Expansion of Osmani International Airport, Sylhet (1St Phase) Rate Analysis

The document is a rate analysis for the expansion of Osmani International Airport in Sylhet, Bangladesh. It lists various cost components including materials, equipment, labor, transportation, and others. For each component, it specifies the unit and quantity. It then calculates the total direct cost, overhead expenses, taxes, and total unit price. However, many of the values are left unspecified.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
142 views8 pages

Expansion of Osmani International Airport, Sylhet (1St Phase) Rate Analysis

The document is a rate analysis for the expansion of Osmani International Airport in Sylhet, Bangladesh. It lists various cost components including materials, equipment, labor, transportation, and others. For each component, it specifies the unit and quantity. It then calculates the total direct cost, overhead expenses, taxes, and total unit price. However, many of the values are left unspecified.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

EXPANSION OF OSMANI INTERNATIONAL AIRPORT, SYLHET (1ST PHASE)

RATE ANALYSIS
Item No. : Unit of Estimation :
Description of Item : Quantity for Estimation :
Item Quantity :

SL No Cost Component Unit Quantity

A. Materials
M001
M002
M003
M004
M005
M006
M007
Total For A
B. Equipment, Machinery & Tools
E001
E002
Total For B
C. Power & Water
P001
P002
Total For C
D. Fuel, Oil & Lubricants
F001
F002
Total For D
E. Formwork
S001
S002
Total For E
F. Temporary works
W001
W002
Total For F
G. Labour
L001
L002
Total For G
H. Transportation
T001
T002
Total For H
I. Others (Please Specify all sub-items)
O001
O002
Total For I
J. Total (A+B+C+D+E+F+G+H+I)=
K. Total Direct Cost =
L. Overheads Expenses & Profit 15%
M. Total (K+L)
N. Tax & VAT @ 14% (Adjustment factor 1.1627)
O. Total (M+N)
TOTAL UNIT PRICE
Total Unit Cost In Taka: Zero Taka Only

EXPANSION OF OSMANI INTERNATIONAL AIRPORT, SYLHET (1ST PHASE)


RATE ANALYSIS
Item No. : Unit of Estimation :
Description of Item : Quantity for Estimation :
Item Quantity :

SL No Cost Component Unit Quantity

A. Materials
M001
M002
M003
M004
M005
M006
M007
Total For A
B. Equipment, Machinery & Tools
E001
E002
Total For B
C. Power & Water
P001
P002
Total For C
D. Fuel, Oil & Lubricants
F001
F002
Total For D
E. Formwork
S001
S002
Total For E
F. Temporary works
W001
W002
Total For F
G. Labour
L001
L002
Total For G
H. Transportation
T001
T002
Total For H
I. Others (Please Specify all sub-items)
O001
O002
Total For I
J. Total (A+B+C+D+E+F+G+H+I)=
K. Total Direct Cost =
L. Overheads Expenses & Profit 15%
M. Total (K+L)
N. Tax & VAT @ 14% (Adjustment factor 1.1627)
O. Total (M+N)
TOTAL UNIT PRICE
Total Unit Cost In Taka: #NAME?

EXPANSION OF OSMANI INTERNATIONAL AIRPORT, SYLHET (1ST PHASE)


RATE ANALYSIS
Item No. : Unit of Estimation :
Description of Item : Quantity for Estimation :
Item Quantity :

SL No Cost Component Unit Quantity

A. Materials
M001
M002
M003
M004
M005
M006
M007
Total For A
B. Equipment, Machinery & Tools
E001
E002
Total For B
C. Power & Water
P001
P002
Total For C
D. Fuel, Oil & Lubricants
F001
F002
Total For D
E. Formwork
S001
S002
Total For E
F. Temporary works
W001
W002
Total For F
G. Labour
L001
L002
Total For G
H. Transportation
T001
T002
Total For H
I. Others (Please Specify all sub-items)
O001
O002
Total For I
J. Total (A+B+C+D+E+F+G+H+I)=
K. Total Direct Cost =
L. Overheads Expenses & Profit 15%
M. Total (K+L)
N. Tax & VAT @ 14% (Adjustment factor 1.1627)
O. Total (M+N)
TOTAL UNIT PRICE
Total Unit Cost In Taka: #NAME?
NTERNATIONAL AIRPORT, SYLHET (1ST PHASE)
RATE ANALYSIS
cum
Quantity for Estimation : 1

Rate Amount

Taka (BDT) Taka (BDT)

0
0
0
0
0
0
0
0
0
Zero Taka Only

NTERNATIONAL AIRPORT, SYLHET (1ST PHASE)


RATE ANALYSIS
cum
Quantity for Estimation : 1

Rate Amount

Taka (BDT) Taka (BDT)

0
0

0
0
0
0
0
0
0
0
#NAME?

NTERNATIONAL AIRPORT, SYLHET (1ST PHASE)


RATE ANALYSIS
cum
Quantity for Estimation : 1

Rate Amount

Taka (BDT) Taka (BDT)

0
0

0
0
0
0
0
0
0
0
#NAME?