Finalexam
Finalexam
EXAM IV
Spring 2008
DIRECTIONS:
Answer the multiple-choice questions directly on the exam by circling the BEST
answer. You do NOT need to show your work for multiple choice questions.
Your answers to the problems and short answers should start and be presented on
separate pages for each problem. For problems, you MUST show your work. If
you use a calculator, set up the problem on the exam sheet then show the answer
you obtained from your calculator. If you use software, embed the output in your
examination document.
You may use your notes, textbook, statistical packages, computer software, or
other pre-printed material.
The exam may be delivered to me at The University Center between 6:00 and
6:30 p.m. on 15 May. Exams may be given to Dr. Dina Flores at The University
Center or delivered to my office on campus prior to that time. Exams may be e-
mailed to me by 8:00 p.m. on Thursday, May 15, 2007.
Signature Date
BAN 530
Spring 2008
Exam IV
Part A. [37 total points in this section] Multiple Choice (1 point each). Circle the
BEST answer on the test sheet.
3. Department A
A
Department B U
X X
Department C U
O
Department D
a. True b. False
5. The primary objective of both manufacturing and service layouts is always
efficiency.
a. True b. False
$
B
C
0 10 20 30 40 50 60 70 80
Units (1,000’s)
6. Marketing has forecast potential sales for our new retail outlet to be 75,000 units.
Based on the total cost curves shown above, what would be the best location for our
new retail outlet?
a. A
b. B
c. C
d. Either A or C – We are indifferent between these two locations.
e. Either A or B – We are indifferent between these two locations.
7. Actual output for a process is 200 units per day. Design capacity is 300 units is
day. Effective capacity is 260 units per day. The efficiency of this process is
a. 66.7% d. 35.7%
b. 76.9% e. 130%
c. 86.7%
8. Using the information in the previous problem, what is the utilization of this
process?
a. 66.7% d. 35.7%
b. 76.9% e. 130%
c. 86.7%
A company used the transportation model to evaluate location alternatives for a new
factory. Answer the next two questions using these printouts from POM for Windows.
9. Based on these printouts the best location for a new factory would be
a. A d. San Francisco
b. B e. Las Vegas
c. C
10. This analysis method allows the company to select a location alternative that
a. minimizes total costs.
b. minimizes the cost of transporting product from factories to destinations.
c. provides the best customer service.
d. provides the most transportation mode alternatives.
e. the best range of qualitative alternatives.
11. Which of the following actions would likely reduce a company’s need for
decoupling inventory?
a. Increasing the number of raw material suppliers.
b. Determining whether customers would accept a smaller selection of
merchandise.
c. Implementing a preventative maintenance program.
d. Reducing the incidence of shrinkage.
e. Improving the quality of incoming raw materials.
12. The inventory management system discussed in class where inventory is stored in
two locations with the quantity in the second location equal to the demand during
lead time is called
a. safety stock system d. modified MRP
b. hidden inventory system e. modified ROP
c. two-bin system
13. The inventory management system where we receive orders on a regular schedule
but the quantity received varies is called
a. EOQ/ROP d. Economic Lot Size
b. Single Period Model e. Fixed-Period System
c. Probabilistic Model
14. An appropriate technique for studying non-repetitive jobs, such as those performed
by secretaries and maintenance technicians, is
15. Giving a worker a larger portion of the total task by horizontal loading is called
a. specialization. d. job enrichment
b. ergonomics e. job enlargement
c. job design
19. There are methods available to adjust the basic EOQ/ROP model for such things
as quantity discounts, variation in lead time, and variation in demand.
a. True b. False
20. It is okay to round the EOQ because of such things as standard package sizes
because
a. the EOQ is just an estimate.
b. you should never round the EOQ.
c. the TC curve is relatively flat near the EOQ.
d. the TC curve slopes sharply up near the EOQ.
e. Deming said it is okay.
23. The tool my secretary used to justify hiring a receptionist to answer my phone is
a. time study d. Pareto analysis
b. ROI e. work sampling
c. methods analysis
24. An alternative to time studies that divides the job into small basic elements
sometimes called Therbligs that have widely accepted times is called
a. methods analysis d. work sampling
b. ergonomics e. job analysis
c. predetermined time standards
27. Which of the following is used to help set prices and set quotas for workers?
a. Average observed time d. Normal time
b. Adjusted time e. Standard time
c. Greenwich meridian time
28. Based on our class discussion, ______________________ are the most important
asset of an organization.
29. The following data have been collected using stopwatch time study.
Observation in minutes PR
1 2 3 4 5
Element A 8 10 9 15 9 110
31. Which do you get when you disaggregate the aggregate plan?
a. subcontract list d. inventory level plan
b. master schedule e. staffing plan
c. backorder list
32. In aggregate planning, we develop a plan for matching capacity with demand on
an individual item-by-item basis.
a. True b. False
33. Computer-based information system that translates master schedule requirements for
end items into time-phased requirements for sub-assemblies, components, and raw
materials is the definition of
a. ERP d. EOQ
b. MRP e. SAP
c. ROP
34. In the demonstration of JIT we moved from
a. MRP to JIT d. SPC to JIT
b. EOQ to JIT e. L-4-L to EOQ
c. a push to a pull system
35. The model which evaluates a location decision based exclusively upon an
economic comparison of total production costs is:
a. center-of-gravity method
b. locational break-even (or cost-volume) analysis.
c. factor-rating method.
d. transportation model.
e. geographic information systems model.
36. Work sampling revealed the following data for maintenance technicians working
from a centralized maintenance shop? Your maintenance technicians are very highly
paid.
37. The location analysis technique that allows for the inclusion of both quantitative
and qualitative inputs is
38. A location analysis has been narrowed down to these locations. The critical
factors, their weights, and the ratings for each location are shown below. If the
selection criterion is to select the location with the greatest composite (weighted)
score, which location would you recommend?
Location
Factor Wt. Never-Never Land Whoville North Pole
Labor Cost .4 60 90 70
Transport. Cost .3 70 80 90
Quality of Schools .1 90 70 70
Market Access .1 50 70 90
Utility Cost .1 80 70 80
39. A manufacturer of tables has collected the following data: Fixed cost for the
operation is $10,000; variable cost per table is $85; the tables sell for $250 each.
The breakeven point for this manufacturer is
a. 117.6 tables d. 60.6 tables
b. 40 tables e. $60.6
c. $40
40. A service garage uses 204 boxes of cleaning cloths a year. The boxes cost $12 each.
The cost to place one order is $15, and the cost to hold one box in inventory for a
year is $2.40. The EOQ is
a. 40.4 boxes d. 626.7 boxes
b. 174.9 boxes e. 50.5 boxes
c. 156.5 boxes
41. Using the information in the previous question, what is our total holding and
ordering cost if we currently order 12 boxes at a time?
a. $ 14.40 d. $ 130.80
b. $269.40 e. $2,448.00
c. $255.00
42. If the owner of the service garage in the previous question orders the EOQ,
instead of 12 boxes at a time, how much will he save?
a. $121.20 d. $ 14.40
b. $ 60.60 e. $148.20
c. $269.40
43. A company sells an average of 35 tires per day. Lead time for an order of tires is
15 days. The supplier has never been late in delivering an order of tires. What
should the reorder point (ROP) be for tires?
a. 15 d. 150
b. 10 e. 25
c. 1.5
44. A job has an average observed cycle time of 4 minutes, a performance rating of 120
percent, and an allowance factor of 30 percent. Normal time for the job in minutes
is:
a. 4.8 d. 16.0
b. 6.25 e. none of these
c. 5.76
46. A job has a normal time of 5 minutes, a performance rating of 130 percent, and total
allowances of 20 percent. Standard time for the job in minutes is:
a. 4.8 d. 25.0
b. 6.25 e. none of these
c. 3.85
A B C
System reliability is
a. 0.85 d. 2.84
b. 0.95 e. 0.90
c. 0.99
48. In the previous problem, if an identical parallel backup component is provided for
component C, the new system reliability would be
a. 0.89 d. 0.93
b. 0.94 e. None of the above
c. 0.99
50. (10 points) You are scheduling production for an order of 60 garage door openers
due to be shipped in week 7. Assume lot-for-lot ordering. Below is information
about the openers.
Item Lead Time On Hand Components
Opener 2 30 A(1), B(2), C(3)
A 1 10 D(2), F(3)
B 1 0 E(1), F(4)
C 2 20
D 1 30
E 2 5
F 3 5
1 2 3 4 5 6 7
Gross Req.
Sch. Receipts
Pr. on hand
Net Require.
Pl. O.Receipt
Pl. O. Release
1 2 3 4 5 6 7
Gross Req.
Sch. Receipts
Pr. on hand
Net Require.
Pl. O.Receipt
Pl. O. Release
1 2 3 4 5 6 7
Gross Req.
Sch. Receipts
Pr. on hand
Net Require.
Pl. O.Receipt
Pl. O. Release
51. (10 points) Sower and Sons, Inc. wants to determine the best way to distribute
products from its 3 factories to its 4 distribution warehouses (DW) in order to
minimize transportation costs. It has collected the following data:
DW W DW X DW Y DW Z Supply
Factory A $132 $116 $250 $110 220
Factory B $220 $230 $180 $178 300
Factory C $152 $173 $196 $164 435
Demand 160 120 200 230
Use POM for Windows and completely interpret your printout including the implications
of the Dummy.
52. (7 points) Discuss why I said in class that you should first update your resume if
your boss tells you to implement an MRP system by the end of next month.
What are some of the things that you would have to do before implementing an
MRP system to be sure that your organization is ready for MRP? Be specific!