Waste Water Treatment Plant: Project Report
Waste Water Treatment Plant: Project Report
PROJECT REPORT
ON
CERTIFICATE
It is certified that, Rishikant singh, Krishn kant singh, Updesh kumar singh,
Kuldeep singh, has carried out the research work presented in the “ WASTE
WATER TREATMENT PLANT” for the award of POLYTECHNIC from
Board of Technical Education, Lucknow under my supervision.
The report embodies result of original work and studies carried out by student
himself and the contents of the report do not form the basis for the award of any
other degree to candidate or to anybody else.
and Management
ACKNOWLEDGEMENT
We would like to express our deep sense of gratitude and respect to our guide Mr. Nouman
(Asst. Prof.) Civil Engineering Deptt. Our sincere thanks to him, for initiating into and readily
guiding us throughout the project with great patience and zeal. We are indebted to him for giving
us a better understanding of subject and invaluable inputs.
We are grateful to Mr. Mohd. Amir, (H.O.D) Civil Engineering Deptt. for permitting us to use
the equipment and other facilities that enabled us to successfully complete this project.
We would like to render heartiest thanks to Dr. Sanyam Agarwal ,Director (ACE COLLEGE
OF ENGG. AND MANAGEMENT) for being our consistent mentor. We are mostly indebted to
our families and friends for being our consistent anchors during this project.
1.0 INTRODUCTION
1.1 SOURCES OF INDUSTRIAL WASTE
FLOCCULATION