0% found this document useful (0 votes)
406 views5 pages

Hoisting and Rigging Plan: Location: Date of Lift: Load Description: Lift Director Ordinary: Critical: Multiple Cranes

This hoisting and rigging plan summarizes the logistics for lifting a load. It identifies the location, lift director, crane details including type, capacity and configuration, rigging components like slings and shackles, intended lift load weights, personnel assignments, lift procedures, and a pre-lift checklist to verify safety checks. The multi-page document provides thorough planning to execute the lift safely.

Uploaded by

Afdal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
406 views5 pages

Hoisting and Rigging Plan: Location: Date of Lift: Load Description: Lift Director Ordinary: Critical: Multiple Cranes

This hoisting and rigging plan summarizes the logistics for lifting a load. It identifies the location, lift director, crane details including type, capacity and configuration, rigging components like slings and shackles, intended lift load weights, personnel assignments, lift procedures, and a pre-lift checklist to verify safety checks. The multi-page document provides thorough planning to execute the lift safely.

Uploaded by

Afdal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

Hoisting and Rigging Plan

Location: Date of Lift:


Load Description:
Lift Director
Ordinary:  Critical:  Multiple Cranes: 

NOTE: If lift requires multiple cranes, a lift plan for each crane must be filled out, reviewed, and approved by the lift coordinator.

A. CRANE D. RIGGING
1. Type of Crane: 1. Sling Selection
2. Crane Capacity: ______________Tons a) Number of Slings in Hook-up:
3. Lifting Arrangement Crane #1
1. Radius @ pick up location: ft. b) Sling Type WR___ FW____ RS____
Chain____
2. Radius @ set down location:. ft.
c) Sling Size: _______________
3. Length of Boom: ft.
d) Sling Length: ___________________
4. Angle of Boom Pickup: deg.
e) Rating Capacity of Sling: ________________
5. Angle of Boom Set down: deg.
6. Rated Capacity From Chart f) ) Softeners Required Yes  or No 
Over Rear: _ _ _ _ _ _ _ _ l b s . 2. Shackle Selection
Over Front: _ _ _ _ _ _ _ _ l b s . a) Capacity: _____________tons
Over Sides: _ _ _ _ _ _ _ _ l b s . b) Number of Shackles: ____________
Lift is __________ % of Cranes Rated Capacity

B. JIB Erected  Stowed  E. INTENDED LIFT LOAD


1. Load Condition New ____ Used _____
Length of JIB: ____________ ft.
2. Wt. of Load ____________ lbs.
Rated/Capacity of JIB (Chart): lbs. 3. Wt. of Aux Block ____________lbs.
C. HOIST ROPE 4. Wt. of Main Block ____________lbs.
Rope Diameter:______ Number of Parts_____ 5. Wt. of Lifting Beam ____________lbs.
6. Wt. of Sling/Shackles ____________lbs.
Rated Capacity based on parts: lbs. 7. Wt. of Jib/Ext. (erected/stowed) _______lbs.
D. CRANE PLACEMENT 8. Wt. of Hoist Rope _______lbs.
9. Wt. Excess Load Material _______lbs.
1. Foundation ___________________________
2. Electrical Hazards in Area?________________ Total Weight ________lbs.
______________________________________________________
Source Of Load Wt. Information:
3. Obstructions to Swing or Lift?______________ ________________________________________
______________________________________________________ Load Wt. Confirmed by: ____________________
4. Swing Direction and Degree (Boom Swing)_ F. PRE LIFT CHECKLIST
______________________________________________________

5. Travel with Load Required _______________ 1. See page 5 of Hoist and Rigging Plan

Signature Date
Crane Operator
Lead Rigger
Project Engineer
Lift Director
Site Supervisor

Page 1 of 5
Hoisting and Rigging Plan

Location: Date of Lift:


Load Description:
Lift Director

Load Travel Path / Personnel Placements

Page 2 of 5
Hoisting and Rigging Plan

Location: Date of Lift:


Load Description:
Lift Director

Load Schematic and Rigging Method

Page 3 of 5
Hoisting and Rigging Plan

Location: Date of Lift:


Load Description:
Lift Director

Personnel Assignments and


Load Handling Sequence & Procedures

Page 4 of 5
Hoisting and Rigging Plan – Pre-Lift Checklist

(Section 4.12 Critical Lift Permit Duration = 1 month)

DATE Qualified Qualified Designated Outriggers Crane Swing Overhead Tag Line Load Work Area Softeners Current Lift Supervisor’s Name
Crane Rigger(s) Signaler / Fully Inspection Room Hazards Used Chart in Barricaded Required wind
Operator Spotter Extended Records Hazards Present Crane or speed
Available Present Guarded allowable
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No
Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No Yes / No

Page 5 of 5

You might also like