The Islamic University of Gaza Electrical Engineering Department
The Islamic University of Gaza Electrical Engineering Department
Prepared by:
Amal Asaad Asaad 220170449
Sanabel Nasser AL-Haddad 220170536
Tasnim Diab AL-Tater 220171452
Submitted for:
Eng. Haya Ashraf Swedan
Gaza, Palestine
May 9, 2019
OBJECTIVES
1. To determine the transformer turns ratio
INFORMATION
A single-phase transformer will be investigated in this lab. It is a step-down
transformer
EQUIPMENT
1. Single-phase transformer
2. Variable AC source (Function generator)
3. Two Digital multimeters
4. Resistor
THEORY
The windings of a standard single-phase transformer are called the primary winding
and the secondary winding as shown in Fig.1. The primary winding is the power input
winding which is connected to the ac power source. The secondary winding is
connected to the load and is physically and electrically isolated from the primary
winding.
Normally, transformers are designed to have fixed ratios between the primary and
secondary windings. Transformers are widely used to step-up or step-down the
voltages and currents; however a transformer can also be used as a mean of electrical
isolation. The single-phase transformer that you will be using in this lab experiment
has several taps both on the primary side and the secondary side. This makes the
transformer versatile in terms of turns ratio and hence in output voltages and
currents.
Ideal Transformer
The simplest model of the transformer is called the ideal transformer and it neglects
any power losses and leakage magnetic fluxes. Assuming that the primary winding
has Np turns of wire, and the secondary winding has Ns turns, the relationship
between the primary voltage and the secondary voltage is
PRACTICAL PART
3. Open-Circuit Test
Procedure:
VSecondary
VPrimary
Rms a= Vp/VS
Peak (v)
(v)
(v)
4. Short-Circuit Test
The transformer’s secondary terminals are short-circuited and the primary voltage is
supplied with the voltage, much reduced comparing with the rated value (Figure 4.6).
In practical situation, this voltage is adjusted so that the primary current is
approximately rated, and the primary current (Ip), seconadry current (Isc) are
measured.
Procedure:
20 6.4 0.32
30 9.6 0.32
40 12.8 0.32
50 15.8 0.316
5.With load
Procedure:
Results
V1 V2 I1 I2 Z1 Z2 a