Requirements Checklist For Bldg. Permit. Rev. 02

This document outlines the requirements and checklist for obtaining a building permit from the Office of the Municipal Engineer/Building Official in Guiguinto, Bulacan. It lists the necessary plans, forms, clearances, and documents that must be submitted, including architectural, structural, plumbing, electrical, and mechanical plans signed by licensed professionals; building, sanitary/plumbing, electrical, and mechanical forms; locational clearance; barangay clearance; land titles and taxes; soil tests; and fire safety clearance. Proper licenses and identification must also be provided for all professionals involved in the building's design.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
314 views1 page

Requirements Checklist For Bldg. Permit. Rev. 02

This document outlines the requirements and checklist for obtaining a building permit from the Office of the Municipal Engineer/Building Official in Guiguinto, Bulacan. It lists the necessary plans, forms, clearances, and documents that must be submitted, including architectural, structural, plumbing, electrical, and mechanical plans signed by licensed professionals; building, sanitary/plumbing, electrical, and mechanical forms; locational clearance; barangay clearance; land titles and taxes; soil tests; and fire safety clearance. Proper licenses and identification must also be provided for all professionals involved in the building's design.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Form No.

MEO-015-Ø

REQUIREMENTS/CHECK LIST FOR BUILDING.


 PHOTO COPY OF CURRENT PTR & PRC ID OF:
PERMIT  Civil Engineer
(Office of the Municipal Engineer/Building Official – Guiguinto, Bulacan)
 Architect
Name of Owner __________________________________________  Professional Electrical Engineer
Location ________________________________________________  Registered Electrical Engineer
Project _________________________________________________  Sanitary Engineer
 Master Plumber
I. Six (6) sets of PLANS (SCALE 1:100)  Professional Mechanical Engineer
 ARCHITECTURAL - Signed and Sealed by a duly licensed  Geodetic Engineer
Architect.
 STRUCTURAL - Signed and sealed by a duly licensed Civil The applicants should fill-up the necessary forms:
Engineer. FIVE (5) COPIES OF:
(For two (2) storey building & above-signed and sealed by a  BUILDING FORMS- Signed and sealed by a duly licensed
licensed structural engineer) Architect / Civil Engineer /Structural Engineer
 PLUMBING/SANITARY - Signed and sealed by a licensed (DULY NOTARIZED)
Sanitary Engineer/Master Plumber (except in those areas  SANITARY/PLUMBING FORMS – Signed and sealed by a
exempted or not required by the Building Official under the licensed Sanitary Engineer/Master Plumber.
National Building Code)  ELECTRICAL FORMS- Signed and sealed by a licensed
 ELECTRICAL – Signed and sealed by a Professional Electrical Professional Electrical Engineer.
Engineer. (In-charge part of the forms- Signed and sealed by a
 MECHANICAL - Signed and sealed by a Professional licensed Registered Electrical Engineer)
Mechanical Engineer.  MECHANICAL FORMS - Signed and sealed by a licensed
 SPECIFICATIONS - Signed and sealed by a duly licensed Mechanical Engineer /Professional Mechanical Engineer.
Architect/Civil Engineer.
 COST ESTIMATES/BILL OF MATERIALS - Signed and sealed by a  AUTHORIZATION LETTER- in the absence of the owner.
duly licensed Architect/Civil Engineer. SECRETARY CERTIFICATE- (For Corporation)
 STRUCTURAL DESIGN ANALYSIS - Signed and sealed by a duly
licensed Civil Engineer. (For two (2) storey & above- Signed  CONSTRUCTION SAFETY & HEALTH PROGRAM (D.O.L.E.)
and sealed by a licensed Structural Engineer.) Assume Soil
Bearing Capacity (90 KPA Below)  PHOTO COPY OF THE OWNER’S COMMUNITY TAX RECEIPT (CTC)
 ELECTRICAL DESIGN ANALYSIS – (Design Analysis, Short
 PHOTO COPY OF ANY VALID I.D.
Circuit Calculation & Voltage Drop) (DPWH Circular No.
02, Series of 2015). Signed and sealed by a licensed
 FOR COMMERCIAL & INDUSTRIAL BUILDING:
Professional Electrical Engineer.
 Environmental Compliance Certificate (ECC)
 LOT PLAN W/ VICINITY MAP - Signed and sealed by duly
 Accessibility Plans (Batas Pambansa 344)
licensed Geodetic Engineer.
 FOR CELLSITE & TELECOMMUNICATION TOWER
 PHOTO COPY OF ZONING/LOCATIONAL CLEARANCE
 Environmental Compliance Certificate (ECC)
- Proceed to the office of the Deputized Zoning Officer located
 Barangay Resolution
at the 3rd floor right wing of Municipal Building
 S.B. Resolution
 PHOTO COPY OF BARANGAY CLEARANCE- Permit to  No. of Neighbors Certificate from Barangay Council
construct. (For Bldg. Permit & Electrical Permit)  Certification from the office of Agrarian Reform
 Air Transportation Office (ATO) Clearance
 HOME OWNERS ASSOCIATION CLEARANCE / DEVELOPER’S  Health Clearance from the Department of Health.
CLEARANCE
LIKE US ON FACEBOOK: engineering.guiguinto
 PHOTO COPY OF T.C.T. (Transfer Certificate of Title) Download Forms & list of requirements.
(In case the applicant is not the registered owner of the lot) Legend:
PHOTO COPY of any of the following:
o Contract of Lease
For Construction outside residential and
o Contract of Sale
commercial/Industrial Subdivision
o Deed of Absolute Sales

 PHOTO COPY OF LATEST LAND TAX DECLARATION &


CURRENT REAL PROPERTY TAX RECEIPT

 TWO (2) COPIES OF SOIL BORING ANALYSIS/TEST


- For Three (3) storey building and above.

 FIRE SAFETY EVALUATION CLEARANCE / FIRE SAFETY


INSPECTION CERTIFICATE
-Guiguinto Fire Station / Fire Department