Egatra: Quality Control
Egatra: Quality Control
TANK D101-1
REPAIR AND CLEANING SERVICES PBL- 2017 -056
DOCUMENT NO.
6 Sheets
EGATRA 002/QC/P roced u re/G KP I 2017
a
" ffffi*'ry'r*r,
Aactre
rlii
I TANK D101.1 REPAIR AND CLEANING RA
Ii. I
i SERVICES
PBL-2017-056
I. SCOPE
a. lnspection and test of equipment shall be basen ofl approved drawing and applieable
procedur"es.
b. The Quality Control Department shall responsible for the following but not limited to:
- Continuous check for all production process during the whole fabrication periods.
- Conduct all required tests, checke, and inspeetion.
- Maintain teh record for all the Quaiity Control Document for reviedreference at all
times ancifinalMDR.
II. REFERENGE
e. Repair material shall be meet Client specification and repair procedure approved by
l.\lian+
t/[u! lr.
f. lnspection result shall be repoded in Material Receiving Repoft.
V, MATERIAL CONTROL
a. After material received inspection has been conducted and material been accepted, the
Warehouse Sc.ction shall store the nrcterial and issue to the fabrication section upon
instruction.
b. The rnaterial received by Warehouse Section and material issue for fabrication shall be
continuously reported to Project Cor:trol.
c. The excess ravr maierial fronr the fabrication section slrall cleariy be iderntified and
o rJ
returned to the Warehouse Section for restore.
Str,l':k inat$.!"ial or.r u/ilr()horrse shall tle checkcd for visua! and dimension by Qttalitv
Cor:troi. Ir,iaterial slior-ri,j be store in secure place to presetve the accuracy and Qualityr
before process fabrication.
Marking.
1. Giving the mark OK, if result of mark is conect.
2. A{ter giving mark OK, we cafl do the next process.
e Dimension.
1. Checking the "MAL" accorCing on the piace.
2. MAL made the duplicated equipment as sarne as one from paperlptywood.
3. ldentify that the $IAL has been rnade and checked in accordance to drawing approval.
4. Only approved MAL will be used for fabrication proeess (marking, cutting, bending,
rolling, and beveling).
5. Progiesaive dimensional check sltal* be coilducted at stages before, during, a*d after
the m anufacturin g prrcess-
6. Dimensional mar.king shall be checked prior to cutting, beveling, bending, and rolling.
After part or final assernbling, alt dimensional marks are to be reconfirmed for
accuracy prior to further works such as reforming, etc. in which the dtrnensional
inspction shall be conducted.
7. All measuring tools tro be used for meaeuring and inspcc'tions shall be ealibrated by
an Authorized .fuency. The calibration records shall be kept as a QA records.
L Check with measuring tools all dimensional of individual members/shop assemblies,
within the specified tolerance.
QUALITY CONITROL PROC EDU RE
PEL-2017-05S
Dimension tolerance lor steel structure fabrication shall be accordance with client
specification.
a b.
appr<.rved by Contract'or and Conrpany.
All fabricated parst shall be inspected as to the following:
- Visual inspection.
- Wr:lding inspec:tior-: shal! ertsure all paranteter and condition.
- As per WPS/PQR and welder iras been fulfill before welding, during, and after
welding.
- Ail wclding will be visually inspected to checked if that there are defect such as
undercut, crack, blow hole, slag inclusicn, and fused spatter.
- All parts shal! be thorcughly cleaned. All dirts, weiding electrode stubsand foreign
matter shal! be removed.
- The leg size of fillet should be in accordance with the design stipulation.
- Formed oorner of bracket shall be visuelly cheeked, and shall be no crack or harmful
defects is prociucecJ
- Welding tolerance shall be accordance with client specification.
NDE
- Non D*striictive Exaniination (Nfit) of pressure boundary rryeld anci attachrnent
wekls to pressure boundary shall be done in accordance with the approved NDE
procedure
c. When PWHT and hardness test is required, therefore Siibcontractor shall maintain these
activities to t:omply* with the approved procedures.
d. inspection resuii shall be r"eported irr iite Weiding lnspectiott iieport form.
a All surfaces prepared for painting are to be inspected and the surface preparation
siarCarc-i and paini used sllali t)e r':vieir-,cd and approvod by Contractor pr"ior io the stad
cf [ire rvork
t) Contractor shall tre notified of any defects, improper material or workmanship or any
conditiorrs which affect the seiisfactory pcrfcrrnancc arril peirTrailerret! of u,,oi'k.
No woi'k shaii proceecJ at arty sta!,^es of the .!ob untii ttrc foliorviirg stage insp*ctirlris lravr.:
been carried out and approved:
1 Sefere blasting.
.'[hrl surf;-rce :;hall cL=riineci froin dirt, tju.st, and ot[rer foreign irtattei-
QUALITY GONTROL PROEEDURE
RA
PBL-2017-056