Piping Valves and Fitting - Requirement Details
Piping Valves and Fitting - Requirement Details
Requirement
Delivery By Order from (Segment SCM/HQ) Origin
LE170102-M-
1/10/2019 IW-WS-PR-2220
Delivery By
LE170102-M-
1/10/2019 IW-WS-PR-2220
Delivery By
LE170102-M-
2/15/2019 IW-WS-PR-2220
Delivery By
LE170102-M-
2/15/2019 IW-WS-PR-2220
RM Line Valve Details
2
BFV 2400 RM1
50% by 15-01-19
BFV 1800 4 RM3,4,5 bal 50% by 30-04-19
Sluive Valve 450 10 RM1
Sluive Valve 300 14 RM3,4,5
Air Valve 200 50 RM1,3,4,5 Sai Sanket
BFV 900 5
BFV 1600 2
Sluice Valve 100 3
Sluice Valve 300 6 50% by 10-01-19
Zero Velocity Valve 2802 1 bal 50% by 31-03-19
Zero Velocity Valve 1880 1
Float Valve 300 6
Non Return Valve 900 4
Non Return Valve 1600 2
`
Requirem
Order from (Segment SCM/HQ) ent
Origin
LE170102
-M-IW-
WS-PR-
2207
LE170102
-M-IW-
WS-PR-
2216
LE170102
-M-IW-
WS-PR-
2206
LE170102
-M-IW-
WS-PR-
2206
LE170102
-M-IW-
WS-PR-
2206
LE170102
-M-IW-
WS-PR-
2207
Reducers for Valves Details
Description Size
Requirement
Qty (Nos.) Purpose Delivery By Order from (Segment SCM/HQ) Origin
8 PH1 LE170102-M-IW-
PH2 &3 WS-PR-2220
12
6 RM1 BFV
1/31/2019
8 RM3,4,5 BFV
6 RM flow meter
4 For DISNET2 & 3 Valve
s
Qty (Nos.) Purpose Delivery By
6
4
1 50% by
15/01/19
6 Site Requirement
balance 50%
3 by 15/02/19
1
1
s
Qty (Nos.) Purpose Delivery By
1
1
2
1
1
21
1
1
1
1
9
5
4 50% by
1 15/02/19 & Site Requirement
4 balalnce by
31/03/19
1
3
3 Segment
1
3
3
2
1
1
3
2
1
1
s
Qty (Nos.) Purpose Delivery By
1
2
1
2
1
23
1
20
2
9
7 50% by
1 15/02/19 & Site Requirement
balance by
3 31/03/19
3
2
9
4
5
1
1
1
3
1
PH Flanges Valve Details
Delivery By
50% by 10-01-19 LE170102-M-IW-
bal 50% by 31-03-19 WS-PR-2220
Delivery By
50% by 10-01-19 LE170102-M-IW-
bal 50% by 31-03-19 WS-PR-2220
Delivery By
50% by 10-01-19 LE170102-M-IW-
bal 50% by 31-03-19 WS-PR-2220
Delivery By
RM Fastners Details
Description Size Qty (Nos.) Purpose
BOLT SIZE :- M27; BOLT
LENGTH :- 150 mm; 120
Bolt DN600 Flange
Head Nut NUT SIZE :- M27 120 DN600 Flange
Washer DIAMETER :- 27 mm; 120 DN600 Flange
Gasket DN 600 6
Requirement
Delivery By Order from (Segment SCM/HQ) Origin
Order placed
LE170102-M-
50% by 30-03-19 IW-WS-PR-
bal 50% by 30-04-19 2220
YTO (Segment)
Delivery By
Segment LE170102-M-
50% by 30-03-19 IW-WS-PR-
bal 50% by 30-04-19 2220
YTO (Segment)
Delivery By
Segment LE170102-M-
50% by 10-01-19 IW-WS-PR-
bal 50% by 31-03-19 2220
YTO (Segment)
Delivery By
Segment LE170102-M-
50% by 10-01-19 IW-WS-PR-
bal 50% by 31-03-19 2220
YTO (Segment)
Delivery By
Segment LE170102-M-
50% by 10-01-19 IW-WS-PR-
bal 50% by 31-03-19 2220
Segment LE170102-M-
50% by 10-01-19 IW-WS-PR-
bal 50% by 31-03-19 2220
YTO (Segment)
Delivery By
LE170102-M-
50% by 10-01-19 Segment IW-WS-PR-
bal 50% by 30-04-19 2219