0% found this document useful (0 votes)
159 views

Indian Patent Stone (IPS)

The document outlines the workflow for toilet waterproofing which includes surface cleaning, haunch/vata making and crack filling, mother slab ponding, leakage checking and repairing, reponding testing, applying chemical coats and fixing mesh/tape, more ponding, screed/base coat application, plumbing line installation, gabda packing and brick laying, more ponding and screeding, curing and handover. It notes that plumbing works must be completed before waterproofing coating and no cutting after coating.

Uploaded by

Aniket Dhake
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
159 views

Indian Patent Stone (IPS)

The document outlines the workflow for toilet waterproofing which includes surface cleaning, haunch/vata making and crack filling, mother slab ponding, leakage checking and repairing, reponding testing, applying chemical coats and fixing mesh/tape, more ponding, screed/base coat application, plumbing line installation, gabda packing and brick laying, more ponding and screeding, curing and handover. It notes that plumbing works must be completed before waterproofing coating and no cutting after coating.

Uploaded by

Aniket Dhake
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Work Flow Chart - Toilet waterproofing

Surface Cleaning (Grinding if required)

Haunch/Vata Making,Cracks filling with Ready Mix Polymer modified mortar or


site mix PMM

Mother slab Ponding(2Day)

Leakage checking
YES

Repairing by injection grout or crack


filling with repair mortar which ever is
applicable
NO
Reponding Testing

Lakages testing found ok

Apply 1st coat of Chemical coat (Horizonatal + vertical) For Shower Fixing Glass
area Full wall coating and other area 1m from FFL fiber mesh /
Waterproofing
Apply 2nd coat of 2nd coat of Hydrocem at an interval of 8-10 hours tape on Haunch
of after finish1st coat (Horizonatal + vertical) / vata

Water ponding (2days)

Found ok

Screed / Base coat

Water ponding (2days)

Plumbing line installation for PVC line

Gabda packing and Brick bat laying work.

Ponding (2days)

Screeding

Curing and Handover

Note: It is mandatory that all works of plumbing and sanitation (Making Cut out, fixing sleeve) must be complete
before taking up application of Waterproofing coating. It is not recommended damage or core cut in wall after
finish coating work.
Chemical Recoomended :-Elastomeric acrylic reinforced cementitious, waterproofing coating for
concrete and masonry surface.
Manufacture
Name of chemical.
Name
Dr.Fixit Dr.Fixit Fastflex
BASF Masterseal551EL
SUNANDA Polyalk Wp
Chougule Acrylflex 2k strong
MYK AquaArm Saniflex
Asianpaint Damp block 2k

You might also like