0% found this document useful (0 votes)
49 views

Mechanical: Department PR No. Indented by Date

This purchase requisition requests materials and services for the Mechanical department. It lists the material code, description, quantity requested, and any special instructions for each item. The requisition must be approved by the department head, head of department, and president or CEO before any purchase can be made.

Uploaded by

raju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views

Mechanical: Department PR No. Indented by Date

This purchase requisition requests materials and services for the Mechanical department. It lists the material code, description, quantity requested, and any special instructions for each item. The requisition must be approved by the department head, head of department, and president or CEO before any purchase can be made.

Uploaded by

raju
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PURCHASE REQUISITION

DEPARTMENT Mechanical PR NO.

INDENTED BY DATE:

Work Area:

Materials / Services required for:

Material Quantity Remarks / Special


S. No. Material Description UOM
Code Requested Instrcutions

Requested by Approved by Approved By

Department HOD President/CEO

You might also like