn so that the “spine” of the fish connects the “head” to the possible cause of the problem.
These causes could be related to the machines, workers, measurement, suppliers, materials, and many other
aspects of the production process.
• Each of these possible causes can then have smaller “bones” that address specific issues that relate to each
cause.
• For example, a problem with machines could be due to a need for adjustment, old equipment, or tooling
problems.
• Similarly, a problem with workers could be related to lack of training, poor supervision, or fatigue.
• Cause-and-effect diagrams are problem-solving tools commonly used by quality control teams.
• Specific causes of problems can be explored through brainstorming. The development of a cause-and-effect
diagram requires the team to think through all the possible causes of poor quality
7.6.2 Flowcharts
• A flowchart is a schematic diagram of the sequence of steps involved in an operation or process.
• It provides a visual tool that is easy to use and understand. By seeing the steps involved in an operation or
process, everyone develops a clear picture of how the operation works and where problems could arise.
7.6.3 Checklists
A checklist is a list of common defects and the number of observed occurrences of these defects. It is a simple yet
effective fact-finding tool that allows the worker to collect specific information regarding the defects observed.
• The checklist in Fig.7.3 shows four defects and the number of times they have been observed. It is clear that the
biggest problem is ripped material. This means that the plant needs to focus on this specific problem for example,
by going to the source of supply or seeing whether the material rips during a particular production process.
• A checklist can also be used to focus on other dimensions, such as location or time. For example, if a defect is
being observed frequently, a checklist can be developed that measures the number of occurrences per shift, per
machine, or per operator.
• In this fashion we can isolate the location of the particular defect and then focus on correcting the problem.
These charts are used to evaluate whether a process is operating within expectations relative to some measured value
such as weight, width, or volume.
For example, we could measure the weight of a sack of flour, the width of a tire, or the volume of a bottle of soft
drink. When the production process is operating within expectations, we say that it is “in control.”
80/JNU OLE
• To evaluate whether or not a process is in control, we regularly measure the variable of interest and plot it
on a control chart. The chart has a line down the center representing the average value of the variable we are
measuring.
• Above and below the center line are two lines, called the Upper Control Limit (UCL) and the Lower Control
Limit (LCL). As long as the observed values fall within the upper and lower control limits, the process is in
control and there is no problem with quality. When a measured observation falls outside of these limits, there
is a problem.
7.6.7 Histograms
• A histogram is a chart that shows the frequency distribution of observed values of a variable.
• We can see from the plot what type of distribution a particular variable displays, such as whether it has a normal
distribution and whether the distribution is symmetrical
81/JNU OLE
Operation Management
Quality
Problems LCL
X
6. Pareto Chart
%
3. Checklist
Detect type No. of Defects Total A B C D E
Broken Zipper 3
Ripped material 7 7. Histogram
Missing buttons 3 Frequency
Faded colour 2 Frequency
A B C D E
The seven tools of quality control
82/JNU OLE
• Then in 1977 the International Organisation for Standardisation (ISO) published its first set of standards for
quality management called ISO 9000.
• The International Organisation for Standardisation (ISO) is an international organisation whose purpose is to
establish agreement on international quality standards.
• It currently has members from 91 countries, including the United States. To develop and promote international
quality standards, ISO 9000 has been created.
• ISO 9000 consists of a set of standards and a certification process for companies. By receiving ISO 9000
certification, companies demonstrate that they have met the standards specified by the ISO.
• The standards are applicable to all types of companies and have gained global acceptance.
• In many industries ISO certification has become a requirement for doing business. Also, ISO 9000 standards
have been adopted by the European Community as a standard for companies doing business in Europe.
• In December 2000 the first major changes to ISO 9000 were made, introducing the following three new
standards:
• ISO 9000:2000 Quality Management Systems Fundamentals and Standards: Provides the terminology and
definitions used in the standards. It is the starting point for understanding the system of standards.
• ISO 9001:2000 Quality Management Systems Requirements: This is the standard used for the certification of
a firm’s quality management system. It is used to demonstrate the conformity of quality management systems
to meet customer requirements.
• ISO 9004:2000 Quality Management Systems Guidelines for Performance: Provides guidelines for establishing
a quality management system. It focuses not only on meeting customer requirements but also on improving
performance.
83/JNU OLE
Operation Management
• Companies that have attained the benefits of TQM have created a quality culture.
• These companies have developed processes for identifying customer-defined quality.
• In addition, they have a systematic method for listening to their customers, collecting and analysing data
pertaining to customer problems, and making changes based on customer feedback.
84/JNU OLE
Summary
• Total quality management (TQM) is different from the old concept of quality because its focus is on serving
customers, identifying the causes of quality problems, and building quality into the production process.
• There are four categories of quality costs. The first two are prevention and appraisal costs, which are incurred
by a company in attempting to improve quality. The last two costs are internal and external failure costs, which
are the costs of quality failures that the company wishes to prevent.
• Seven features of TQM combine to create the TQM philosophy: customer focus, continuous improvement,
employee empowerment, use of quality tools, product design, process management, and managing supplier
quality.
• Quality function deployment (QFD) is a tool used to translate customer needs into specific engineering
requirements. Seven problem-solving tools are used in managing quality. Often called the seven tools of quality
control, they are cause-and-effect diagrams, flowcharts, checklists, scatter diagrams, Pareto analysis, control
charts, and histograms.
• Reliability is the probability that the product will function as expected. The reliability of a product is computed
as the product of the reliabilities of the individual components.
• Companies are evaluated in seven areas, including quality leadership and performance results. These criteria
have become a standard for many companies that seek to improve quality.
• ISO 9000 is a certification based on a set of quality standards established by the International Organisation for
standardisation. Its goal is to ensure that quality is built into production processes. ISO 9000 focuses mainly
on quality of conformance.
• In this chapter we have discussed the meaning of TQM and the great benefits that can be attained through its
implementation. Yet there are still many companies that attempt a variety of quality improvement efforts and
find that they have not achieved any or most of the expected outcomes.
References
• Evans, J. R. & Lindsay, W. M., 1999. The Management and Control of Quality, 4th ed., Cincinnati: South
Western.
• Garvin, D. A., 1977. Managing Quality, New York: Free Press.
• 2009. Pareto Analysis [Video online] Available at: <http://www.youtube.com/watch?v=dENYL2mk4OE&pla
ynext=1&list=PLFA7EECB4E7DFFDD1&feature=results_video>[Accessed 27 August 2012].
• 2009. The Plan – Do – Study – Act (PDSA) Cycle [Video online] Available at: <http://www.youtube.com/
watch?v=xzAp6ZV5ml4> [Accessed 27 August 2012].
• John, V.R., 2004. Quality Management. [pdf] Available at:<http:// www.indevelopment.nl/PDFfiles/Quality
Management.pdf> [Accessed 27 August 2012].
• Anil,K.S., and Suresh, N., 2009. Operations Management. [pdf] Available at :<http:// tn.upi.edu/pdf/Operations_
Management.pdf> [Accessed 27 August 2012].
Recommended Reading
• Goetsch, D. L. & Stanley, D., 1995. Implementing Total Quality, Upper Saddle River, N. J: Prentice-Hall.
• Hall, R., 1977. Attaining Manufacturing Excellence, Burr Ridge III: Down-Jones Irwin.
• Juran, J, M., 1977. Quality Control Handbook, 4th ed., New York: Free Press.
85/JNU OLE
Operation Management
Self Assessment
1. The category consists of costs necessary for achieving high quality, which are called costs.
a. quality control
b. prevention
c. appraisal
d. quality failure
2. ____________ includes quality planning costs, such as the costs of developing and implementing a quality
plan.
a. Appraisal costs
b. Internal failure costs
c. Prevention costs
d. External failure costs
5. In 1977 the International Organisation for Standardisation (ISO) published its first set of standards for quality
management called ________.
a. ISO
b. ISO 9001
c. ISO 9000
d. ISO 14000
6. In 1996 the International Standards Organisation introduced standards for evaluating a company’s environmental
responsibility called as_______.
a. ISO
b. ISO 9000
c. ISO 14000
d. ISO 9001
7. Which of the following phases explains the data are evaluated to see whether the plan is achieving the goals
established in the plan phase?
a. Plan
b. Do
c. Study
d. Act
86/JNU OLE
8. _____________ is the sequence of steps involved in an operation or process.
a. Checklist
b. Flowchart
c. Control charts
d. Cause and effect diagrams
9. Technique used to identify quality problems based on their degree of importance is known as
______________.
a. Pareto analysis
b. Statistical process control
c. Histogram
d. Scatter diagrams
10. In which type of diagrams or charts are the upper control limit and the lower control limit reflected?
a. Scatter charts
b. Histograms
c. Control charts
d. Statistical Process control
87/JNU OLE
Operation Management
Chapter VIII
Project Planning and Work Breakdown Structure
Aim
The aim of this chapter is to:
Objectives
The objectives of this chapter are to:
Learning outcome
At the end of this chapter, you will be able to:
• identify various problems incurred in the project implementation and its control
• understand the importance of Work breakdown structure to take decisions in planning process
88/JNU OLE
8.1 Introduction
A project is temporary endeavour with a finite completion date undertaken to create a unique product or service.
Projects bring form or function to ideas and needs.
Examples of project
• Commissioning a new industrial unit
• Construction of house
• Setting up an office
• Developing a technology
• Launching a new product in the market
As we know, that the planning is an important management function without which it is difficult to manage and
getting things done. So, in every manufacturing and service industry the various projects are worked out to achieve
particular goal of a company, whether it is long term or short term.
Project
Management
Project
Project Scope Project Time
Integrated Mgmt
Mgmt Mgmt
Project
Project Risk Executing
Communication
Mgmt Process
Mgmt
89/JNU OLE
Operation Management
8.4.1 Scoping
The main objectives of scoping are:
• Define the project boundaries
• Explicity stating objectives what the project will cover
• Implicity providing direction to the project and enabling assessment of the final products quality
For any project work to be undertaken, it is good practice to prepare an outline of the project. The outline comprises
following points:
• Describe the relevant context for the project
• Indicating purpose and objective of project
• Making list of all task pertaining project along with target time
90/JNU OLE
8.4.2 A Typical Outline of the Task
• Development of plan and approval of the plans
• Literature survey
• Data collection
• Data analysis
• Findings
• Interpretation and conclusions
• Recommendation on the project and presentation
• Documentation of report
• Use of gantt-chart of tasks to monitor and control project deliverables
• Identify strengths and weaknesses of project
The plan should be tracked throughout for which various checklists could be used. The value of certain parameters
must be measured.
91/JNU OLE
Operation Management
Key stakeholders
• identify management level personnel who are official to the success
• document the responsibilities of stakeholders
Stage teams
• identify appropriate personnel required for the stage, define the team structure and appoint team leaders
• document the time commitment and responsibilities to be performed by the team members
Key resources
• Individuals assigned to a key resources role may work towards gathering “Business Key Resources and “Technical
Key Resources”
92/JNU OLE
Planning
Initiating
Processes
Processes
Controlling
Executing
Processes
Processes
Closing
Processes
Planning processes
• It has major importance
• These are highly interdependent
Executing processes
• It depends on the nature of the work
• They are dynamic and dependent on team innovation
Controlling processes
• It includes, Measuring project performance
• Identifying variances from the plan
• Updating project plans
• Taking corrective action
Closing processes
• Review of the project
• Findings
• Analysis of the project performance with respect to various processes
8.6.4 Customisation
• Large project may need details.
• Smaller project may need relatively less details
• Resource identification might be required for scope definition.
93/JNU OLE
Operation Management
Project Initiation
Assessment of tenders
Commencement of Work
Commissioning
Final Documentation
94/JNU OLE
Summary
• A project is a temporary endeavour with a finite completion date undertaken to create a unique product or
service.
• Projects bring form or function to ideas or needs.
• A good project management methodology provides a framework for the processes
• Project key stages from the highest level of the WBS, which is then used to show the detail at the lower levels
of the project.
• Each key stage comprises many tasks identified at the start of planning and later this list has to be validated.
• WBS is produced by identifying the key elements, breaking each element down into component parts and
continuing to breakdown until manageable work packages have been identified. These can be allocated to the
appropriate person.
References
• Gopalkrishan, P. & Sundaresan, M., 1977. Materials Management, An Integrated Approach, New Delhi:Prentice
Hall.
• Panneerselvam, R., Production and Operations Management, India: Prentice Hall.
• The Typical Phases in Project Management , [Video online] Available at: <http://www.youtube.com/
watch?v=sLgdRO5IS9U> [Accessed 31 August 2012].
• Work Breakdown Structure, [Video online] Available at: <http://www.youtube.com/watch?v=PTVECJn59Bg>
[Accessed 31 August 2012].
• TutorialsPoint.com., 2012. Just-In-Time Manufacturing (JIT), [Online] Available at: <http://www.tutorialspoint.
com/management_concepts/just_in_time_manufacturing.htm> [Accessed 31 August 2012].
• Peter, H.D., 1996. [Online] Available at: <http://www.colorado.edu/geography/gcraft/notes/lifecycle/lifecycl_f.
html> [Accessed 31 August 2012].
Recommended Reading
• Norman, G. and Fraizer, G., Operations Management, 9th ed., Thomson South Western.
• Krajewski, L. and Ritma, L., Operations Management, Processes and Value chains, 7th ed., India: Prentice
• Hall.
• Drucker, P., 1981. Managing Turbulant Times, London: Pan books.
95/JNU OLE
Operation Management
Self Assessment
1. A project is temporary venture to create a unique ___________.
a. Product
b. Service
c. Idea
d. Product or Service
2. Project integration management, cost management, communication management, Project scope management,
quality management, risk management, Project time management, human management, procurement management
are _________.
a. PM Knowledge Areas
b. PM Knowledge Forms
c. PM Knowledge Links
d. PM Knowledge Outputs
3. If Project objective is not in line with ________ objective then Project fails.
a. production
b. suppliers
c. organisation
d. customer
4. The systematic arrangement of activities within particular framework of project and on the desired parameters
with expected result, is called ___________.
a. project management
b. project scheduling
c. project planning
d. project scheming
6. These are the series of activities to achieve the target are called as_________.
a. project processes
b. process groups
c. process interaction
d. customisation
7. In process groups, ________ deals with monitoring and measuring progress and taking remedial action.
a. planning process
b. executing process
c. controlling process
d. closing process
96/JNU OLE
8. ___________deals with Devising and maintaining a workable scheme to accomplish the business need.
a. Planning processes
b. Executing processes
c. Controlling process
d. Closing processes
9. In Process interaction, the mechanism applied on to the inputs created by desired outputs is known
as________.
a. inputs
b. tools and techniques
c. outputs
d. transformation
10. Which of the following is the technique to analyse the content of work and cost by breaking it down into its
component parts?
a. Project scoping
b. Work breakdown structure
c. Process interaction
d. Customisation
97/JNU OLE
Operation Management
Chapter IX
JIT, Lean Manufacturing, Six-Sigma
Aim
The aim of this chapter is to:
Objectives
The objectives of this chapter are to:
Learning outcome
At the end of this chapter, you will be able to:
98/JNU OLE
9.1 Introduction
The primary goal for the company is customer’s satisfaction and if company cannot reach perfection in this area
then all the processes are worthless.
• All parts of the value chain and everything in the enterprise must be healthy for realisation of competitive
business processes.
• If the company wants strong and long lasting value chain all the links within the chain must be prepared to
overpass all existing problems.
• One of the most important links inside that value chain is definitely logistics. Logistics is concerned with the
physical distribution and storage of products and services.
• During the 20th century several approaches of implementation of logistics were developed. Surely, one the most
famous and most important logistics concept is the Just-In-Time concept.
99/JNU OLE
Operation Management
Demand
Production
Consumption
Supply
Buffer
100/JNU OLE
Lean Flexible System Buffered/Rigid System
(Just-In-Time System) (Just-In-Case system)
Customer orders pulls product through The system pushes the product
Production System
the factory through the factory
Small batches are made with reduced Large batches are made due to high
Production Lot Size
setup time setup time
Process designed after product has
Process Design Concurrent engineering design is applied
been designed
High turnover with minimum inventory Low turnover due to high inventory
Inventory Turnover
level level
Fewer number and they are helped
Suppliers Suppliers are kept at arms length
informed and kept close
Multi skilled, flexible and work well in
Employees Specialised and with strict work rules
teams
Empowerment of workers enables quick
Decision-making Centralised at management level
response
Quality Everyone’s responsibility Q.C. inspectors job
Emphasis is on small but continuous
System Improvement “If it isn’t broke, dont fix it” attitude.
improvement
There are several problems, which are connected within JIT concept.
• The major problem with JIT operation is that it leaves the supplier and downstream consumers open to supply
shocks.
• With shipments coming in sometimes several times per day, the company is especially susceptible to an
interruption in the flow. For that reason, some companies are careful to use two or more suppliers for most of
their assemblies.
• The hidden costs are present and they include labour union leverage, problems with flexible manufacturing
systems (FMS), problems developing for the flexible workforce, difficulties with supplying commodities
using
• JIT, increased expenses for suppliers.
101/JNU OLE
Operation Management
There are several general guideline steps for easier JIT implementation. The following algorithm shows what the
company has to do if it wants to implement the JIT concept.
1. Top management must accept idea of the JIT.
Without their permission it is not possible to move on with the whole process. They are responsible for ensuring
financial resources for the project. Perhaps the most difficult thing for engineers is to convince managers that
the company under consideration really needs implementation of the JIT concept in order to improve business
processes.
Convincing managers to allow evaluation of JIT is not only a problem that comes from human.
2. Second step for a company is success which is connected with the fact that employees also have to understand
significance of the new concept.
Very important in this step is to explain to workers that JIT is not some kind of bad monster and not something
unimportant for their work. It is desirable to hold a series of training sessions to familiarise employees with the
fundamentals of the JIT concept.
When we succeed once to explain to our human resources the importance of the new concept and if they become
cognizant about it, now it is possible to continue.
3. The third step would be the setup of ERP (Enterprise Resource Planning).
ERP is a system which integrates all data and processes of an organisation into a single unified system.
It is impossible nowadays to run successful production without strong support of an information system.
So, it means that ERP requests the software and hardware systems with a secure and huge data base which is
able to collect all information about resources.
With a centralised data base it is much easier to manage all enterprise resources. It is especially important
for logistics because, as we mentioned before, logistics can be considered as a tool for getting resources, like
products, services, and people, where they are needed and when they are desired.
If the ERP system is well established, the next step would be to test our own system.
Now all preconditions of the JIT implementation are considered and we are trying to figure out: are there
any difficulties to start with implementation. In this step one question comes up: “Is the system ready for JIT
implementation?”.
When the answer is NO, it is recommendable to go back and do changes. If the answer is YES, everything is
prepared for the implementation process.
Apropos the technical and physical parts of the implementation, maybe the most important thing which is worth
of mentioning is that during the process the organisation must not rush.
4. The last step is testing and control. For successful existence and developing of the JIT system there must be
continuous control. Without control things can sway from the right direction. Of course, feedback loops also
exist and they are very important for the whole process.
102/JNU OLE
Management
Employees
ERP
Implementation of
JIT
Just as a mass production is recognised as the production system of the 20th century lean production is viewed as
the production system of the 21st century.
103/JNU OLE
Operation Management
104/JNU OLE
9.7 Key Feature of Lean Production
Following are the characteristics of a lean enterprise
• Reduced Setup Cost and Times (for semi-versatile machinery such as big stamping presses) – from months to
hours thus making small-lot production economically viable; achieved by organising procedures, using carts,
and training workers to do their own setups,
• Small-Lot Production – allowing higher flexibility and pull production (or just-in-time manufacturing)
• Employee Involvement and Empowerment – organising workers by forming teams and giving them training
and responsibility to do many specialised tasks, for housekeeping, quality inspection, minor equipment repair
and rework; allowing also them time to meet to discuss problems and find ways to improve the process
• Quality at the Source – total quality management (TQM) and control; assigning workers, not inspectors, the
responsibility to discover a defect and to immediately fix it; if the defect cannot be readily fixed, any worker
can halt the entire line by pulling a cord (called jidoka)
• Pull Production, or Just-In-Time (JIT) – the method wherein the quantity of work performed at each stage of
the process is dictated solely by the demand for materials from the immediate next stage; thus reducing waste
and lead times, and eliminating inventory holding costs
• Continuous Equipment Maintenance – as pull production reduces inventories, equipment breakdowns must also
be reduced; thus empowered operators are assigned primary responsibility for basic maintenance since they are
in the best position to detect signs of malfunction
• Multi- Skilled Workforce – as employees are empowered to do many jobs, they must be provided with adequate
training
• Supplier Involvement – the manufacturer treats its supplier as a long-term partners; they often must be trained
in ways to reduce setup times, inventories, defects, machine breakdowns, etc. in order to enable them to take
responsibility for delivering the best possible parts/services to the manufacturer in a timely manner.
However, by continually focusing on waste reduction, there are truly no end to the benefits that can be achieved.
105/JNU OLE
Operation Management
• Flows: Flows are characterised by time, cost and value. Resources (labor, material and construction equipment)
and information flows are the basic units of analysis.
• Pull: At a strategic level, pull identifies the real need to deliver the product to the customer as soon as he needs
it.
• Perfection: To achieve perfection means constantly considering what is being done; how it is being done and
harnessing the expertise and knowledge of all those involved in the processes to improve and change it. With
continuous improvement done and with waste eliminated along the flow process, perfection is the ultimate sweet
reward that companies can achieve.
9.11 Six-Sigma
Six-Sigma is a long-term, forward-thinking initiative designed to fundamentally change the way corporations do
business. It is first and foremost “a business process that enables companies to increase profits dramatically by
streamlining operations, improving quality, and eliminating defects or mistakes in everything a company does.
While traditional quality programs have focused on detecting and correcting defects, Six Sigma encompasses
something broader: It provides specific methods to re-create the process itself so that defects are never produced
in the first place.”
106/JNU OLE
• The practice of piecemeal thinking with respect to various improvement initiatives is a serious issue and the
failure of integrating business process thinking with Six Sigma methods, results in firms incurring such significant
opportunity costs that it is downright tragic.
• Integrating Six Sigma with business process management principles will help you realise significant opportunities
versus the traditional methods of implementing a Six Sigma program.
On the other hand, process improvement methods would benefit from the rigor of Six Sigma measurement techniques
and its disciplined training regime.
Six Sigma focuses on making improvements in all operations within a process, producing results more rapidly and
effectively
107/JNU OLE
Operation Management
108/JNU OLE
Summary
• If the company wants to have a JIT concept it does not mean that everything must be done very fast. The most
important thing for the company is to have good organised resource allocation.
• Also, the management and employees must have on their mind that this concept can help the organisation to
solve many problems in logistics.
• It is true that implementation and development of JIT is a long-lasting and expensive process, but if the company
can manage with these difficulties it is possible to achieve high levels of workflow.
• The JIT concept is only one part in the value chain that brings the satisfaction to the customers. It means that
the JIT concept cannot solve existing problems in other organisation processes.
• Everything in enterprises is needed to be healthy, through the hierarchy of employees and all workflow processes.
Synergy is the only thing that can improve business results. And in the bottom line, the JIT concept is just one
link in the whole chain, but very important.
• Reduced set up times in warehouse - the company in this case can focuses on other processes that might need
improvement.
• Improved flows of goods in/through/out warehouse employees will be able to process goods faster.
• Employees who possess multi-skills are utilised more efficiently the company can use workers in situations
when they are needed, when there is a shortage of workers and a high demand for a particular product.
• Better consistency of scheduling and consistency of employee work hours if there is no demand for a product
at the time, workers don’t have to be working. This can save the company money by not having to pay workers
for a job not completed or could have them focus on other jobs around the
• Warehouse that would not necessarily be done on a normal day;
• Increased emphasis on supplier relationships - having a trusting supplier relationship is important for the company
because it is possible to rely on goods being there when they are needed;
• Supplies continue around the clock keeping workers productive and businesses focused on turnover – employees
will work hard to meet the company goals.
• Lean is about doing more with less. (Less time, inventory, space, labour, money)
• Lean manufacturing a shorthand commitment to eliminating waste, simplifying procedures and speeding up
production
• The five areas of Lean manufacturing or production are: Cost, Quality, Delivery, Safety and Morale.
• Five Elements to Enabling Approach ARE: Specify value, Identify and map the value stream, Flows, Pull and
Perfection
References
• Saadat, E., 2005. Human Resource Management, Tehran: SAMT Publications.
• Soltani, M., 1997. An Introduction to Production System, Mashhad: Imam Reza University Press.
• Just in time (toyota), [Video online] Available at: <http://www.youtube.com/watch?v=EBSMGYPow7g>
[Accessed 31 August 2012].
• Sixsigmamoneybelt, 2010.What is Six Sigma?, [Online video] Available at: <http://www.youtube.com/
watch?v=LcamODKt-sQ> [Accessed 31 August 2012].
• Brasad & Ritter, 2001. Introduction to Six Sigma. [pdf] Available at: <http://www.tools2improve.com/stsssample.
pdf.
• TutorialsPoint.com., 2012. Just-In-Time Manufacturing (JIT), [Online] Available at: <http://www.tutorialspoint.
com/management_concepts/just_in_time_manufacturing.htm> [Accessed 31 August 2012].
109/JNU OLE
Operation Management
Recommended Reading
• Battman, G., 2008. The First Step to Gain Superiority in Quality and Productivity.
• Brown, J., Shivnan, J. & Harhen, J., 2000. Production Management Systems (With an Integrated Attitude).
• Rahmani, M., 2006. Identifying the Effective Factors On Implementing The Just-In-Time Production System
In.
110/JNU OLE
Self Assessment
1. _______ production is a manufacturing philosophy, which eliminates waste associated with time, labour, and
storage space.
a. Lean manufacturing
b. Just-In-Time
c. Toyota Production System
d. Total Production Management
2. _________ technique was first used by the Ford Motor Company during 1920s, but the technique was subsequently
adopted and publicised by Toyota Motor Corporation of Japan as part of its Toyota production System (TPS).
a. JIT
b. Lean Manufacturing
c. Total Quality Management
d. Total Production Management
3. In which of the following systems, the Concurrent engineering design is applied to process design.
a. Flexible manufacturing system
b. Rigid manufacturing system
c. Lean manufacturing system
d. Traditional manufacturing System
4. In Just-In-Case system the system shows, Low turnover due to _____ inventory.
a. low level
b. high level
c. complex
d. rigid
5. Integrated single piece continuous workflow is one of the important characteristic of ___________.
a. JIT
b. Total quality
c. Lean manufacturing
d. Six sigma
6. Which of the following is defining a shorthand commitment to eliminating waste, simplifying procedures and
speeding up production?
a. JIT
b. Six Sigma
c. Flexible Manufacturing
d. Lean Manufacturing
7. Which of the following systems shows continuous remarkable improvements in Processes, Products and services,
Investor relations, Design methodology, Supplier relationships, Training and recruitment?
a. Lean Manufacturing
b. JIT
c. Toyota Production
d. Six Sigma
111/JNU OLE
Operation Management
8. At a strategic level, what identifies the real need to deliver the product to the customer as soon as he needs it?
a. Push strategy
b. Pull strategy
c. Perfection
d. Relational
9. In process of implantation of JIT in manufacturing, the ERP system is established only after_________.
a. understanding the process
b. understanding the new concept
c. understanding the work allocation
d. understanding the wastes
10. In which of the following systems are the small batches are made with reduced setup time?
a. Just-In-Case
b. Just-In-Time
c. Lean Manufacturing
d. Six Sigma
112/JNU OLE
Case Study I
JIT in TOYOTA
The Just in Time, JIT is a set of techniques that was first adopted and publicised by Toyota Motor Corporation of
Japan as part of its Toyota Production System (TPS).
History of JIT
The technique was first used by the Ford Motor Company during 1920s, but the technique was subsequently adopted
and publicised by Toyota Motor Corporation of Japan as part of its Toyota production System (TPS). In 1954 Japanese
giant Toyota implemented this concept in order to reduce wasteful overstocking in car production.
JIT Implementation
Back in Japan, Sakichi customised the Ford production system to suit Japanese market. He also devised a system
wherein each process in the assembly line of production would produce only the number of parts needed at the
next step on the production line, which made logistics management easier as material was procured according to
consumption. This system was referred to as Just-in-Time (JIT) within the Toyota Group.
The JIT production was defined as ‘producing only necessary units in a necessary quantity at a necessary time
resulting in decreased excess inventories and excess workforce, thereby increasing productivity.’
Benefits of JIT:
• Reduced set up times in warehouse – TOYOTA in this case focused on other processes that might need
improvement
• Improved flows of goods in/through/out warehouse employees was able to process goods faster
• Employees who possessed multi-skills were utilised more efficiently
• Better consistency of scheduling and consistency of employee work hours if there is no demand for a product
at the time
(Source: Just in Time, or JIT - Toyota’s Manufacturing Technique, [Online] Available at: <http://www.japan-101.
com/business/just_in_time.htm> [Accessed 31 August 2012]).
Questions
1. Explain the Just in Time technique.
Answer:
The Just in Time, JIT is a set of techniques that was first adopted and publicised by Toyota Motor Corporation
of Japan as part of its Toyota Production System (TPS). The JIT production was defined as ‘producing only
necessary units in a necessary quantity at a necessary time resulting in decreased excess inventories and excess
workforce, thereby increasing productivity.’
113/JNU OLE
Operation Management
114/JNU OLE
Case Study II
Ford Production System- A Lean Manufacturing
Introduction
Ford has established several innovative automobile manufacturing techniques from its beginning. In the mid 1990s,
Ford modernised its manufacturing operations in its efforts to induce more flexibility and enhance the efficiency of
its automobile production systems. The restructuring effort was known as Ford Production System (FPS).Ford was
established by Henry Ford on June 16, 1903, with an initial investment of $100,000.
LEAN Production
Lean production aimed at bringing together human, material and mechanical resources at the right time and place
to accomplish a task. It strived to eliminate every kind of waste including wastage of time, labor, scrap material,
defective parts, etc.
Questions
1. How was the Ford production system established?
2. What was the vision of FPS?
3. What do you mean by Lean Production?
4. What are the benefits of Lean Production?
115/JNU OLE
Operation Management
Introduction
By 2001, with revenues of $ 125.91 billion and net earnings of $ 13.68 billion, the US-based General Electric Company
(GE) was easily the largest diversified company in the world. Out of the company’s 24 different businesses, some
were so large that they could independently feature in the Fortune 500 list of companies.
Six sigma
Six Sigma is a long-term, forward-thinking initiative designed to fundamentally change the way corporations do
business. It is first and foremost “a business process that enables companies to increase profits dramatically by
streamlining operations, improving quality, and eliminating defects or mistakes in everything a company does. Six
Sigma is a well-structured, data-driven methodology for eliminating defects, waste, or quality control problems in
all kinds of business activities.
Objectives
• To lift internal performance
• To enable better performance by better design
• To improve the quality of purchased supplies
• To reduce the costs
Benefits
Analysts felt that the implementation of Six Sigma enabled Welch to transform an old-economy industrial giant into a
competitive and growing company. No other corporation seemed to have integrated Six Sigma in to its operations as
widely as GE. Within five years of its implementation of Six Sigma at GE produced annual benefits of more than
$2.5 billion for GE worldwide. Analysts remarked that Six Sigma was an indisputable success at GE whether in
terms of customer satisfaction, improvement in internal performance, or in the improvement of shareowner value.
Questions
1. What is Six Sigma?
2. What are the objectives of Six Sigma?
3. How was GE benefited by Six Sigma?
4. Howe was Six Sigma implemented?
116/JNU OLE
Bibliography
References
• 2008 Capacity Planning and Management [Video online] Available at: <http://www.youtube.com/
watch?v=m4NJnhekJPw> [Accessed 24 August 2012].
• 2008. Production Planning and Control [Video online] Available at: < http://www.youtube.com/
watch?v=b143Y7dTfIA> [Accessed 24 August 2012].
• 2008. Role of Models in Production Management [Video online] Available at: <http://www.youtube.com/
watch?v=-Hba1hraPlY> [Accessed 24 August 2012].
• 2008. Flexible Manufacturing System [Video online] Available at: <http://www.youtube.com/
watch?v=c7CRZZlnmKo> [Accessed 24 August 2012].
• 2009 Manufacturing Support and Services - Lean, workflow, efficiency, automation [Video online] Available at:
<http://www.youtube.com/watch?v=soF07jUhmBg> [Accessed 22 August 2012].
• 2009. Operations Management, [Video online] Available at: <http://www.youtube.com/watch?v=O1U12X-hu
sI&playnext=1&list=PL6986AF89EBEBDEA1&feature=results_video> [Accessed 21 August 2012].
• 2009. Pareto Analysis [Video online] Available at: <http://www.youtube.com/watch?v=dENYL2mk4OE&pla
ynext=1&list=PLFA7EECB4E7DFFDD1&feature=results_video>[Accessed 27 August 2012].
• 2009. Should Manufacturers adopt a Service led Competitive Strategy? [Video online] Available at: <http://
www.youtube.com/watch?v=j_bYoFlncG8> [Accessed 22 August 2012].
• 2009. The Plan – Do – Study – Act (PDSA) Cycle [Video online] Available at: <http://www.youtube.com/
watch?v=xzAp6ZV5ml4> [Accessed 27 August 2012].
• 2010 Capacity Planning 2, [Video online] Available at: <http://www.youtube.com/watch?v=Td2WpNpBJUc>
[Accessed 24 August 2012].
• 2010. Facility Layout [Video online] Available at: <http://www.youtube.com/watch?v=f721jY_MPPo> [Accessed
27 August 2012].
• 2012. Introduction to Operations Management 1, [Video online] Available at: <http://www.youtube.com/
watch?v=skg_lg-4m2o> [Accessed 21 August 2012].
• Aswathappa, K. & Bhat, K. S., 2010. Production and Operations Management, Introduction to Operations
Management, 2nd ed., Himalaya Publishing House,
• Aswathappa, K., 2010. Production and Operations management- Manufacturing and Service operations,
Himalaya publishing House.
• Aswathappa, K., 2010. Production and Operations management- Production Planning Control, Himalaya
publishing House.
• Anil,K.S., and Suresh, N., 2009. Operations Management. [Pdf] Available at :<http:// tn.upi.edu/pdf/Operations_
Management.pdf.
• Bitner, M. J., 1992. The Impact of Physical Surroundings on Customers and Employees. Journal of
Marketing.
• Brasad & Ritter, 2001. Introduction to Six Sigma. [Pdf] Available at: <http://www.tools2improve.com/stsssample.
pdf.
• Evans, J. R. & Lindsay, W. M., 1999. The Management and Control of Quality, 4th ed., Cincinnati: South
Western.
• Francis, R. L. & White, J. A., 1992. Facility Layout and Location: An Analytical Approach, Englewood Cliffs,
NJ: Prentice Hall.
• Garvin, D. A., 1977. Managing Quality, New York: Free Press.
• Gopalkrishan, P. & Sundaresan, M., 1977. Materials Management, An Integrated Approach, New Delhi:Prentice
Hall.
117/JNU OLE
Operation Management
Recommended Reading
• AN International journal of the Production and Operations Management, POM Journal.
• Arora, K. C., 2004. Production and Operations Management, Service Operations, Firewall Media.
• Battman, G., 2008. The First Step to Gain Superiority in Quality and Productivity.
118/JNU OLE
• Bitner, M. J., 1992. Servicescapes: The Impact of Physical Surroundings on Customers and Employees Journal
of Marketing.
• Bollinger, S., 1998. Fundamentals of Plant Layout, Society of Manufacturing Engineers in Association with
Richard Muther and Associates
• Brown, J., Shivnan, J. & Harhen, J., 2000. Production Management Systems (With an Integrated Attitude).
• Buffa, E. S., 1988. Modern Production Management, New Delhi: Wily.
• Charantimath, P., 2003. Total Quality Management, Pearson Education, New Delhi.
• Drucker, P., 1981. Managing Turbulant Times, London: Pan books.
• Everette, A. E, Jr. & Ebert, R. J., 2003. Production and Operations Management - Concepts Models and
Behaviour, New Delhi: Pearson Education.
• Francis, R. L. & White, J. A., 1992. Facility Layout and Location: An Analytical Approach. Englewood Cliffs,
NJ: Prentice Hall.
• Gaither, N. & Fraizer, G., 2002. Operations Management-Overview, 9th ed., Thompson Learning.
• Goetsch, D. L. & Stanley, D., 1995. Implementing Total Quality, Upper Saddle River, N. J: Prentice-Hall.
• Hall, R., 1977. Attaining Manufacturing Excellence, Burr Ridge III: Down-Jones Irwin.
• Johnson, R., 1982. Spacecraft for Multi-Floor Layout Planning.
• Juran, J, M., 1977. Quality Control Handbook, 4th ed., New York: Free Press.
• Kolli, S., Essentials of Production and Operations Management, Research and entertainment Association.
• Krajewski, L. & Ritma, L., Operations Management, Processes and Value chains, 7th ed., India: Prentice
• Krajewski, L., Ritzman, L. P. & Malhotra, M, K., 2009. Operations Management: process and supply chain,
Operations Management, Prentice Hall Publication.
• Meyers, F. E., 1993. Plant layout and material handling, Regents/Prentice Hall.
• Murthy, P. R., 2006. Production and Operations Management, Introduction to Operations Management, New
Age International Publishers, 2nd ed.
• Muther, R. & Wheeler, J. D., 1962. Simplified Systematic Layout Planning. Industrial Engineering and
Management Press, Institute of Industrial Engineers.\
• Norman, G. & Fraizer, G., Operations Management, 9th ed., Thomson South Western.
• Rahmani, M., 2006. Identifying the Effective Factors On Implementing The Just-In-Time Production System
In.
119/JNU OLE
Operation Management
Chapter II
1. b
2. b
3. c
4. a
5. c
6. b
7. d
8. b
9. d
10. b
Chapter III
1. c
2. d
3. c
4. a
5. d
6. a
7. b
8. a
9. b
10. b
Chapter IV
1. c
2. d
3. b
4. b
5. c
6. b
7. a
8. c
9. a
10. c
120/JNU OLE
Chapter V
1. c
2. b
3. c
4. a
5. b
6. c
7. b
8. d
9. b
10. c
Chapter VI
1. b
2. c
3. a
4. d
5. b
6. c
7. a
8. c
9. a
10. c
Chapter VII
1. a
2. c
3. a
4. b
5. c
6. c
7. c
8. b
9. a
10. c
Chapter VIII
1. d
2. a
3. c
4. c
5. b
6. a
7. c
8. a
9. b
10. b
121/JNU OLE
Operation Management
Chapter IX
1. b
2. a
3. a
4. b
5. c
6. d
7. d
8. b
9. b
10. b
122/JNU OLE