0% found this document useful (0 votes)
133 views2 pages

SAP Client Copy Activity Steps

The document outlines the steps for refreshing SAP system clients on the production and quality systems. On the production system, it involves taking backups, stopping jobs, locking users, exporting clients, validating exports, unlocking users, and releasing the system. On the quality system, it involves full backups, exporting and importing user masters, importing a client copy, post steps, and validation before releasing the system. The refresh process for the production system takes approximately 4 hours and 40 minutes and 8 hours for the quality system, during which time the SID will be unavailable.

Uploaded by

Sachit Varnasi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
133 views2 pages

SAP Client Copy Activity Steps

The document outlines the steps for refreshing SAP system clients on the production and quality systems. On the production system, it involves taking backups, stopping jobs, locking users, exporting clients, validating exports, unlocking users, and releasing the system. On the quality system, it involves full backups, exporting and importing user masters, importing a client copy, post steps, and validation before releasing the system. The refresh process for the production system takes approximately 4 hours and 40 minutes and 8 hours for the quality system, during which time the SID will be unavailable.

Uploaded by

Sachit Varnasi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

SAP System Client Refresh Activity

Step System Activity Duration Team


Production Sytem Activities
1 SID Take online backup 15 minutes Basis Team
2 SID Stop all BG jobs 5 mins Basis Team
3 SID Lock users in all clients except Basis ID 15 minutes Security Team
4 SID Check & Free-up Trans folder space availaibility 30 minutes Basis Team
5 SID Begin Client Export 4 hours Basis Team
6 SID Post export validation of TRs 10 minutes Basis Team
7 SID Unlock users in all clients 15 minutes Security Team
8 SID Release all background jobs 5 minutes Basis Team

9 SID Release sap system back to users 5 minutes Basis Team


Quality System Activities
1 SID Take full backup of sap system 15 minutes Basis Team
2 SID Export user master of 400 client 15 minutes Basis Team
3 SID Take important screenshots & Backups 1 hour Basis Team
4 SID Lock all users except Basis ID 15 minutes Security Team
5 SID Import Client Copy of SID-200 into SID-400 4 hours Basis Team
6 SID Post steps including SCC7 30 minutes Basis Team
7 SID Import user master into SID-400 15 minutes Basis Team
Post steps including RFC connections, Partner Profiles &
8 SID others 1 hour Basis Team
9 SID Post validation 40 minutes Basis Team

10 SID Release system for functional validation & use 5 minutes Basis Team
Remarks

SID unavailable for:


04 hours 40 minutes

SID unavailable for:


8 hours

You might also like