MC BHLNGR Ground Check
MC BHLNGR Ground Check
PHASE-II
T .S Estimated Work Order No.
m Sr.No. Name of Scheme
Cost
Date Of Advertisement
Dated
2.5 15 (i) Const: of Boundary Wall Chak No.235/9R Rs.2500000/- 2500000 4-Aug-2018 26.04.2018
(i) Const: of Boundary Wall Cattle Pond Chak No.11/1R
Rs.200000/-
(ii) Const: of Soling Chak No.26/3R
Rs.450000/-
(iii) P/L Sewerage Pipeline Chak 25/3R Rs.300000/-
(iv) Const: of Boundary Wall Cattle Pond Chak
No.8/1RRs.250000/-
2.5 20 (v) Const: of Soling Chak Kasrian Street Iqbal Kasri 2500000 4-Aug-2018 26.04.2018
Rs.250000/-
(vi) Const/Extension of Janazgah Chak 60/4R
Rs.300000/-
(vii) Const: of Soling Chak No.60/4R
Rs.250000/-
(viii) Providing of RCC Pipe 18”Dia U/C 94
Rs.500000/-
2.5 27 Const/Special Repair of Office District Council Bahawalnagar 2500000 4-Aug-2018 26.04.2018
2.5 80 Const/Repair of Metalled Road Lala Amer Singh(Phase-1) 2500000 4-Aug-2018 26.04.2018
(i) Const of Pacca Pond for waste water Tobba Qalandar
Shah. Rs. 1500000/-
(ii) Installation of Street Light Tobba Qalandar Shah
2.4 30 2400000 4-Aug-2018 26.04.2018
Rs.500000/-
(iii) Const: of Soling Basti Asghar Arain near
ChawaykaRs.400000/-
G.Total 427143000 - -
MES YEAR 2017-18
Agreement
Name of Contractor Less Rate Expenditure Date Of Completion
Amount
Muhammad Ajmal
0.65% 2710268/- 1954222 ongoing
Shahzad
Muhammad Ajmal
0.65% 2632775 2370722 ongoing
Shahzad
Muhammad Anwar
0.20% 2595000 2275848 ongoing
Pansoota / Khalid Jutt
Bhatti Construction
0.61% 2484750 2435599/- ongoing
Works
Z.M.J Enterprises 0.61% 2484750 2156327 On going
Muhammad Ajmal
0.61% 2484750 1939491 On going
Shahzad
Tahreem Builders 0.21% 2494750 2494750 23.05.2018
M/S Abdullah
0.63% 2484250 2452266 ongoing
Constriction.
Muhammad Anwar
0.19% 2300000 2081432 ongoing
Pansoota/Khalid Jutt
Muhammad Ajmal
0.65% 2285050 1160161 ongoing
Shahzad
Muhammad Anwar
0.19% 2096010 2037947 Ongoing
Pansoota/Khalid Jutt
Tahir Mehmood 0.18% 209620 1327581 ongoing
No quotation was
- - 2000000 0
received.
- - 381387804/-
MC BAHAWALNAGAR DEVELOPMENT SCHEMES YEAR 2017
PHASE-II
T .S Estimated Work Order No.
m Sr.No. Name of Scheme
Cost
Date Of Advertisement
Dated
(i) Const of Soling Drain/Culverts, Water Supply Pipeline
3”,4” Dia Basti Tobba Allah Yar Instead of Const: of Soling Drain
4.5 31 4500000 4-Aug-2018 25.06.2018
Bonga Ahsan Bibi (Revised Rs.3500000/-)
(ii) Const: of Soling Drain Khaim Garh Rs.1000000/-
Agreement
Name of Contractor Less Rate Expenditure Date Of Completion
Amount
Muhammad Anwar
0.19% 4491450 3989455 ongoing
Pansoota / Khalid Jutt.
Muhammad Anwar
0.17% 2994000 2777002 ongoing
Pansoota/Khalid Jatt
Babar Javid 0.61% 2981850 2741854 23.05.2018
Muhammad Ajmal
0.61% 2981700 2981000 ongoing
Shahzad