This document contains a progress plan versus actual chart for a project from May 2012 to August 2013. It shows the planned and actual cumulative progress curves over time. The actual progress in May was 0.5% while planned was 0%, and no progress was made in the subsequent months as planned or actual according to the chart.

Uploaded by

silence_10007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
112 views

Template For Actual Vs Planned Graph

This document contains a progress plan versus actual chart for a project from May 2012 to August 2013. It shows the planned and actual cumulative progress curves over time. The actual progress in May was 0.5% while planned was 0%, and no progress was made in the subsequent months as planned or actual according to the chart.

Uploaded by

silence_10007
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Progress Plan Vs Actual/Forecast

Month May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12

PlannedTotal Progress Curve

PlannedTotal Progress Monthly 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

Actual Progress Cumm.Curve

Actual Progress Curve monthly 0.50% 0.00% 0.00% 0.00% 0.00% 0.00%

PlannedTotal Progress Curve


Actual Progress Cumm.Curve

May-12 Jun-12 Jul-12 Aug-12 Sep-12 Oct-12 Nov-12


Nov-12 Dec-12 Jan-13 Feb-13 Mar-13 Apr-13 May-13 Jun-13 Jul-13 Aug-13

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 5.65%

0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 5.16% 3.96% 3.07%