The document examines the flexural stress, diagonal tensile stress, tensile stress of post-tensioned tendons, and tensile force of stay cables in the main girder of a bridge. It provides tables summarizing the limit stresses, load combinations considered, and judgments about whether stresses are within allowable limits during construction, under dead loads, and at the service limit state. Checks are performed both immediately after construction and at the creep end state, considering different numbers of traffic lanes.

Uploaded by

Tuan Pn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
109 views

Chapter 3 (V45) PDF

The document examines the flexural stress, diagonal tensile stress, tensile stress of post-tensioned tendons, and tensile force of stay cables in the main girder of a bridge. It provides tables summarizing the limit stresses, load combinations considered, and judgments about whether stresses are within allowable limits during construction, under dead loads, and at the service limit state. Checks are performed both immediately after construction and at the creep end state, considering different numbers of traffic lanes.

Uploaded by

Tuan Pn
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 47

3.5 Examination results of flexural stress in Main girder.

3.5.1 During construction

The limit stresses of concrete and examination results are summarized in following table (follow DD condition)

Item Limit stress Combine load Judgment


Compression 0.5 f’c = 25 Mpa. D+EL+PS+CR+SH OK
Tension-1 0.5 f’c =3.54 Mpa D+EL+PS+CR+SH OK
Tension-2 0.58 f’c = 4.10 Mpa D+EL+PS+CR+SH+0.5TG OK

a. Results check compression


b. Results check Tension-1

.
c. Results check Tension-2

3.5.2 Dead load working state

The limit stresses of concrete and examination results are summarized in following table (follow DD condition)

Item Limit stress Combine load Judgment


Compression 0.45 f’c = 22.5Mpa. D+PS+CR+SH OK
Tension No tension D+PS+CR+SH+TG OK

a. Results checking compression.


b. Results checking tension.
3.5.3 Service limit state.

The limit stresses and examination results are summarized in following table (follow DD condition).

+ Check tension stress

Item Limit stress Combine load Judgment

Tension 0.50 f’c = 3.54 Mpa D+PS+CR+SH+0.8 (L+I) + TU + 0.5TG OK

+ Check compression stress


The compression stress shall be checked at Service I.

Item Limit stress Combine load Judgment

Compression 0.6 f’c = 30 Mpa D+PS+CR+SH+(L+I)* + TU +0.3WS + WL + 0.5TG Not OK

The liveload shall be consider 02 cases:


- Case 1: After construction, the bridge shall be under service of Stage 1, so only consider 04 lanes in this Stage.
- Case 2: After creep end, the bridge shall be under service of full Stage, so in this stage the Liveload shall be consider
for 05 lanes.
a. Results checking Tension
After construction (Consider 04 lanes for Liveload)
At creep end (Consider 05 lanes for Liveload)
b. Results checking compression

After construction (Consider 04 lanes for Liveload)


At creep end (Consider 05 lanes for liveload)
3.6 Examination for Diagonal tensile stress of Main girder.

In order to confirm the none diagonal cracking, the diagonal tensile stress shall be checked in during construction, Dead load
working state and Service limit state.

The point for checking diagonal tensile stress is intersection point between neutral axis and web of girder.

3.6.1 During construction

The limit stresses of concrete and examination results are summarized in following table (follow DD condition)

Item Limit stress Combine load Judgment

Diagonal tensile stress 0.289f’c1/2 = 2.04 D+EL+PS+CR+SH OK

Checking diagonal stress during construction


3.6.2 At Service Limit State (SLS).

The limit stresses of concrete and examination results are summarized in following table (follow AASHTO2007).

Stage Limit stress Combine load Judgment

Completion 0.289f’c1/2 = 2.04 Service III OK


After construction

At creep End

Checking diagonal stress at Service stage.


3.7 Examination for tensile stress of PC tendons.

The tensile stress of PC tendons shall be less than the restricted stress during construction and service limit state.

The PC tendons were grouped as follow:

Table 3.7: PC tendon arrangements in Main girder

Group ID Usage Tendon

1 In upper slab for cantilevering PC bar type 2, D32mm

2 In bottom flange for cantilevering PC cable, 5T15.7

3 In top flange for cantilevering PC cable, 5T15.7

4 In bottom flange for connection with side span and middle span PC cable, 9T15.7

5 In upper slab for cantilevering PC cable, 5T15.7


Results check.

Results checking for Group 1


Results checking for Group 2

Results checking for Group 3


Results checking for Group 4

Results checking for Group 5


3.8 Tensile force of stay cable.
The tensile stress of Stay cable shall be less than the restricted stress during construction and service stage. The restricted
stress of stay cable as follow:

Table 3.7: Restricted stress of stay cable

State Stay cable Stress limit (MPa) Load combination

Permanent stay 0.6 fpu = 1116 D+EL+PS+CR+SH


During
Construction
Temporary stay 0.7 fpu = 1302 D+EL+PS+CR+SH

Tensile stress -1 0.50 fpu = 930 Service limit State (SLS)


At Service
Tensile stress -2 * fpu Strength Limit State (ULS)

Note: * According to FIB – Article A3.2.3, checking Stay cable at ULS as follow:

In our case, we can use safety factor  = 1.35 which mean the resistance factor = 1/ = 1/1.35 = 0.74.

Identify stay cable for Main Bridge


3.8.1 During construction (max)

3.8.2 Check at completion stage.

For checking stay cable force at Completion stage, we also check the stay cable force in 02 cases:

Case 1: After Construction (Consider only 04 lanes for Live load).

Case 2: At creep end (Consider 05 lanes for Liveload)

The detail of checking stay cable at Completion stage see at next pages.
CHECKING STAY CABLE AT STAGE:
AFTER CONSTRUCTION
CABLE CHECKING
Item: Cable - Side Stay P19

1. INPUT DATA
Specification: 22TCN 272-05
1.1. Material Spec. A421M-98a Strand Type 15.7 mm
Minimum specified ultimate tensile stress of prestressing stay cable f's = 1860 MPa
Minimum yield stress of prestressing stay cable fy = 1674 MPa
Modulus of elasticity of stay cable Ep =195000 MPa
Linear density of strand gs = 0.013 KN/m
1.2. Dimentions
Area of 1 Strand Astr = 150.00 mm2
• The cables are arranged symmetrically in longitudinal and transeverse direction.
2. CHECKING
2.1. Resistance factor Load modifier = 1.05
Strength f = 0.74
Service f = 0.50
2.2.
• In the inclined cables "sag" is caused by their self weight and, the cables have nonlinear
force-displacement relationships. Therefore, their linearization is needed for simplification of design.
• The equivalent modulus of elasticity proposed by Ernst formula is used for the linearization.
• Ernst formula for equivialent modulus of elasticity

E Where: E : Young's Modulus of cable


E eq  (Tangent modulus of elasticity) g : unit volumetric weight of cable
 l 2 2
1 E ℓ : cable length
12 f 1 3 f1 : initial stress (for dead load)
2.3. Detail stay cable force
Static load CR&SH Stay cable force due to service load (LL, BR, SE, TU, TG,WS, WL)
CR-SH 1 CR-SH 2 LL BR SE TU TG WS WL
Max Max Max Max Max Max Max
Cable No
DC DW EL CR&SH
During CS
30 years kN kN kN kN kN kN kN
S17 2379.5 124.5 -42.5 -97.5 -186.5 136 4 3 54 4 118 6
S16 2312.5 219.5 8 -83 -136.5 202 4 4 46 3 150 7
S15 2408.5 274 47 -68.5 -88 229 4 3 30 2 121 5
S14 3331.5 436.5 76.5 -97.5 -87.5 341 4 4 24 0 130 6
S13 3293.5 466 94 -63.5 -63.5 349 3 3 12 1 90 4
S12 3235 480.5 116 -39.5 -43.5 346 2 2 5 1 57 3
S11 3660 578 159.5 -31 -30.5 396 2 2 7 2 37 3
S10 3681.5 571.5 178 -12.5 -11 381 2 1 6 2 8 3
S9 4123.5 653.5 212 -2.5 4.5 424 1 1 3 3 19 3
S8 4014.5 637.5 202.5 7 13 404 2 4 2 3 48 3
S7 4158.5 618 168.5 18.5 18 381 2 7 7 2 76 3
S6 4200 594 106 22.5 23.5 360 2 10 14 2 105 3
S5 4360.5 566.5 14 19.5 32 370 2 13 21 1 134 3
S4 5384.5 688 -138 12.5 52.5 531 3 21 37 0 201 4
S3 5533 646 -315 21.5 66.5 612 3 26 47 6 236 5
S2 5891 609 -519.5 30 85 710 4 30 57 14 270 5
S1 5500.5 567.5 -982 17 110.5 792 4 34 66 23 297 6

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsSide span-P19


2.4. Load factors and load combination
Load factors.
SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ

LOAD At Bridge At Bridge At Bridge At Bridge At Bridge At Bridge


At end At end At end At end At end At end
Completi Completi Completi Completi Completi Completi
creep creep creep creep creep creep
on on on on on on

DC 1.0 1.0 1.25 1.25 1.25 1.25 1.25 1.25 1.50 1.50 1.25 1.25
DW 1.0 1.0 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
EL 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH1 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH2 - - - - - - - - - - - -
LL 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
BR 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
SE - - - - - - - - - - - -
TU 1.0 1.0 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
TG 0.5 0.5 - - - - - - - - - -
WS 0.3 0.3 - - - - 1.40 1.40 - - 0.40 0.40
WL 1.0 1.0 - - - - - - - - 1.00 1.00

Stay cable force


SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ

Cable No At Bridge At end At Bridge


At end
At Bridge
At end
At Bridge
At end
At Bridge
At end
At Bridge
At end
Completi Completi Completi Completi Completi Completi
creep creep creep creep creep creep
on on on on on on

S17 2601 2601 3293 3293 3237 3237 3213 3213 3643 3643 3290 3290
S16 2763 2763 3528 3528 3446 3446 3378 3378 3746 3746 3513 3513
S15 2966 2966 3823 3823 3730 3730 3585 3585 4017 4017 3783 3783
S14 4161 4161 5414 5414 5276 5276 4992 4992 5643 5643 5334 5334
S13 4186 4186 5468 5468 5328 5328 4978 4978 5676 5676 5368 5368
S12 4166 4166 5453 5453 5313 5313 4923 4923 5652 5652 5339 5339
S11 4787 4787 6271 6271 6111 6111 5626 5626 6489 6489 6129 6129
S10 4814 4814 6298 6298 6145 6145 5639 5639 6548 6548 6151 6151
S9 5425 5425 7089 7089 6919 6919 6372 6372 7377 7377 6930 6930
S8 5288 5288 6895 6895 6733 6733 6252 6252 7189 7189 6755 6755
S7 5380 5380 6986 6986 6833 6833 6422 6422 7355 7355 6866 6866
S6 5334 5334 6910 6910 6765 6765 6424 6424 7327 7327 6810 6810
S5 5397 5397 6995 6995 6847 6847 6532 6532 7435 7435 6903 6903
S4 6582 6582 8590 8590 8377 8377 7937 7937 9002 9002 8461 8461
S3 6626 6626 8692 8692 8446 8446 7946 7946 8999 8999 8545 8545
S2 6875 6875 9066 9066 8780 8780 8194 8194 9289 9289 8893 8893
S1 6072 6072 8188 8188 7869 7869 7211 7211 8170 8170 7994 7994

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsSide span-P19


2.5. Check

Cable Tensile Service Checking Strength Checking


Number area strength Nx max Fact. Allow. Nx max Fact. Allow.
Cable No of
Strands Ac f's SER max su [s] S.F Check Phi STR max g.Nu [N] S.F Check

(mm2) (Mpa) (KN) (Mpa) (Mpa) (KN) (KN) (KN)

### S17 19 2850.0 1860 2601.4 912.8 930.0 98.1% OK 0.74 3825.2 3825.2 3926.7 97.4% OK
### S16 22 3300.0 1860 2762.5 837.1 930.0 90.0% OK 0.74 3933.3 3933.3 4546.7 86.5% OK
### S15 22 3300.0 1860 2966.3 898.9 930.0 96.7% OK 0.74 4218.1 4218.1 4546.7 92.8% OK
### S14 31 4650.0 1860 4161.0 894.8 930.0 96.2% OK 0.74 5925.2 5925.2 6406.7 92.5% OK
### S13 31 4650.0 1860 4185.5 900.1 930.0 96.8% OK 0.74 5959.5 5959.5 6406.7 93.0% OK
### S12 31 4650.0 1860 4165.6 895.8 930.0 96.3% OK 0.74 5934.9 5934.9 6406.7 92.6% OK
### S11 37 5550.0 1860 4786.6 862.5 930.0 92.7% OK 0.74 6813.5 6813.5 7646.7 89.1% OK
### S10 37 5550.0 1860 4813.9 867.4 930.0 93.3% OK 0.74 6875.4 6875.4 7646.7 89.9% OK
### S9 43 6450.0 1860 5424.7 841.0 930.0 90.4% OK 0.74 7745.3 7745.3 8886.7 87.2% OK
### S8 43 6450.0 1860 5288.4 819.9 930.0 88.2% OK 0.74 7547.9 7547.9 8886.7 84.9% OK
### S7 43 6450.0 1860 5380.3 834.2 930.0 89.7% OK 0.74 7723.0 7723.0 8886.7 86.9% OK
### S6 43 6450.0 1860 5334.0 827.0 930.0 88.9% OK 0.74 7692.8 7692.8 8886.7 86.6% OK
### S5 43 6450.0 1860 5397.2 836.8 930.0 90.0% OK 0.74 7806.2 7806.2 8886.7 87.8% OK
### S4 55 8250.0 1860 6582.3 797.9 930.0 85.8% OK 0.74 9451.8 9451.8 11366.7 83.2% OK
### S3 55 8250.0 1860 6626.3 803.2 930.0 86.4% OK 0.74 9448.4 9448.4 11366.7 83.1% OK
### S2 55 8250.0 1860 6874.5 833.3 930.0 89.6% OK 0.74 9753.5 9753.5 11366.7 85.8% OK
### S1 55 8250.0 1860 6071.6 736.0 930.0 79.1% OK 0.74 8597.3 8597.3 11366.7 75.6% OK

SERVICE STRENGTH
100%
100%
90%
90%
80%
80%
70%
70%

60% 60%

50% 50%

40% 40%

30% 30%

20% 20%

10% 10%

0% 0%
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsSide span-P19


CABLE CHECKING
Item: Cable - Main span P19

1. INPUT DATA
Specification: 22TCN 272-05
1.1. Material Spec. A421M-98a Strand Type 15.7 mm
Minimum specified ultimate tensile stress of prestressing stay cable f's = 1860 MPa
Minimum yield stress of prestressing stay cable fy = 1674 MPa
Modulus of elasticity of cable stayed Ep = 195000 MPa
Linear density of strand gs = 0.013 KN/m
1.2. Dimentions
Area of 1 strand Astr = 150.00 mm2
• The cables are arranged symmetrically in longitudinal and transeverse direction.
2. CHECKING
2.1. Resistance factor Load modifier = 1.05
Strength f = 0.74
Service f = 0.50
2.2. Equivalent Modulus of Elasticity
• In the inclined cables "sag" is caused by their self weight and, the cables have nonlinear
force-displacement relationships. Therefore, their linearization is needed for simplification of design.
• The equivalent modulus of elasticity proposed by Ernst formula is used for the linearization.
• Ernst formula for equivialent modulus of elasticity

E Where: E : Young's Modulus of cable


E eq  (Tangent modulus of elasticity) g : unit volumetric weight
 l 2 2
1 E ℓ : cable length
12 f 1 3 f1 : initial stress (for dead load)
2.3. Detail stay cable force
Static load CR&SH Stay cable force due to service load (LL, BR, SE, TU, TG,WS, WL)
CR-SH 1 CR-SH 2 LL BR SE TU TG WS WL
Max Max Max Max Max Max Max
Cable No
DC DW EL During CR&SH
CS 30 years kN kN kN kN kN kN kN
S17 2124.5 12 220.5 -84.5 -210 129 4 3 76 0 119 6
S16 2051 100.5 288 -69 -154 193 5 3 67 1 151 7
S15 2270.5 182 268 -56 -95.5 222 4 3 43 0 123 6
S14 2972 347 296.5 -81 -84.5 332 4 4 33 1 132 6
S13 3122 412.5 233 -56 -49 341 3 3 13 0 92 4
S12 3217 457 189 -38.5 -17 343 3 2 9 0 58 3
S11 3464.5 578.5 184.5 -33 16 404 2 1 16 0 39 3
S10 3674.5 593 154.5 -18.5 51.5 395 2 1 19 0 10 3
S9 4317 697 141.5 -10.5 96 456 2 1 21 0 15 3
S8 4231 692.5 98.5 12 122.5 451 1 2 19 0 44 3
S7 4363 678 41 33 129.5 442 1 5 15 0 72 3
S6 4458.5 654.5 -36.5 43 118.5 430 1 8 8 0 100 3
S5 4350.5 621.5 -136 41 90 418 2 11 2 0 129 3
S4 5151 743 -328.5 29 62 519 2 19 18 2 196 4
S3 5531 678 -490.5 13.5 -3 507 3 23 37 3 231 5
S2 5637.5 609 -667.5 -4 -76.5 504 3 28 58 5 265 5
S1 5624.5 528.5 -847.5 -25 -152.5 500 3 32 81 7 294 6

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsMain span-P19


2.4. Load factors and load combination
Load factors.
SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ
At At
LOAD At Bridge At Bridge At Bridge At Bridge
At end At end At end Bridge At end At end Bridge At end
Completi Completi Completi Completi
creep creep creep Complet creep creep Completi creep
on on on on
ion on
DC 1.0 1.0 1.25 1.25 1.25 1.25 1.25 1.25 1.50 1.50 1.25 1.25
DW 1.0 1.0 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
EL 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH1 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH2 - - - - - - - - - - - -
LL 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
BR 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
SE - - - - - - - - - - - -
TU 1.0 1.0 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
TG 0.5 0.5 - - - - - - - - - -
WS 0.3 0.3 - - - - 1.40 1.40 - - 0.40 0.40
WL 1.0 1.0 - - - - - - - - 1.00 1.00

Stay cable force


SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ
At At
Cable No At Bridge At end
At Bridge
At end
At Bridge
At end Bridge At end
At Bridge
At end Bridge At end
Completi Completi Completi Completi
creep creep creep Complet creep creep Completi creep
on on on on
ion on
S17 2523 2523 3080 3080 3027 3027 3014 3014 3379 3379 3081 3081
S16 2688 2688 3314 3314 3234 3234 3178 3178 3480 3480 3302 3302
S15 2976 2976 3740 3740 3650 3650 3517 3517 3912 3912 3705 3705
S14 3950 3950 5056 5056 4921 4921 4652 4652 5211 5211 4980 4980
S13 4100 4100 5307 5307 5169 5169 4834 4834 5485 5485 5210 5210
S12 4200 4200 5467 5467 5329 5329 4943 4943 5666 5666 5355 5355
S11 4631 4631 6068 6068 5906 5906 5412 5412 6224 6224 5925 5925
S10 4826 4826 6323 6323 6164 6164 5642 5642 6547 6547 6171 6171
S9 5632 5632 7385 7385 7202 7202 6604 6604 7663 7663 7211 7211
S8 5521 5521 7239 7239 7058 7058 6509 6509 7505 7505 7078 7078
S7 5598 5598 7328 7328 7150 7150 6653 6653 7643 7643 7182 7182
S6 5592 5592 7320 7320 7147 7147 6705 6705 7680 7680 7190 7190
S5 5341 5341 7011 7011 6843 6843 6457 6457 7364 7364 6898 6898
S4 6197 6197 8175 8175 7966 7966 7537 7537 8551 8551 8049 8049
S3 6355 6355 8365 8365 8161 8161 7796 7796 8855 8855 8258 8258
S2 6227 6227 8205 8205 8002 8002 7689 7689 8727 8727 8113 8113
S1 5962 5962 7872 7872 7670 7670 7403 7403 8398 8398 7794 7794

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsMain span-P19


2.5. Check

Cable Tensile Service Checking Strength Checking


Number area strength Nx max Fact. Allow. Nx max Fact. Allow.
Cable No of
Strands Ac f's SER su [s] S.F Check Phi STR g.Nu [N] S.F Check

(mm2) (Mpa) (KN) (Mpa) (Mpa) (KN) (KN) (KN)

3217 S17 19 2850.0 1860 2523.2 885.3 930.0 95.2% OK 0.74 3547.7 3547.7 3926.7 90.3% OK
3216 S16 22 3300.0 1860 2688.3 814.6 930.0 87.6% OK 0.74 3653.7 3653.7 4546.7 80.4% OK
3215 S15 22 3300.0 1860 2976.4 901.9 930.0 97.0% OK 0.74 4107.9 4107.9 4546.7 90.3% OK
3214 S14 31 4650.0 1860 3949.6 849.4 930.0 91.3% OK 0.74 5471.0 5471.0 6406.7 85.4% OK
3213 S13 31 4650.0 1860 4100.1 881.7 930.0 94.8% OK 0.74 5759.5 5759.5 6406.7 89.9% OK
3212 S12 31 4650.0 1860 4199.9 903.2 930.0 97.1% OK 0.74 5949.3 5949.3 6406.7 92.9% OK
3211 S11 37 5550.0 1860 4631.2 834.5 930.0 89.7% OK 0.74 6535.2 6535.2 7646.7 85.5% OK
3210 S10 37 5550.0 1860 4825.5 869.5 930.0 93.5% OK 0.74 6874.1 6874.1 7646.7 89.9% OK
3209 S9 43 6450.0 1860 5631.5 873.1 930.0 93.9% OK 0.74 8045.6 8045.6 8886.7 90.5% OK
3208 S8 43 6450.0 1860 5521.2 856.0 930.0 92.0% OK 0.74 7880.5 7880.5 8886.7 88.7% OK
3207 S7 43 6450.0 1860 5597.6 867.8 930.0 93.3% OK 0.74 8025.2 8025.2 8886.7 90.3% OK
3206 S6 43 6450.0 1860 5591.5 866.9 930.0 93.2% OK 0.74 8064.0 8064.0 8886.7 90.7% OK
3205 S5 43 6450.0 1860 5340.7 828.0 930.0 89.0% OK 0.74 7732.2 7732.2 8886.7 87.0% OK
3204 S4 55 8250.0 1860 6197.3 751.2 930.0 80.8% OK 0.74 8978.0 8978.0 11366.7 79.0% OK
3203 S3 55 8250.0 1860 6354.8 770.3 930.0 82.8% OK 0.74 9297.8 9297.8 11366.7 81.8% OK
3202 S2 55 8250.0 1860 6227.0 754.8 930.0 81.2% OK 0.74 9163.6 9163.6 11366.7 80.6% OK
3201 S1 55 8250.0 1860 5962.2 722.7 930.0 77.7% OK 0.74 8817.4 8817.4 11366.7 77.6% OK

100% SERVICE 100% STRENGTH


90% 90%

80% 80%

70% 70%

60% 60%

50% 50%

40%
40%
30%
30%
20%
20%
10%
10%
0%
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1
0%
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsMain span-P19


CABLE CHECKING
Item: Cable - Main Span P20

1. INPUT DATA
Specification: 22TCN 272-05
1.1. Material Spec. A421M-98a Strand Type 15.7 mm
Minimum specified ultimate tensile stress of prestressing stay cable f's = 1860 MPa
Minimum yield stress of prestressing stay cable fy = 1674 MPa
Modulus of elasticity of cable stayed Ep = 195000 MPa
Linear density of strand gs = 0.013 KN/m
1.2. Dimentions
Area of 1 strand Astr = 150.00 mm2
• The cables are arranged symmetrically in longitudinal and transeverse direction.
2. CHECKING
2.1. Resistance factor Load modifier = 1.05
Strength f = 0.74
Service f = 0.50
2.2. Equivalent Modulus of Elasticity
• In the inclined cables "sag" is caused by their self weight and, the cables have nonlinear
force-displacement relationships. Therefore, their linearization is needed for simplification of design.
• The equivalent modulus of elasticity proposed by Ernst formula is used for the linearization.
• Ernst formula for equivialent modulus of elasticity

E Where: E : Young's Modulus of cable


E eq  (Tangent modulus of elasticity) g : unit volumetric weight
 l2 2
1 E ℓ : cable length
12 f 1 3 f1 : initial stress (for dead load)
2.3. Detail stay cable force
Static load CR&SH Stay cable force due to service load (LL, BR, SE, TU, TG,WS, WL)
Cable CR-SH 1 CR-SH 2 LL BR SE TU TG WS WL
No DC DW EL CR&SH Max Max Max Max Max Max Max
During CS
30 years kN kN kN kN kN kN kN
S17 2265 11.5 160.5 -97 -228 129 4 3 76 0 116 5
S16 2320 100 211 -85.5 -178 193 4 3 67 1 148 7
S15 2405 182 190.5 -64 -118 222 4 3 43 0 120 5
S14 3068.5 346.5 193 -81 -110.5 332 4 4 33 1 129 6
S13 3292 412.5 140.5 -53 -68.5 341 3 3 13 0 90 4
S12 3305.5 457 113.5 -29 -31.5 343 3 2 9 0 57 3
S11 3527.5 578.5 121.5 -16 0 404 2 1 16 0 38 3
S10 3595.5 593.5 128 -0.5 32.5 395 2 1 19 0 10 3
S9 4116.5 696.5 163 9 65.5 456 2 1 21 0 16 3
S8 4035 692 183.5 23 80 451 1 2 19 0 44 3
S7 4379.5 678 198.5 34.5 75.5 442 1 5 15 0 72 3
S6 4388.5 654 202.5 42 55.5 431 1 8 8 0 100 3
S5 4052 621 191.5 38 22.5 418 2 11 2 0 129 3
S4 5110.5 742 209 21 -24.5 519 2 19 18 2 196 4
S3 5177.5 677 164 9.5 -82.5 507 3 23 37 3 231 5
S2 5057.5 608 103 -7.5 -146 504 3 28 58 5 265 5
S1 5198.5 527.5 20 -33 -209 500 3 32 81 7 293 6

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsMain span-P20


2.4. Load factors and load combination
Load factors.
SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ
At At
LOAD At Bridge At Bridge At Bridge At Bridge
Bridge At end At end At end Bridge At end At end At end
Completi Completio Completi Completio
Comple creep creep creep Comple creep creep creep
on n on n
tion tion
DC 1.0 1.0 1.25 1.25 1.25 1.25 1.25 1.25 1.50 1.50 1.25 1.25
DW 1.0 1.0 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
EL 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH1 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH2 - - - - - - - - - - - -
LL 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
BR 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
SE - - - - - - - - - - - -
TU 1.0 1.0 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
TG 0.5 0.5 - - - - - - - - - -
WS 0.3 0.3 - - - - 1.40 1.40 - - 0.40 0.40
WL 1.0 1.0 - - - - - - - - 1.00 1.00

Stay cable force


SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ

Cable At At
At Bridge At Bridge At Bridge At Bridge
No Bridge At end At end At end Bridge At end At end At end
Completi Completio Completi Completio
Comple creep creep creep Comple creep creep creep
on n on n
tion tion
S17 2589 2589 3183 3183 3130 3130 3112 3112 3516 3516 3181 3181
S16 2861 2861 3554 3554 3475 3475 3416 3416 3789 3789 3541 3541
S15 3024 3024 3823 3823 3732 3732 3595 3595 4029 4029 3785 3785
S14 3941 3941 5072 5072 4937 4937 4664 4664 5251 5251 4995 4995
S13 4180 4180 5430 5430 5292 5292 4954 4954 5651 5651 5332 5332
S12 4222 4222 5512 5512 5373 5373 4986 4986 5733 5733 5399 5399
S11 4648 4648 6101 6101 5939 5939 5444 5444 6273 6273 5957 5957
S10 4739 4739 6216 6216 6058 6058 5536 5536 6421 6421 6065 6065
S9 5472 5472 7174 7174 6991 6991 6395 6395 7402 7402 7001 7001
S8 5421 5421 7089 7089 6908 6908 6359 6359 7307 7307 6929 6929
S7 5773 5773 7507 7507 7330 7330 6833 6833 7827 7827 7362 7362
S6 5760 5760 7471 7471 7298 7298 6855 6855 7812 7812 7341 7341
S5 5366 5366 6962 6962 6794 6794 6408 6408 7240 7240 6849 6849
S4 6685 6685 8652 8652 8443 8443 8015 8015 9018 9018 8526 8526
S3 6651 6651 8572 8572 8368 8368 8003 8003 8974 8974 8465 8465
S2 6413 6413 8246 8246 8043 8043 7729 7729 8623 8623 8154 8154
S1 6394 6394 8197 8197 7996 7996 7727 7727 8617 8617 8119 8119

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsMain span-P20


2.5. Check

Cable Tensile Service Checking Strength Checking


Number area strength Nx max Fact. Allow. Nx max Fact. Allow.
Cable
of
No
Strands Ac f's SER su [s] S.F Check Phi STR g.Nu [N] S.F Check

(mm2) (Mpa) (KN) (Mpa) (Mpa) (KN) (KN) (KN)

3317 S17 19 2850.0 1860 2588.8 908.4 930.0 97.7% OK 0.74 3692.1 3692.1 3926.7 94.0% OK
3316 S16 22 3300.0 1860 2861.4 867.1 930.0 93.2% OK 0.74 3978.5 3978.5 4546.7 87.5% OK
3315 S15 22 3300.0 1860 3023.5 916.2 930.0 98.5% OK 0.74 4229.9 4229.9 4546.7 93.0% OK
3314 S14 31 4650.0 1860 3941.2 847.6 930.0 91.1% OK 0.74 5513.6 5513.6 6406.7 86.1% OK
3313 S13 31 4650.0 1860 4180.0 898.9 930.0 96.7% OK 0.74 5933.3 5933.3 6406.7 92.6% OK
3312 S12 31 4650.0 1860 4222.1 908.0 930.0 97.6% OK 0.74 6019.4 6019.4 6406.7 94.0% OK
3311 S11 37 5550.0 1860 4647.9 837.5 930.0 90.0% OK 0.74 6586.1 6586.1 7646.7 86.1% OK
3310 S10 37 5550.0 1860 4738.5 853.8 930.0 91.8% OK 0.74 6741.5 6741.5 7646.7 88.2% OK
3309 S9 43 6450.0 1860 5471.8 848.3 930.0 91.2% OK 0.74 7772.1 7772.1 8886.7 87.5% OK
3308 S8 43 6450.0 1860 5420.7 840.4 930.0 90.4% OK 0.74 7671.8 7671.8 8886.7 86.3% OK
3307 S7 43 6450.0 1860 5773.1 895.1 930.0 96.2% OK 0.74 8218.1 8218.1 8886.7 92.5% OK
3306 S6 43 6450.0 1860 5760.0 893.0 930.0 96.0% OK 0.74 8202.9 8202.9 8886.7 92.3% OK
3305 S5 43 6450.0 1860 5366.2 832.0 930.0 89.5% OK 0.74 7602.0 7602.0 8886.7 85.5% OK
3304 S4 55 8250.0 1860 6685.3 810.3 930.0 87.1% OK 0.74 9468.6 9468.6 11366.7 83.3% OK
3303 S3 55 8250.0 1860 6650.8 806.2 930.0 86.7% OK 0.74 9422.4 9422.4 11366.7 82.9% OK
3302 S2 55 8250.0 1860 6413.0 777.3 930.0 83.6% OK 0.74 9053.9 9053.9 11366.7 79.7% OK
3301 S1 55 8250.0 1860 6394.4 775.1 930.0 83.3% OK 0.74 9047.3 9047.3 11366.7 79.6% OK

100% SERVICE 100% STRENGTH


90% 90%

80% 80%

70% 70%

60% 60%

50% 50%

40%
40%
30%
30%
20%
20%
10%
10%
0%
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1
0%
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsMain span-P20


CABLE CHECKING
Item: Cable - Side Span P20

1. INPUT DATA
Specification: 22TCN 272-05
1.1. Material Spec. A421M-98a Strand Type 15.7 mm
Minimum specified ultimate tensile stress of prestressing stay cable f's = 1860 MPa
Minimum yield stress of prestressing stay cable fy = 1674 MPa
Modulus of elasticity of stay cable Ep = 195000 MPa
Linear density of strand gs = 0.013 KN/m
1.2. Dimentions
Area of 1 Strand Astr = 150.00 mm2
• The cables are arranged symmetrically in longitudinal and transeverse direction.
2. CHECKING
2.1. Resistance factor Load modifier = 1.05
Strength f = 0.74
Service f = 0.50
2.2. Equivalent Modulus of Elasticity
• In the inclined cables "sag" is caused by their self weight and, the cables have nonlinear
force-displacement relationships. Therefore, their linearization is needed for simplification of design.
• The equivalent modulus of elasticity proposed by Ernst formula is used for the linearization.
• Ernst formula for equivialent modulus of elasticity

E Where: E : Young's Modulus of cable


E eq  (Tangent modulus of elasticity) g : unit volumetric weight of cable
 l 2 2
1 E ℓ : cable length
12 f 1 3 f1 : initial stress (for dead load)
2.3. Detail stay cable force
Static load CR&SH Stay cable force due to service load (LL, BR, SE, TU, TG,WS, WL)
CR-SH 1 CR-SH 2 LL BR SE TU TG WS WL
Max Max Max Max Max Max Max
Cable No
DC DW EL CR&SH
During CS
30 years kN kN kN kN kN kN kN
S17 2331.5 125 -19 -82.5 -180.5 136 3 3 54 4 115 5
S16 2314 219.5 21.5 -68.5 -130.5 201 4 4 46 3 146 7
S15 2370.5 274.5 44 -53.5 -85.5 229 4 3 30 2 118 5
S14 3306 437 53 -80 -91.5 340 4 4 24 0 127 6
S13 3349.5 466 59.5 -55 -73.5 349 3 3 13 1 88 4
S12 3241.5 480 81 -36.5 -61.5 346 2 2 5 1 55 3
S11 3712 578.5 129.5 -35.5 -64 396 2 2 7 2 35 3
S10 3701.5 572 171.5 -18.5 -57 381 2 1 6 2 7 3
S9 4144.5 654 245 -11 -63.5 424 1 1 3 3 19 3
S8 3913 637.5 288 1 -66.5 403 2 4 2 3 47 3
S7 4180.5 617.5 317 12.5 -68.5 381 2 7 7 2 75 3
S6 4217.5 593 326.5 19.5 -63.5 360 2 10 14 2 103 3
S5 4321.5 566 313 19 -49 370 2 13 21 1 131 3
S4 5297.5 686.5 349.5 15.5 -33.5 530 3 21 37 0 197 4
S3 5374.5 644.5 276.5 25 5.5 612 3 26 47 6 231 5
S2 5170 607.5 174.5 31 54.5 709 3 30 57 14 264 5
S1 4939.5 566 -202.5 1 110 791 4 34 66 23 290 6

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsSide span-P20


2.4. Load factors and load combination
Load factors.
SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ

LOAD At Bridge At Bridge At Bridge At Bridge At Bridge At Bridge


At end At end At end At end At end At end
Completi Completi Completi Completio Completio Completi
creep creep creep creep creep creep
on on on n n on

DC 1.0 1.0 1.25 1.25 1.25 1.25 1.25 1.25 1.50 1.50 1.25 1.25
DW 1.0 1.0 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
EL 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH1 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH2 - - - - - - - - - - - -
LL 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
BR 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
SE - - - - - - - - - - - -
TU 1.0 1.0 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
TG 0.5 0.5 - - - - - - - - - -
WS 0.3 0.3 - - - - 1.40 1.40 - - 0.40 0.40
WL 1.0 1.0 - - - - - - - - 1.00 1.00

Stay cable force


SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ

Cable No At Bridge At end


At Bridge
At end
At Bridge
At end
At Bridge
At end
At Bridge
At end
At Bridge
At end
Completi Completi Completi Completio Completio Completi
creep creep creep creep creep creep
on on on n n on

S17 2590 2590 3271 3271 3215 3215 3188 3188 3610 3610 3266 3266
S16 2790 2790 3557 3557 3475 3475 3402 3402 3776 3776 3540 3540
S15 2940 2940 3788 3788 3695 3695 3546 3546 3973 3973 3747 3747
S14 4128 4128 5375 5375 5237 5237 4951 4951 5600 5600 5294 5294
S13 4216 4216 5513 5513 5372 5372 5020 5020 5734 5734 5411 5411
S12 4139 4139 5428 5428 5289 5289 4896 4896 5629 5629 5314 5314
S11 4804 4804 6302 6302 6143 6143 5654 5654 6533 6533 6160 6160
S10 4822 4822 6311 6311 6158 6158 5651 5651 6566 6566 6164 6164
S9 5471 5471 7141 7141 6971 6971 6424 6424 7433 7433 6981 6981
S8 5265 5265 6846 6846 6684 6684 6203 6203 7116 7116 6706 6706
S7 5544 5544 7155 7155 7002 7002 6590 6590 7530 7530 7035 7035
S6 5567 5567 7148 7148 7003 7003 6659 6659 7569 7569 7047 7047
S5 5655 5655 7244 7244 7096 7096 6777 6777 7674 7674 7151 7151
S4 6982 6982 8968 8968 8755 8755 8311 8311 9360 9360 8837 8837
S3 7060 7060 9086 9086 8840 8840 8333 8333 9354 9354 8938 8938
S2 6843 6843 8854 8854 8569 8569 7977 7977 8900 8900 8680 8680
S1 6270 6270 8246 8246 7928 7928 7261 7261 8090 8090 8050 8050

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsSide span-P20


2.3 Factored Resistance

Cable Tensile Service Checking Strength Checking


Number area strength Nx max Fact. Allow. Nx max Fact. Allow.
Cable No of
Strands Ac f's SER su [s] S.F Check Phi STR g.Nu [N] S.F Check

(mm2) (Mpa) (KN) (Mpa) (Mpa) (KN) (KN) (KN)

### S17 19 2850 1860 2589.5 908.6 930.0 97.7% OK 0.74 3790.8 3790.8 3926.7 96.5% OK
### S16 22 3300 1860 2789.8 845.4 930.0 90.9% OK 0.74 3965.1 3965.1 4546.7 87.2% OK
### S15 22 3300 1860 2939.9 890.9 930.0 95.8% OK 0.74 4171.7 4171.7 4546.7 91.8% OK
### S14 31 4650 1860 4128.1 887.8 930.0 95.5% OK 0.74 5879.5 5879.5 6406.7 91.8% OK
### S13 31 4650 1860 4215.9 906.6 930.0 97.5% OK 0.74 6021.0 6021.0 6406.7 94.0% OK
### S12 31 4650 1860 4139.0 890.1 930.0 95.7% OK 0.74 5910.7 5910.7 6406.7 92.3% OK
### S11 37 5550 1860 4804.0 865.6 930.0 93.1% OK 0.74 6859.9 6859.9 7646.7 89.7% OK
### S10 37 5550 1860 4821.6 868.8 930.0 93.4% OK 0.74 6894.6 6894.6 7646.7 90.2% OK
### S9 43 6450 1860 5470.7 848.2 930.0 91.2% OK 0.74 7804.9 7804.9 8886.7 87.8% OK
### S8 43 6450 1860 5265.1 816.3 930.0 87.8% OK 0.74 7471.5 7471.5 8886.7 84.1% OK
### S7 43 6450 1860 5544.0 859.5 930.0 92.4% OK 0.74 7906.5 7906.5 8886.7 89.0% OK
### S6 43 6450 1860 5567.4 863.2 930.0 92.8% OK 0.74 7947.2 7947.2 8886.7 89.4% OK
### S5 43 6450 1860 5655.3 876.8 930.0 94.3% OK 0.74 8057.4 8057.4 8886.7 90.7% OK
### S4 55 8250 1860 6982.1 846.3 930.0 91.0% OK 0.74 9827.5 9827.5 11366.7 86.5% OK
### S3 55 8250 1860 7059.8 855.7 930.0 92.0% OK 0.74 9821.2 9821.2 11366.7 86.4% OK
### S2 55 8250 1860 6843.2 829.5 930.0 89.2% OK 0.74 9345.3 9345.3 11366.7 82.2% OK
### S1 55 8250 1860 6269.5 759.9 930.0 81.7% OK 0.74 8658.4 8658.4 11366.7 76.2% OK

SERVICE STRENGTH
100%
100%
90%
90%
80%
80%
70%
70%

60% 60%

50% 50%

40% 40%

30% 30%

20% 20%

10% 10%

0% 0%

S9

S8

S7

S6

S5

S4

S3

S2

S1
S17

S16

S15

S14

S13

S12

S11

S10
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1

20180822_BK. CHECK STAYED CABLE (Gama_04 lane).xlsSide span-P20


CHECKING STAY CABLE AT STAGE:
AT CREEP END
CABLE CHECKING
Item: Cable - Side Stay P19

1. INPUT DATA
Specification: 22TCN 272-05
1.1. Material Spec. A421M-98a Strand Type 15.7 mm
Minimum specified ultimate tensile stress of prestressing stay cable f's = 1860 MPa
Minimum yield stress of prestressing stay cable fy = 1674 MPa
Modulus of elasticity of stay cable Ep =195000 MPa
Linear density of strand gs = 0.013 KN/m
1.2. Dimentions
Area of 1 Strand Astr = 150.00 mm2
• The cables are arranged symmetrically in longitudinal and transeverse direction.
2. CHECKING
2.1. Resistance factor Load modifier = 1.05
Strength f = 0.74
Service f = 0.50
2.2.
• In the inclined cables "sag" is caused by their self weight and, the cables have nonlinear
force-displacement relationships. Therefore, their linearization is needed for simplification of design.
• The equivalent modulus of elasticity proposed by Ernst formula is used for the linearization.
• Ernst formula for equivialent modulus of elasticity

E Where: E : Young's Modulus of cable


E eq  (Tangent modulus of elasticity) g : unit volumetric weight of cable
 l 2 2
1 E ℓ : cable length
12 f 1 3 f1 : initial stress (for dead load)
2.3. Detail stay cable force
Static load CR&SH Stay cable force due to service load (LL, BR, SE, TU, TG,WS, WL)
CR-SH 1 CR-SH 2 LL BR SE TU TG WS WL
Max Max Max Max Max Max Max
Cable No
DC DW EL CR&SH
During CS
30 years kN kN kN kN kN kN kN
S17 2379.5 124.5 -42.5 -97.5 -186.5 242 9 3 54 4 118 6
S16 2312.5 219.5 8 -83 -136.5 292 15 4 46 3 150 7
S15 2408.5 274 47 -68.5 -88 238 19 3 30 2 121 5
S14 3331.5 436.5 76.5 -97.5 -87.5 341 28 4 24 0 130 6
S13 3293.5 466 94 -63.5 -63.5 349 29 3 12 1 90 4
S12 3235 480.5 116 -39.5 -43.5 346 29 2 5 1 57 3
S11 3660 578 159.5 -31 -30.5 396 34 2 7 2 37 3
S10 3681.5 571.5 178 -12.5 -11 381 31 1 6 2 8 3
S9 4123.5 653.5 212 -2.5 4.5 424 33 1 3 3 19 3
S8 4014.5 637.5 202.5 7 13 404 29 4 2 3 48 3
S7 4158.5 618 168.5 18.5 18 381 23 7 7 2 76 3
S6 4200 594 106 22.5 23.5 360 17 10 14 2 105 3
S5 4360.5 566.5 14 19.5 32 370 18 13 21 1 134 3
S4 5384.5 688 -138 12.5 52.5 531 29 21 37 0 201 4
S3 5533 646 -315 21.5 66.5 612 35 26 47 6 236 5
S2 5891 609 -519.5 30 85 710 41 30 57 14 270 5
S1 5500.5 567.5 -982 17 110.5 792 46 34 66 23 297 6

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsSide span-P19


2.4. Load factors and load combination
Load factors.
SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ

LOAD At Bridge At Bridge At Bridge At Bridge At Bridge At Bridge


At end At end At end At end At end At end
Completi Completi Completi Completi Completi Completi
creep creep creep creep creep creep
on on on on on on

DC 1.0 1.0 1.25 1.25 1.25 1.25 1.25 1.25 1.50 1.50 1.25 1.25
DW 1.0 1.0 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
EL 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH1 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH2 - 1.0 - 0.50 - 0.50 - 0.50 - 0.50 - 0.50
LL 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
BR 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
SE - - - - - - - - - - - -
TU 1.0 1.0 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
TG 0.5 0.5 - - - - - - - - - -
WS 0.3 0.3 - - - - 1.40 1.40 - - 0.40 0.40
WL 1.0 1.0 - - - - - - - - 1.00 1.00

Stay cable force


SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ

Cable No At Bridge At end At Bridge


At end
At Bridge
At end
At Bridge
At end
At Bridge
At end
At Bridge
At end
Completi Completi Completi Completi Completi Completi
creep creep creep creep creep creep
on on on on on on

S17 2712 2526 3487 3394 3387 3294 3213 3120 3643 3550 3440 3347
S16 2864 2727 3705 3637 3582 3514 3378 3310 3746 3678 3649 3581
S15 2990 2902 3865 3821 3762 3718 3585 3541 4017 3973 3815 3771
S14 4185 4098 5456 5412 5308 5265 4992 4948 5643 5599 5366 5323
S13 4212 4148 5514 5482 5363 5331 4978 4947 5676 5644 5403 5371
S12 4193 4149 5500 5478 5350 5328 4923 4902 5652 5631 5376 5354
S11 4819 4788 6327 6311 6155 6139 5626 5611 6489 6474 6172 6157
S10 4843 4832 6349 6343 6184 6178 5639 5633 6548 6543 6190 6185
S9 5457 5461 7145 7148 6963 6965 6372 6374 7377 7379 6973 6975
S8 5315 5328 6943 6949 6769 6776 6252 6259 7189 7195 6792 6798
S7 5401 5419 7023 7032 6861 6870 6422 6431 7355 7364 6894 6903
S6 5349 5373 6936 6948 6785 6797 6424 6435 7327 7338 6830 6842
S5 5413 5445 7023 7039 6868 6884 6532 6548 7435 7451 6925 6941
S4 6608 6661 8636 8662 8412 8438 7937 7963 9002 9028 8496 8522
S3 6658 6725 8748 8781 8489 8522 7946 7979 8999 9032 8588 8621
S2 6912 6997 9131 9173 8830 8873 8194 8237 9289 9332 8943 8986
S1 6114 6224 8261 8317 7926 7981 7211 7266 8170 8225 8051 8106

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsSide span-P19


2.5. Check

Cable Tensile Service Checking - Creep End only Strength Checking - Creep End only
Number area strength Nx max Fact. Allow. Nx max Fact. Allow.
Cable No of
Strands Ac f's SER max su [s] S.F Check Phi STR max g.Nu [N] S.F Check

(mm2) (Mpa) (KN) (Mpa) (Mpa) (KN) (KN) (KN)

### S17 19 2850.0 1860 2525.9 886.3 930.0 95.3% OK 0.74 3549.8 3727.2 3926.7 94.9% OK
### S16 22 3300.0 1860 2727.0 826.4 930.0 88.9% OK 0.74 3677.8 3861.6 4546.7 84.9% OK
### S15 22 3300.0 1860 2902.3 879.5 930.0 94.6% OK 0.74 3973.3 4171.9 4546.7 91.8% OK
### S14 31 4650.0 1860 4097.5 881.2 930.0 94.8% OK 0.74 5599.3 5879.2 6406.7 91.8% OK
### S13 31 4650.0 1860 4148.0 892.0 930.0 95.9% OK 0.74 5644.0 5926.2 6406.7 92.5% OK
### S12 31 4650.0 1860 4149.1 892.3 930.0 95.9% OK 0.74 5630.5 5912.0 6406.7 92.3% OK
### S11 37 5550.0 1860 4788.1 862.7 930.0 92.8% OK 0.74 6473.8 6797.4 7646.7 88.9% OK
### S10 37 5550.0 1860 4831.9 870.6 930.0 93.6% OK 0.74 6542.5 6869.6 7646.7 89.8% OK
### S9 43 6450.0 1860 5461.2 846.7 930.0 91.0% OK 0.74 7378.8 7747.7 8886.7 87.2% OK
### S8 43 6450.0 1860 5328.4 826.1 930.0 88.8% OK 0.74 7195.0 7554.8 8886.7 85.0% OK
### S7 43 6450.0 1860 5419.3 840.2 930.0 90.3% OK 0.74 7364.3 7732.5 8886.7 87.0% OK
### S6 43 6450.0 1860 5372.5 832.9 930.0 89.6% OK 0.74 7338.3 7705.2 8886.7 86.7% OK
### S5 43 6450.0 1860 5445.2 844.2 930.0 90.8% OK 0.74 7450.5 7823.0 8886.7 88.0% OK
### S4 55 8250.0 1860 6660.8 807.4 930.0 86.8% OK 0.74 9028.0 9479.4 11366.7 83.4% OK
### S3 55 8250.0 1860 6724.8 815.1 930.0 87.6% OK 0.74 9031.8 9483.3 11366.7 83.4% OK
### S2 55 8250.0 1860 6996.5 848.1 930.0 91.2% OK 0.74 9331.5 9798.1 11366.7 86.2% OK
### S1 55 8250.0 1860 6224.1 754.4 930.0 81.1% OK 0.74 8316.6 8732.5 11366.7 76.8% OK

SERVICE STRENGTH
100%
100%
90%
90%
80%
80%
70%
70%

60% 60%

50% 50%

40% 40%

30% 30%

20% 20%

10% 10%

0% 0%
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsSide span-P19


CABLE CHECKING
Item: Cable - Main span P19

1. INPUT DATA
Specification: 22TCN 272-05
1.1. Material Spec. A421M-98a Strand Type 15.7 mm
Minimum specified ultimate tensile stress of prestressing stay cable f's = 1860 MPa
Minimum yield stress of prestressing stay cable fy = 1674 MPa
Modulus of elasticity of cable stayed Ep = 195000 MPa
Linear density of strand gs = 0.013 KN/m
1.2. Dimentions
Area of 1 strand Astr = 150.00 mm2
• The cables are arranged symmetrically in longitudinal and transeverse direction.
2. CHECKING
2.1. Resistance factor Load modifier = 1.05
Strength f = 0.74
Service f = 0.50
2.2. Equivalent Modulus of Elasticity
• In the inclined cables "sag" is caused by their self weight and, the cables have nonlinear
force-displacement relationships. Therefore, their linearization is needed for simplification of design.
• The equivalent modulus of elasticity proposed by Ernst formula is used for the linearization.
• Ernst formula for equivialent modulus of elasticity

E Where: E : Young's Modulus of cable


E eq  (Tangent modulus of elasticity) g : unit volumetric weight
 l 2 2
1 E ℓ : cable length
12 f 1 3 f1 : initial stress (for dead load)
2.3. Detail stay cable force
Static load CR&SH Stay cable force due to service load (LL, BR, SE, TU, TG,WS, WL)
CR-SH 1 CR-SH 2 LL BR SE TU TG WS WL
Max Max Max Max Max Max Max
Cable No
DC DW EL During CR&SH
CS 30 years kN kN kN kN kN kN kN
S17 2124.5 12 220.5 -84.5 -210 129 9 3 76 0 119 6
S16 2051 100.5 288 -69 -154 193 15 3 67 1 151 7
S15 2270.5 182 268 -56 -95.5 222 18 3 43 0 123 6
S14 2972 347 296.5 -81 -84.5 332 28 4 33 1 132 6
S13 3122 412.5 233 -56 -49 341 28 3 13 0 92 4
S12 3217 457 189 -38.5 -17 343 28 2 9 0 58 3
S11 3464.5 578.5 184.5 -33 16 404 32 1 16 0 39 3
S10 3674.5 593 154.5 -18.5 51.5 395 31 1 19 0 10 3
S9 4317 697 141.5 -10.5 96 456 34 1 21 0 15 3
S8 4231 692.5 98.5 12 122.5 451 32 2 19 0 44 3
S7 4363 678 41 33 129.5 442 30 5 15 0 72 3
S6 4458.5 654.5 -36.5 43 118.5 430 28 8 8 0 100 3
S5 4350.5 621.5 -136 41 90 418 25 11 2 0 129 3
S4 5151 743 -328.5 29 62 519 30 19 18 2 196 4
S3 5531 678 -490.5 13.5 -3 507 28 23 37 3 231 5
S2 5637.5 609 -667.5 -4 -76.5 504 27 28 58 5 265 5
S1 5624.5 528.5 -847.5 -25 -152.5 500 26 32 81 7 294 6

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsMain span-P19


2.4. Load factors and load combination
Load factors.
SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ
At At
LOAD At Bridge At Bridge At Bridge At Bridge
At end At end At end Bridge At end At end Bridge At end
Completi Completi Completi Completi
creep creep creep Complet creep creep Completi creep
on on on on
ion on
DC 1.0 1.0 1.25 1.25 1.25 1.25 1.25 1.25 1.50 1.50 1.25 1.25
DW 1.0 1.0 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
EL 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH1 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH2 - 1.0 - 0.50 - 0.50 - 0.50 - 0.50 - 0.50
LL 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
BR 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
SE - - - - - - - - - - - -
TU 1.0 1.0 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
TG 0.5 0.5 - - - - - - - - - -
WS 0.3 0.3 - - - - 1.40 1.40 - - 0.40 0.40
WL 1.0 1.0 - - - - - - - - 1.00 1.00

Stay cable force


SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ
At At
Cable No At Bridge At end
At Bridge
At end
At Bridge
At end Bridge At end
At Bridge
At end Bridge At end
Completi Completi Completi Completi
creep creep creep Complet creep creep Completi creep
on on on on
ion on
S17 2528 2318 3089 2984 3034 2929 3014 2909 3379 3274 3088 2983
S16 2698 2544 3331 3254 3248 3171 3178 3101 3480 3403 3315 3238
S15 2990 2895 3765 3717 3669 3621 3517 3469 3912 3865 3724 3676
S14 3974 3889 5098 5055 4954 4911 4652 4610 5211 5168 5012 4970
S13 4125 4076 5351 5326 5203 5178 4834 4809 5485 5461 5244 5219
S12 4225 4208 5511 5503 5363 5354 4943 4934 5666 5658 5389 5380
S11 4661 4677 6121 6129 5946 5954 5412 5420 6224 6232 5965 5973
S10 4855 4906 6374 6399 6203 6229 5642 5668 6547 6573 6210 6236
S9 5664 5760 7441 7489 7245 7293 6604 6652 7663 7711 7254 7302
S8 5552 5675 7293 7354 7100 7161 6509 6570 7505 7567 7120 7181
S7 5627 5756 7378 7443 7189 7254 6653 6718 7643 7708 7221 7286
S6 5619 5737 7367 7426 7184 7243 6705 6765 7680 7739 7227 7286
S5 5364 5454 7052 7097 6874 6919 6457 6502 7364 7409 6929 6974
S4 6225 6287 8224 8255 8004 8035 7537 7568 8551 8582 8086 8117
S3 6380 6377 8409 8407 8195 8193 7796 7794 8855 8854 8292 8290
S2 6251 6175 8247 8209 8035 7996 7689 7651 8727 8689 8146 8107
S1 5985 5833 7912 7836 7701 7625 7403 7327 8398 8321 7825 7749

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsMain span-P19


2.5. Check

Cable Tensile Service Checking - Creep End only Strength Checking - Creep End only
Number area strength Nx max Fact. Allow. Nx max Fact. Allow.
Cable No of
Strands Ac f's SER su [s] S.F Check Phi STR g.Nu [N] S.F Check

(mm2) (Mpa) (KN) (Mpa) (Mpa) (KN) (KN) (KN)

3217 S17 19 2850.0 1860 2318.2 813.4 930.0 87.5% OK 0.74 3273.8 3437.4 3926.7 87.5% OK
3216 S16 22 3300.0 1860 2544.3 771.0 930.0 82.9% OK 0.74 3402.8 3572.9 4546.7 78.6% OK
3215 S15 22 3300.0 1860 2894.9 877.2 930.0 94.3% OK 0.74 3864.5 4057.7 4546.7 89.2% OK
3214 S14 31 4650.0 1860 3889.1 836.4 930.0 89.9% OK 0.74 5168.3 5426.7 6406.7 84.7% OK
3213 S13 31 4650.0 1860 4076.1 876.6 930.0 94.3% OK 0.74 5460.8 5733.8 6406.7 89.5% OK
3212 S12 31 4650.0 1860 4207.9 904.9 930.0 97.3% OK 0.74 5657.5 5940.4 6406.7 92.7% OK
3211 S11 37 5550.0 1860 4677.2 842.7 930.0 90.6% OK 0.74 6232.0 6543.6 7646.7 85.6% OK
3210 S10 37 5550.0 1860 4906.0 884.0 930.0 95.0% OK 0.74 6572.5 6901.1 7646.7 90.3% OK
3209 S9 43 6450.0 1860 5759.5 892.9 930.0 96.0% OK 0.74 7710.5 8096.0 8886.7 91.1% OK
3208 S8 43 6450.0 1860 5674.7 879.8 930.0 94.6% OK 0.74 7566.5 7944.8 8886.7 89.4% OK
3207 S7 43 6450.0 1860 5756.1 892.4 930.0 96.0% OK 0.74 7707.8 8093.1 8886.7 91.1% OK
3206 S6 43 6450.0 1860 5737.0 889.5 930.0 95.6% OK 0.74 7739.3 8126.2 8886.7 91.4% OK
3205 S5 43 6450.0 1860 5453.7 845.5 930.0 90.9% OK 0.74 7409.0 7779.5 8886.7 87.5% OK
3204 S4 55 8250.0 1860 6287.3 762.1 930.0 81.9% OK 0.74 8581.5 9010.6 11366.7 79.3% OK
3203 S3 55 8250.0 1860 6376.8 772.9 930.0 83.1% OK 0.74 8853.5 9296.2 11366.7 81.8% OK
3202 S2 55 8250.0 1860 6174.5 748.4 930.0 80.5% OK 0.74 8689.0 9123.5 11366.7 80.3% OK
3201 S1 55 8250.0 1860 5832.7 707.0 930.0 76.0% OK 0.74 8321.3 8737.3 11366.7 76.9% OK

100% SERVICE 100% STRENGTH


90% 90%

80% 80%

70% 70%

60% 60%

50% 50%

40%
40%
30%
30%
20%
20%
10%
10%
0%
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1
0%
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsMain span-P19


CABLE CHECKING
Item: Cable - Main Span P20

1. INPUT DATA
Specification: 22TCN 272-05
1.1. Material Spec. A421M-98a Strand Type 15.7 mm
Minimum specified ultimate tensile stress of prestressing stay cable f's = 1860 MPa
Minimum yield stress of prestressing stay cable fy = 1674 MPa
Modulus of elasticity of cable stayed Ep = 195000 MPa
Linear density of strand gs = 0.013 KN/m
1.2. Dimentions
Area of 1 strand Astr = 150.00 mm2
• The cables are arranged symmetrically in longitudinal and transeverse direction.
2. CHECKING
2.1. Resistance factor Load modifier = 1.05
Strength f = 0.74
Service f = 0.50
2.2. Equivalent Modulus of Elasticity
• In the inclined cables "sag" is caused by their self weight and, the cables have nonlinear
force-displacement relationships. Therefore, their linearization is needed for simplification of design.
• The equivalent modulus of elasticity proposed by Ernst formula is used for the linearization.
• Ernst formula for equivialent modulus of elasticity

E Where: E : Young's Modulus of cable


E eq  (Tangent modulus of elasticity) g : unit volumetric weight
 l2 2
1 E ℓ : cable length
12 f 1 3 f1 : initial stress (for dead load)
2.3. Detail stay cable force
Static load CR&SH Stay cable force due to service load (LL, BR, SE, TU, TG,WS, WL)
Cable CR-SH 1 CR-SH 2 LL BR SE TU TG WS WL
No DC DW EL CR&SH Max Max Max Max Max Max Max
During CS
30 years kN kN kN kN kN kN kN
S17 2265 11.5 160.5 -97 -228 241 9 3 76 0 116 5
S16 2320 100 211 -85.5 -178 291 15 3 67 1 148 7
S15 2405 182 190.5 -64 -118 239 18 3 43 0 120 5
S14 3068.5 346.5 193 -81 -110.5 332 28 4 33 1 129 6
S13 3292 412.5 140.5 -53 -68.5 341 28 3 13 0 90 4
S12 3305.5 457 113.5 -29 -31.5 343 28 2 9 0 57 3
S11 3527.5 578.5 121.5 -16 0 404 32 1 16 0 38 3
S10 3595.5 593.5 128 -0.5 32.5 395 31 1 19 0 10 3
S9 4116.5 696.5 163 9 65.5 456 34 1 21 0 16 3
S8 4035 692 183.5 23 80 451 32 2 19 0 44 3
S7 4379.5 678 198.5 34.5 75.5 442 30 5 15 0 72 3
S6 4388.5 654 202.5 42 55.5 431 28 8 8 0 100 3
S5 4052 621 191.5 38 22.5 418 25 11 2 0 129 3
S4 5110.5 742 209 21 -24.5 519 30 19 18 2 196 4
S3 5177.5 677 164 9.5 -82.5 507 28 23 37 3 231 5
S2 5057.5 608 103 -7.5 -146 504 27 28 58 5 265 5
S1 5198.5 527.5 20 -33 -209 500 26 32 81 7 293 6

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsMain span-P20


2.4. Load factors and load combination
Load factors.
SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ
At At
LOAD At Bridge At Bridge At Bridge At Bridge
Bridge At end At end At end Bridge At end At end At end
Completi Completio Completi Completio
Comple creep creep creep Comple creep creep creep
on n on n
tion tion
DC 1.0 1.0 1.25 1.25 1.25 1.25 1.25 1.25 1.50 1.50 1.25 1.25
DW 1.0 1.0 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
EL 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH1 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH2 - 1.0 - 0.50 - 0.50 - 0.50 - 0.50 - 0.50
LL 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
BR 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
SE - - - - - - - - - - - -
TU 1.0 1.0 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
TG 0.5 0.5 - - - - - - - - - -
WS 0.3 0.3 - - - - 1.40 1.40 - - 0.40 0.40
WL 1.0 1.0 - - - - - - - - 1.00 1.00

Stay cable force


SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ

Cable At At
At Bridge At Bridge At Bridge At Bridge
No Bridge At end At end At end Bridge At end At end At end
Completi Completio Completi Completio
Comple creep creep creep Comple creep creep creep
on n on n
tion tion
S17 2706 2478 3388 3274 3288 3174 3112 2998 3516 3402 3339 3225
S16 2970 2792 3745 3656 3622 3533 3416 3327 3789 3700 3688 3599
S15 3055 2937 3877 3818 3774 3715 3595 3536 4029 3970 3827 3768
S14 3965 3855 5114 5059 4970 4915 4664 4609 5251 5196 5027 4972
S13 4205 4137 5474 5439 5326 5292 4954 4920 5651 5617 5366 5332
S12 4247 4216 5556 5540 5407 5391 4986 4970 5733 5717 5433 5417
S11 4678 4678 6154 6154 5979 5979 5444 5444 6273 6273 5997 5997
S10 4768 4800 6267 6283 6097 6113 5536 5552 6421 6437 6104 6120
S9 5504 5569 7230 7263 7034 7067 6395 6428 7402 7435 7044 7077
S8 5452 5532 7143 7183 6950 6990 6359 6399 7307 7347 6970 7010
S7 5802 5878 7558 7596 7369 7407 6833 6870 7827 7865 7401 7439
S6 5787 5843 7518 7546 7335 7363 6855 6883 7812 7840 7378 7406
S5 5389 5412 7002 7014 6825 6836 6408 6419 7240 7251 6880 6891
S4 6713 6689 8701 8689 8481 8469 8015 8002 9018 9006 8564 8551
S3 6676 6593 8616 8574 8402 8360 8003 7962 8974 8933 8499 8458
S2 6437 6291 8288 8215 8075 8002 7729 7656 8623 8550 8186 8113
S1 6417 6208 8237 8133 8027 7922 7727 7623 8617 8512 8150 8046

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsMain span-P20


2.5. Check

Cable Tensile Service Checking - Creep End only Strength Checking - Creep End only
Number area strength Nx max Fact. Allow. Nx max Fact. Allow.
Cable
of
No
Strands Ac f's SER su [s] S.F Check Phi STR g.Nu [N] S.F Check

(mm2) (Mpa) (KN) (Mpa) (Mpa) (KN) (KN) (KN)

3317 S17 19 2850.0 1860 2477.8 869.4 930.0 93.5% OK 0.74 3402.3 3572.4 3926.7 91.0% OK
3316 S16 22 3300.0 1860 2792.4 846.2 930.0 91.0% OK 0.74 3700.0 3885.0 4546.7 85.4% OK
3315 S15 22 3300.0 1860 2936.5 889.8 930.0 95.7% OK 0.74 3969.5 4168.0 4546.7 91.7% OK
3314 S14 31 4650.0 1860 3854.7 829.0 930.0 89.1% OK 0.74 5195.8 5455.5 6406.7 85.2% OK
3313 S13 31 4650.0 1860 4136.5 889.6 930.0 95.7% OK 0.74 5616.5 5897.3 6406.7 92.0% OK
3312 S12 31 4650.0 1860 4215.6 906.6 930.0 97.5% OK 0.74 5717.0 6002.9 6406.7 93.7% OK
3311 S11 37 5550.0 1860 4677.9 842.9 930.0 90.6% OK 0.74 6272.5 6586.1 7646.7 86.1% OK
3310 S10 37 5550.0 1860 4800.0 864.9 930.0 93.0% OK 0.74 6436.8 6758.6 7646.7 88.4% OK
3309 S9 43 6450.0 1860 5569.3 863.5 930.0 92.8% OK 0.74 7434.8 7806.5 8886.7 87.8% OK
3308 S8 43 6450.0 1860 5531.7 857.6 930.0 92.2% OK 0.74 7346.5 7713.8 8886.7 86.8% OK
3307 S7 43 6450.0 1860 5877.6 911.3 930.0 98.0% OK 0.74 7864.5 8257.7 8886.7 92.9% OK
3306 S6 43 6450.0 1860 5842.5 905.8 930.0 97.4% OK 0.74 7840.0 8232.0 8886.7 92.6% OK
3305 S5 43 6450.0 1860 5411.7 839.0 930.0 90.2% OK 0.74 7251.3 7613.8 8886.7 85.7% OK
3304 S4 55 8250.0 1860 6688.8 810.8 930.0 87.2% OK 0.74 9005.5 9455.8 11366.7 83.2% OK
3303 S3 55 8250.0 1860 6593.3 799.2 930.0 85.9% OK 0.74 8932.5 9379.1 11366.7 82.5% OK
3302 S2 55 8250.0 1860 6291.0 762.5 930.0 82.0% OK 0.74 8549.8 8977.2 11366.7 79.0% OK
3301 S1 55 8250.0 1860 6208.4 752.5 930.0 80.9% OK 0.74 8512.0 8937.6 11366.7 78.6% OK

100% SERVICE 100% STRENGTH


90% 90%

80% 80%

70% 70%

60% 60%

50% 50%

40%
40%
30%
30%
20%
20%
10%
10%
0%
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1
0%
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsMain span-P20


CABLE CHECKING
Item: Cable - Side Span P20

1. INPUT DATA
Specification: 22TCN 272-05
1.1. Material Spec. A421M-98a Strand Type 15.7 mm
Minimum specified ultimate tensile stress of prestressing stay cable f's = 1860 MPa
Minimum yield stress of prestressing stay cable fy = 1674 MPa
Modulus of elasticity of stay cable Ep = 195000 MPa
Linear density of strand gs = 0.013 KN/m
1.2. Dimentions
Area of 1 Strand Astr = 150.00 mm2
• The cables are arranged symmetrically in longitudinal and transeverse direction.
2. CHECKING
2.1. Resistance factor Load modifier = 1.05
Strength f = 0.74
Service f = 0.50
2.2. Equivalent Modulus of Elasticity
• In the inclined cables "sag" is caused by their self weight and, the cables have nonlinear
force-displacement relationships. Therefore, their linearization is needed for simplification of design.
• The equivalent modulus of elasticity proposed by Ernst formula is used for the linearization.
• Ernst formula for equivialent modulus of elasticity

E Where: E : Young's Modulus of cable


E eq  (Tangent modulus of elasticity) g : unit volumetric weight of cable
 l 2 2
1 E ℓ : cable length
12 f 1 3 f1 : initial stress (for dead load)
2.3. Detail stay cable force
Static load CR&SH Stay cable force due to service load (LL, BR, SE, TU, TG,WS, WL)
CR-SH 1 CR-SH 2 LL BR SE TU TG WS WL
Max Max Max Max Max Max Max
Cable No
DC DW EL CR&SH
During CS
30 years kN kN kN kN kN kN kN
S17 2331.5 125 -19 -82.5 -180.5 136 9 3 54 4 115 5
S16 2314 219.5 21.5 -68.5 -130.5 201 15 4 46 3 146 7
S15 2370.5 274.5 44 -53.5 -85.5 229 18 3 30 2 118 5
S14 3306 437 53 -80 -91.5 340 28 4 24 0 127 6
S13 3349.5 466 59.5 -55 -73.5 349 29 3 13 1 88 4
S12 3241.5 480 81 -36.5 -61.5 346 29 2 5 1 55 3
S11 3712 578.5 129.5 -35.5 -64 396 34 2 7 2 35 3
S10 3701.5 572 171.5 -18.5 -57 381 31 1 6 2 7 3
S9 4144.5 654 245 -11 -63.5 424 33 1 3 3 19 3
S8 3913 637.5 288 1 -66.5 403 29 4 2 3 47 3
S7 4180.5 617.5 317 12.5 -68.5 381 23 7 7 2 75 3
S6 4217.5 593 326.5 19.5 -63.5 360 17 10 14 2 103 3
S5 4321.5 566 313 19 -49 370 18 13 21 1 131 3
S4 5297.5 686.5 349.5 15.5 -33.5 530 29 21 37 0 197 4
S3 5374.5 644.5 276.5 25 5.5 612 35 26 47 6 231 5
S2 5170 607.5 174.5 31 54.5 709 41 30 57 14 264 5
S1 4939.5 566 -202.5 1 110 791 46 34 66 23 290 6

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsSide span-P20


2.4. Load factors and load combination
Load factors.
SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ

LOAD At Bridge At Bridge At Bridge At Bridge At Bridge At Bridge


At end At end At end At end At end At end
Completi Completi Completi Completio Completio Completi
creep creep creep creep creep creep
on on on n n on

DC 1.0 1.0 1.25 1.25 1.25 1.25 1.25 1.25 1.50 1.50 1.25 1.25
DW 1.0 1.0 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50
EL 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH1 1.0 1.0 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
CR+SH2 - 1.0 - 0.50 - 0.50 - 0.50 - 0.50 - 0.50
LL 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
BR 1.0 1.0 1.75 1.75 1.35 1.35 - - - - 1.35 1.35
SE - - - - - - - - - - - -
TU 1.0 1.0 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50 0.50
TG 0.5 0.5 - - - - - - - - - -
WS 0.3 0.3 - - - - 1.40 1.40 - - 0.40 0.40
WL 1.0 1.0 - - - - - - - - 1.00 1.00

Stay cable force


SER STRENGTH- Ⅰ STRENGTH- Ⅱ STRENGTH- Ⅲ STRENGTH- Ⅳ STRENGTH- Ⅴ

Cable No At Bridge At end


At Bridge
At end
At Bridge
At end
At Bridge
At end
At Bridge
At end
At Bridge
At end
Completi Completi Completi Completio Completio Completi
creep creep creep creep creep creep
on on on n n on

S17 2596 2415 3281 3191 3223 3133 3188 3098 3610 3520 3274 3184
S16 2801 2670 3576 3511 3489 3424 3402 3337 3776 3711 3555 3490
S15 2954 2868 3813 3770 3714 3671 3546 3503 3973 3930 3766 3723
S14 4152 4061 5417 5371 5270 5224 4951 4905 5600 5554 5327 5281
S13 4242 4168 5558 5522 5407 5370 5020 4983 5734 5698 5446 5410
S12 4166 4105 5475 5444 5325 5294 4896 4865 5629 5599 5350 5319
S11 4836 4772 6358 6326 6186 6154 5654 5622 6533 6501 6203 6171
S10 4851 4794 6362 6333 6197 6169 5651 5622 6566 6538 6203 6174
S9 5503 5439 7197 7165 7014 6982 6424 6392 7433 7402 7025 6993
S8 5292 5226 6894 6860 6721 6687 6203 6170 7116 7083 6743 6709
S7 5565 5497 7192 7158 7030 6996 6590 6556 7530 7496 7063 7029
S6 5582 5519 7174 7142 7023 6992 6659 6627 7569 7537 7068 7036
S5 5671 5622 7272 7248 7117 7093 6777 6752 7674 7649 7173 7148
S4 7008 6975 9013 8997 8790 8773 8311 8294 9360 9343 8873 8856
S3 7092 7097 9142 9145 8883 8886 8333 8336 9354 9356 8981 8983
S2 6881 6936 8920 8948 8620 8648 7977 8005 8900 8928 8731 8758
S1 6312 6422 8320 8375 7985 8040 7261 7316 8090 8145 8107 8162

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsSide span-P20


2.3 Factored Resistance

Cable Tensile Service Checking - Creep End only Strength Checking - Creep End only
Number area strength Nx max Fact. Allow. Nx max Fact. Allow.
Cable No of
Strands Ac f's SER su [s] S.F Check Phi STR g.Nu [N] S.F Check

(mm2) (Mpa) (KN) (Mpa) (Mpa) (KN) (KN) (KN)

### S17 19 2850 1860 2415.0 847.4 930.0 91.1% OK 0.74 3520.0 3696.0 3926.7 94.1% OK
### S16 22 3300 1860 2670.3 809.2 930.0 87.0% OK 0.74 3711.0 3896.6 4546.7 85.7% OK
### S15 22 3300 1860 2868.4 869.2 930.0 93.5% OK 0.74 3930.3 4126.8 4546.7 90.8% OK
### S14 31 4650 1860 4060.6 873.2 930.0 93.9% OK 0.74 5553.8 5831.4 6406.7 91.0% OK
### S13 31 4650 1860 4168.4 896.4 930.0 96.4% OK 0.74 5697.5 5982.4 6406.7 93.4% OK
### S12 31 4650 1860 4104.5 882.7 930.0 94.9% OK 0.74 5598.5 5878.4 6406.7 91.8% OK
### S11 37 5550 1860 4772.0 859.8 930.0 92.5% OK 0.74 6501.3 6826.3 7646.7 89.3% OK
### S10 37 5550 1860 4793.6 863.7 930.0 92.9% OK 0.74 6537.8 6864.6 7646.7 89.8% OK
### S9 43 6450 1860 5439.2 843.3 930.0 90.7% OK 0.74 7401.5 7771.6 8886.7 87.5% OK
### S8 43 6450 1860 5225.6 810.2 930.0 87.1% OK 0.74 7082.5 7436.6 8886.7 83.7% OK
### S7 43 6450 1860 5496.5 852.2 930.0 91.6% OK 0.74 7495.8 7870.5 8886.7 88.6% OK
### S6 43 6450 1860 5518.9 855.6 930.0 92.0% OK 0.74 7537.0 7913.9 8886.7 89.1% OK
### S5 43 6450 1860 5622.3 871.7 930.0 93.7% OK 0.74 7649.3 8031.7 8886.7 90.4% OK
### S4 55 8250 1860 6974.6 845.4 930.0 90.9% OK 0.74 9342.8 9809.9 11366.7 86.3% OK
### S3 55 8250 1860 7097.3 860.3 930.0 92.5% OK 0.74 9356.3 9824.1 11366.7 86.4% OK
### S2 55 8250 1860 6935.7 840.7 930.0 90.4% OK 0.74 8947.5 9394.9 11366.7 82.7% OK
### S1 55 8250 1860 6421.5 778.4 930.0 83.7% OK 0.74 8374.6 8793.4 11366.7 77.4% OK

SERVICE STRENGTH
100%
100%
90%
90%
80%
80%
70%
70%

60% 60%

50% 50%

40% 40%

30% 30%

20% 20%

10% 10%

0% 0%

S9

S8

S7

S6

S5

S4

S3

S2

S1
S17

S16

S15

S14

S13

S12

S11

S10
S17

S16

S15

S14

S13

S12

S11

S10

S9

S8

S7

S6

S5

S4

S3

S2

S1

20180822_BK. CHECK STAYED CABLE (Gama_05 lane).xlsSide span-P20


3.9 Reaction force of bearing
Unit: kN
Stage At Pier P18 At Pier P21

Finish construction stage 3471 2308

Super imposed dead load utilities 3912 2754

After creep and shrinkage 30 years 3891 3153

Due to Liveload -2804 -2803

Combine with Live load – Total (LL) 1087 350

Due to Uniform temperature -167 -167

Combine with TU – Total (LL+TU) 920 183

Due to 0.5TG (Gradient temperature) -18 -18

Combine with TG – Total (LL+TU+0.5TG) 911 174

Note:
- Unit: kN
- Legend: Positive value means compressed, negative value means uplift.
3.10 Bending moment capacity of Main girder (MG)
The bending moment capacity of MG is determined base on AASHTO standard (include consider ther load modifier 1.05)
and rebar arrangement of MG is following as bellow:

Rebar arrangement at P19 side span

Rebar arrangement at P19 center span


Rebar arrangement at P20 center span

Rebar arrangement at P20 side span


The results of checking bending moment capacity of Main girder:

Case 1: After construction (Consider 04 lanes for Liveload).

Case 2: At creep end (Consider 05 lanes for Liveload)

Conclusion: There are several sections not enough capacity for Bending Resistance, need to add more rebars on Top