1.00 SUMMARY
E. Carpentry Works
Ceiling Supply and Installation
Control room
Storage
Office
Living Quarters & Toilet& Bath
Cabinet- 3/4 Plyboad wrap with vinyl sheet( Laboratory)
Countertop - 3/4 Plyboard with Vinyl wrap
F. Doors and Window
Supply and Install
D1 - Single swing Solid Core Panel Door (Office);800mm x 2100mm
D2 - Single Swing Hollow Core Flush Door (Pantry)-750mm x 2100mm
D3- Single Swing Hollow Core Flush Door (Living Quarter)-800mm x 2100mm
D4 - Single Swing Hollow Core PVC Door With Louvers (T&B)-700mmx2100mm
D5- Single Swing Hollow Core Flush Door (Lab,Pantry & Storage)-800mmx2100mm
D6 - Sliding Door (Storage)-800mmx2100mm
W1 - Analok framed sliding glass window (Office)1500mmx1200mm
W2 - Aluminum framed Jalousie Glass window ( Living Q & Laboratory)-1200mmx1
W3 - Aluminum framed Jalousie Glass window ( T&B)-500mmx600mm
W4 - G.I. Louvered fixed window (Control Panel Room) - 1200mmx600mm
MWD1 - Double Swing Steel Pipe Framed Mesh Wire Door
MWD2 - Double Swing Steel Pipe Framed Mesh Wire Door
MW1 - Steel Pipe Framed Wire Window
MW2 - Steel Pipe Framed Wire Window
MW3 - Steel Pipe Framed Wire Window
G. Structural works
Supply and Install
Trusses
Angular bar 1.5" x 1.5" x 3/16" thk. X 6m
Angular bar 1" x1" x 3/16"thk. X 6m
Purlins- 2" x 4"
Sag rods - 12mm x 6m round bar
Insulation foams double foils 9mm thick
H. Tinsmintry Works
G.A. # 26 Pre-Painted Corruated roofing sheet
Ridge roll-8ft
G.A. # Pre - Painted Gutter box type-8ft
Fascia Board 8" Cement Board 3/4" thk.-8ft
I. Painting works
Walls Semi Gloss Latex Paint Finish
Ceiling Matt Finish
J. Sanitary, Sewage and Plumbing works
Sanitary System
Lavatory with pedestal
Water Closet
Kitchen Sink(Laboratory)
floor drain
4" diameter Clean out PVC Pipe
2" P-trap
Solvent 1000 cc
WYE 4" x 2"
100mm diameter 45 Deg Elbow
Water System
25mm diameter PVC blue pipe
Teflon tape
Gate Valve 25mm diameter
Flow meter 25mm
Check Valve 25mm
12.5mm diameter PVC blue pipe
Faucet
Tee 25mm x 12.5mm
Tee equal 25mm
Copupling 12.5mm pvc
Elbow 45 deg 12.5mm diameter
Sewage System
Septic Vault
Foundation
Concrete
Rebars
Formworks
Side walls
CHB laying 6"
Rebars - 10mm diameter
Plastering
Manhole cover
Concrete
Rebars
Formworks
Fittings
100mm diameter tee equal PVCSP
100mm diameter Clean Out
Sub -Total IV
Prepared by:
Mark Roger R. Huberit II
Company Engineer
Checked by:
Von Suba
SPD - Project Manager
Material Labor Cost Equip. Cost
1 Lot
1 Lot
1 Lot
1.00 lot
1,071.00 sqm
135.00 lm
68.97 lm
37.70 cum
35.28 cum
5.29 cum
29.99 cum
4.12 cum
66.84 cum
3,598.48 kgs
69.66 sqm
248.44 sqm
7.91 sqm
102.66 lm
77.00 sqm
77.00 sqm
33.92 Lm
18.00 Lm
49.25 m3
2.52 m3
158.40 m3
15.84 m3
2.05 m3
5.70 m3
2.52 m3
7.70 m3
5.40 m3
19.60 m3
245.18 kgs
330.46 kgs
607.62 kgs
330.46 kgs
395.90 kgs
273.80 kgs
444.00 kgs
1,968.40 kgs
41.8464 m2
52.62 m2
7.20 m2
28.80 m2
183.00 m2
384.80 kgs
366.00 m2
3.60 m2
12.00 m2
9.00 m2
12.00 m2
12.00 m2
12.00 m2
12.00 m2
9.00 m2
1.00 set
1.00 set
1.00 sets
1.00 sets
1.00 sets
1.00 sets
3.00 sets
1.00 sets
3.00 sets
3.00 sets
1.00 sets
1.00 sets
1.00 sets
2.00 sets
1.00 sets
1.00 sets
1.00 sets
254.80 m2
2.00 sets
67.00 lengths
3.00 lengths
162.00 lengths
46.00 lengths
7.66 rolls
1.00 lot
12.00 m2
11.70 sets
24.00 sets
24.00 sets
366.00 sq.m.
15 sq.m.
###lot
1.00 set
1.00 set
1.00 set
3.00 set
4.00 set
3.00 set
7.00 set
4.00 set
5.00 set
1.00 lot
15.00 length
10.00 set
1.00 set
1.00 set
1.00 set
5.00 length
3.00 set
3.00 set
5.00 set
5.00 set
7.00 set
1.00 lot
0.56 m3
140.30 kgs
0.54 m2
74.88 pcs
57.35 kgs
### m2
0.07 m3
44.40 kgs
0.36 m2
8.00 set
4.00 set
Equip. Cost
Total Total Unit Cost Total Amount
Labor
Cost
- /lm
- /lm
- /cum
1
1 -
1 - 0